ML20154F099

From kanterella
Jump to navigation Jump to search
Confirms 880915 Enforcement Conference in Region IV Ofc to Discuss Violation Noted in Investigation Rept Case 4-88-004 Re Improper Fire Watches & Failure to Include Appropriate Acceptance Criteria in Closing Maint Work Request
ML20154F099
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/09/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
EA-88-216, NUDOCS 8809190253
Download: ML20154F099 (3)


Text

,

1 ,

.. s SEP 9m In Reply Refer To:

Dockets: 50-498/88-46 50-499/88-46 EA 88-216 i

Houston Lighting & Power Company ATTN: J. H. Goldberg, Group Vice President. Nuclear P.O. Box 1700 Houston, Texas 77001 Gentlemen:

This is to confim arrangements made with you during telephone conversations with Region IV staff on August 23 and 30, 1988, for an Enforcement Conference in the Region IV office on September 15,1988,at9:00a.m.(CDT).

The purpose of the Enforcement Conference is to discuss an apparent violation regarding improper fire watches as documented in NRC Investigation Report Case 3

No. 4-88-004, and an apparent violation regarding a failure to include

appropriate acceptance criteria in closing out a maintenance work request as documented in NRC Inspection Report 50-498/88-46. The referenced 1

investigation report synopsis and inspect *.on report were forwarded to you under separate cover. A proposed meeting agenda is enclosed.

Should you have any questions concerning these arrangements, we will be pleased so discuss them with you.

) Sincerely.

l Onlinal kned By:

! C.J. CALLAN L. J. Callan Director Division of Reactor Projects l

Enclosure:

Proposed Agenda

, cc/ enclosure:

Houston Lighting & Power Company Newman & Holtzinger, P.C.

ATTN: M. A. McBurnett, Manager ATTN: J. R. Newman, Esquire 7

Operations Support Licensing 1615 L Street, N.W.

j P.O. Box 289 Washington, D.C. 20036 Wadsworth, Texas 77483 i

p W i C:PSD b

E(f D:t -M D:DRP EHoller:cs GT ' rn JMI huan LCallan 9/ ') /88 9/g/88

{ 9/f/88 9/$/88 l

j 8809190253 880909 PDR ADOCK 05000498

/ ) t Q PDC -

{

I ,

Houston Lighting & Power Cc.rpany Houston Lighting & Power Company Houston Lighting & Power Company  ;

ATTN: Gerald E. Vaughn, Vice President ATTN: S. L. Rosen l Nuclear Operations P.O. Box 289 P.O. Box 289 Wadsworth, Texas 77483 Wadsworth, Texas 77483 Houston Lighting & Power Company Houston Lighting & Power Company l ATTN: J. T. Westenneier, General Manager ATTN: R. W. Chewning, Chainnan South Texas Project Nuclear Safety Review Board ,

P.O. Box 289 P.O. Box 289 l Wadsworth, Texas 77483 Wadsworth, Texas 77483 Central Power & Light Company City Public Service Board ATTN: R. L. Range /R. P. Verret ATTN: R. J. Costello/M. T. Hardt P.O. Box 2121 P.O. Box 1771 Corpus Christi, Texas 78403 San Antonio, Texas 782P6 City of Austin Electric Utility Houston Lighting & Power Company ATTN: R. J. Miner, Chief Operating ATTN: Licensing Representative Officer Suite 610 721 Barton Springs Road Three Metro CentLe Austin, Texas 78/04 Bethesda, Maryland 20814 Texas Radiation Control Program Director bectoDMB(IE01) bec distrib. by RIV:

1 DRP RRI-005 R. D. Martin, RA DRS SectionChief(DRP/0) RPB-ORSS i

MIS System RIV File '

Lisa Shea, RM/ALF RSTS Operator R. Bachmann, OGC D. Hunnicutt

' G. Dick, NRR Project Manager G. Cant, OE J. Lieberman, OE L. Chandler, Asst. GC/0GC T. Martin, DEDRO RRI-CONST

$ e.

t ,

l i

PROPOSED AGENDA  !

HOUSTON LIGHTING Ai40 POWER COMPANY (HL&P)

September 15, 1988, 9:00 a.m.

i I. INTRCDUCTION AND PURPOSE OF MEETING L. J. Callan, Director i Division of Reactor Projects  !

!!. IMPROPER FIRE WATCHES L. J. Callan, Director  ;

Division of Reactor Projects  !

LICENSEE ComENTS HL&P Representative DISCUSSION t

!!!. IMPROPER CLOSE0VT OF MAINTENANCE J. L. M11hoan, Director t WORK REQUEST Division of Reactor Safety i 9

LICENSEE COM ENTS HL&P Reprenntative l DISCUSSION l IV. ENFORCEMENT POLICY G. F. Sanborn, Enfo % ment Officer  ;

V. LICENSEE CLOSING COM ENTS HLAP Cepresentative i

VI. NRC CLOSING Com ENTS L. J. Callan, Director i Division of Reactor Projects [

l i

1 i

i h

i i

l

_ _ _ - _ _ _ .