ML20154E718
| ML20154E718 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/12/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20154E722 | List: |
| References | |
| NUDOCS 8805200303 | |
| Download: ML20154E718 (2) | |
See also: IR 05000482/1988007
Text
. _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ - _ _ _ _
_ _ _ _
_
_ _ _ _ _ _ _ - _ _ . _
_ _ _
_-
_ _ _ _ -__-___-_--_____
A :
-
<
,
.
In Reply Refer To:
E l2 E-
Docket:
STN 50-482/88-07
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.-0. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to the inspection conducted by Messrs. B. L. Bartlett and M. E. Skow
of this office during the period February 15 through March 31, 1988, of
activities authorized by NRC Operating License NPF-42 for the Wolf Creek
Generating Station, and to the discussion of our findings with Mr. G. D. Boyer
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included review of "Safety Outage
Modifications Inspection" items, operational safety verification, engineered
safety features system walkdown, monthly maintenance observation, monthly
surveillance observation, onsite event followup, radiological protection, and
physical security.
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
and observations by the NRC inspectors.
The inspection findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
.of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
.Your. response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
-
by the Paperwork Reduction Act of 1980, PL 96-511.
R V:0 / SRI
V
/RRI
C R /A
D/D
BLBartlett:sa
MESkow
DDChamberlain
LJCallan
J/p/88
y/f/88
f/f/88
T/// /88
/ Go!
,
8805200303 880512
gDR
ADOCK 05000482
-
._ __.____ _ ,_
~.
._- _
-_ _ __ _ _ . .- _ _ _ . . _ , _ . , _ _ , _ ,
.
.
.
.
.
F
Wolf Creek Nuclear Operating
-2-
Corporation
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Ori;inal Eg aJ bj,
L. 7 C.
'
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/88-07
cc w/ enclosures:
Otto L. Maynard, Manager of Licensing
Wolf Creek Nuclear Operating Corporation
P. O. Box 411
Burlington, Kansas 66839
Gary Boyer, Plant Manager
Wolf Creek Nuclear Operating Corporation
P. O. Box 411
Burlington, Kansas 66839
Mr. Robert D. Elliott, Chief Engineer
Kansas Corporation Commission
Fourth Floor, Occking State Office Bldg.
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01)
bcc distrib. by RIV:
- PS/A
Myron Karman, ELD, MNBB (1)
- RRI
R. D. Martin, RA
- Section Chief, (PS/A)
- RSPB-DRSS
J. M. Hinds, RIII
^RIV File
Callaway RRI, RIII
- Project Engineer, DRP/A
- MIS System
- A.
B. Beach
- RSTS Operator
- L.
Shea, RM/ALF
- TSS
- w/766
L