ML20154E599

From kanterella
Jump to navigation Jump to search
Forwards Best Estimate of Exam Needs for Plant in Response to Generic Ltr 88-13, Operator Licensing Exams
ML20154E599
Person / Time
Site: Yankee Rowe
Issue date: 09/08/1988
From: Papanic G
YANKEE ATOMIC ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
FYR-88-122, GL-88-13, NUDOCS 8809190068
Download: ML20154E599 (2)


Text

_ _ _ _ - _ - -

,e Tecphon2 (6t?) 072 0100 Twt ilo 380 N19 YANKEE ATOMIC ELECTRIC COMPANY 1671 Worcester Road, Framingham, Massacha.;etts 01701 w -,

September 8, 1988 FYR 88-122 United States Nuclear Regulatory Coxsission Document Coatrol Desk Washington, DC 20555 Referencess (a) License No. DPR-3 (Docket No. 50-29)

(b) USNRC Letter to Yankee, dated August 8,1938 Subject Response to Generic Letter 88-13, "Operator Licensing Examinations" Dear Sir As requested in Reference (b), we have attached our best estimate of examination needs for Yankee Nuclear Power Station. We trust that this information is satisfactory; however, if you have any questions, please contact us.

Very truly yours, YANKEE ATOMIC ELECTRJC COMPAVY O

George Papanic*, Jr. */

/

Senior Project Engineer - Licensing GP/15.1053

  • Attachment cet USNRC Region I USNRC Resident Inspector. YNPS USNRC Regionti Administrator, Region I Mr. John Hannon, USnC NRR 1

8809190060 DR COO 900 y ADOCK 05000029 , \

PNU 4 -.

l .

, .. ,. j i

Enclosure 1 ,

I

  • i

(

r f

PROPOSED OPERATOR LICENSING EXAMINA(10N SCHEDULE FORMAT Facility Yankee Nuclear PoweLStation NRC Region i ,

FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89) (10/1/89-9/30/90) (10,'1/90 9/30/91) (10/1/91-9/30/92) [

1. Date 8/89 5/R  ?/91 A/c) {

t a

  1. RO {
  1. SRO Instant 2 , [

l

  • iSRO Upgrade 3 3 -

I

  1. 5R0 Limited l
2. Date 10/89 6/91
  1. RO 4 4
  1. SRO Instant ,_ _

E

  1. $RO Upgradie _

l

  1. 5R0 Limited _

l Please indicats initial cold license examinations by placing an asterisk (*)

by the date. Pleass indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be exawined to extend their licenses to j Unit Two, then indicate "R0 3.5".")

i l

i

,e .,*

Enclosure 2 PROPOSED REQUALIFICATION EXAM!hATION SCHEDULE FORMAT Facility Yankee Nuolear Power Station fiRC Region 1 FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89) (10/1/89-9/30/90) (10/1/90-9/30/91) (10/1/91-9/30/92)

1. Date Date 1/90 Date 7/91 Date
2. Date Date Date Date
3. Date Date Date Date__
4. Date Date Date Date ,

.