ML20154E413
| ML20154E413 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/13/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20154E416 | List: |
| References | |
| NUDOCS 8809160317 | |
| Download: ML20154E413 (3) | |
See also: IR 05000267/1988015
Text
. _ _ . _
_ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _
.__ -__ .
SEP l 3 iscs
-
f
,
in Reply Refer To:
Docket:
50-267/88-15
,
Public Service Coepany of Colorado
ATTH: Robert O. Wilitams, Jr.
Vice President. Nuclear Operations
i
2420 W. 26th Avenue. Suite 15C
l
Denver Colorado 80211
Gentlerren:
!
'
This refers to the inspection conducted by Messrs. 1. Bernes and R. G. Taylor
'
of this office during the period July 11 through August N 1988, af the
activities authorized by NRC Operating License DPR 34 for the Fort St. Vrain
Nuclear Generating Station, and to discussion of our findings with Mr.
'
R. O. Williams and other members of your staff at the conclusion of the
i
inspection.
,
Areas examined during the inspection included licensee event report followup,
control of design changes and inodifications, and your activities related to
refurbishment of the reactor helium circulators. Within these areas. the
inspection consisted of selective examination of procedures and represei.;;ative
-
records interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were i'-
t
i
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordtnce with the provisions of
'
,
Section 2.201 of tne NRC's "Rules of Practice." Part 2. Title 10. Code of
Federal Regulations. Your response should be based on the specifics contaired
in the Notice of Violation enclosed with this letter.
f
1
One unresolved item is identified in paragraph 5.d of the enclosed inspection
report.
>
Also during this inspection, it was found that certain of your activities
appear to deviate from comitments made to the NRC. This item and references
to the comitment is identified in the enclosed Notice of Deviation. You are
i
requested to respond to this deviation in writing.
Your response should be
e
based on the specifics contained in the Notice of Deviation enclosed with this
!
letter.
!
RIV:RI*
C:MQPS*
0:0 * /J
0:0k4 M
RTaylor/cjg
!Barnes
JLHIhoan
LJCallak
/ /SS
/ /83
- f /M/83
-[/6/88
j
-
J
- previously cencurred
p
pm ugir
y
,
i
l
-
--
-
- - -
- - -
.,
_________ _ _ - __
-_
- _ _ - _
_-__ _ _ ____ ____
,
.
[
/
'
.
Public Service Company of Colorado
-2-
1
j
We have also examined actions you have taken with regard to previously
irtentified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
<
The inspection report (Section 2.b) notes that while progress has been made to
improve your corrective action program, management needs to direct renewed
emphasis toward further improvement in the program. Of particular concern is
the relatively large rumber of Nonconfonnance Reports from 1986 and earlier
'
that are unresolved for a variety of reasons.
Further managen nt attention is
needed relative to the corrective action program.
The inspection report identifies apparent v ulations related to helium
l.
circulator installation without appropriate authorizatien and failure to
)
control special 3rocesses. While written response is required within 30 days
of the date of tiis letter, we also believe it is appropriate to meet with
1
you to obtain an earlier indication of how you plan to address the technical
1
aspects and generic implications related to the apparent violations. We will
j
contact you separately to arrange a convenient time for a management meeting
which should be held prior to restart from the present outage.
,
The responses directed by this letter and the accorrpanying Notices are not
subject to the clearance procedures of the Office of h tagement and Budget as
required by the Paperwork Reduction Act of 1980. PL 96-511.
)
Should you have any questions concerning this inspection, we will be pleased to
'
]
discuss them with you.
4
Sincerely,
s
ora.:
I Dy
t . L Culm
,
L. J. Callan. Director
4
Division of Reactor Projects
}
a
1
cet
!
Fort St. Vrain Nuclear Station
j
Manager. Nuclear Production Division
t
16805 WCR 19)
Platteville. Colorado 80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager. Quality
i
l
Assurance Division
l
(sameaddress)
i
!
Colorado Radiation Control Program Director
i
Colorado Public Utilities Comission
1
j
'
.--
-
. -
-
-
-
__ -_ - ___ ______ __
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
-
.
,
.
.
Public Service Company of Colorado
-3-
bec to DNB (!E01)
i
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
- Section Chiet (ORP/B)
- Project Engineer, ORP/B
- RPB-DRSS
Lisa Shea, RW/ALF
- MIS System
- RSTS Operin
- K. Heitner, NRR Project Manager
- RIV File
- DRS
- DRP
- !. Barnes
- R. Taylor
- w/766
!
!
.
l
,
i
(
I
I
f
1
i
r
!.
!
!
l
-
-
.
.
-
- -
.
-
_