ML20154D535
| ML20154D535 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/10/1988 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20154D540 | List: |
| References | |
| NUDOCS 8805190225 | |
| Download: ML20154D535 (3) | |
Text
.
~
.u - + 3,
4' I
Altbsma Power Company 6(O North 18th Stre$t p
P% office M 2641 -
I B.rmingham, Alabama 352914400
' Telephone 205 250-1835 R. P. Mcdonald Alabama Power Senio. Vice President Ite southern ekctrc sprem 10 CFR 50.90 May 10, 1988 Docket Nos. 50-348 50-364 t
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Vashington, D.C.
20555 Gentlemen:
l Joseph M. Farley Nuclear Plant - Units 1 and 2 Proposed Organization Technical Specification Change 6
Alabama Power Company proposes to revise references to the corporate management position of Ser.ior Vice President to remove unnecessary details from the Technical Specifications. The ref rence to Senior Vice President is changed to vice president.
Additiona:
the reference to Senior Vice President was deleted from 6.5.1.8 since o.5.2.2 already defines the NORB Chairman to be the vice president. The more general reference to the vice president vould reduce the need for license amendmeats to reflect title changes while still maintaining an executive position that has corporate responsibility for oversight of activities affecting safety.
The proposed Technical Specification changes are provided in Attachment 1.
Alabama Power Company has determined that the proposed changes do not involve a significant hazards consideration.
In accordance with 10 CFR 50.92, a significant hazards consideration evaluation is provided in.
Alabama Power Company's Plant Operations Review Committee has reviewed these proposed changes and the Nuclear Operations Review Board vill review these proposed changes at a future meeting.
NRC approval of this change is requested as soon as practicable.
In letter dated April 28, 1988, Alabama Power Company requested the deletion of offsite and onsite organization charts (Figures 6.2.1 and 6.2-2) from Technical Specifications 6.2.1 and 6.2.2.
Page 6-1 for Units 1 and 2 of the April 28, 1988 letter should be replaced with Page 6-1 in Attachment 1.
Pursuant to 10 CFR 170.21, the required License Amendment Application Fee of $150.00 is enclosed. A copy of this proposed change has also been sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR MO f 50.91(b)(1).
'I 8805190225 880510 ullckdCMLkg l
PDR ADOCX 05000348 i
DCD P
U. S. Nuclear Regulatory Commission May 10, 1988 Page 2 If there are any questions, please advise.
Respectfully submitted, ALABAMA POWER COMPANY al. A. &
-E "M
R. P. Mcdonald RPM /BDM TS2-8.2 cc Mr. L. B. Long SVORN TO AND SUBSCRIBED BEFORE ME Dr. J. N. Grace Mr. E. A. Reeves TH
/d DAY OF a4
, 1988 hab k.
/-
Mr. V. H. Bradford Dr. C. E. Fox NotaryPuyffe My Commission Expires: k-/!"hh I
l
l i
ATTACIDENT 1 I
-Proposed Changed Pages Unit 1
~. Revision Page 6-1 Replace f
Page 6-6 Replace Page 6-9 Replace Page 6-11 Replace l
Page 6-12 Replace 1
Page 6-13 Replace Page 6-14 Replace i
Unit 2 Revision 2
Page 6-1 Replace Page 6-6 Replace Page 6-9 eplace i
Page 6-11 Replace Page 6-12 Aeplace 3
Page 6-13 Rcplace 4
Page 6-14 Replace i
9 h
I
[
i i
l F
I 2
)
l l
l I
1 1
t i
l 4
I l
I t
f
, _....... _ _,, - _. ~ _,
- _, _ _, - - _. - _ _. _. - -, - -