ML20154D348

From kanterella
Jump to navigation Jump to search
Forwards Completed Assignment for Reviewing Background Material Re Allegation 4-96-0227
ML20154D348
Person / Time
Issue date: 10/17/1996
From: Whitemore J
NRC
To: Powers D
NRC
Shared Package
ML20154D336 List:
References
FOIA-98-183 NUDOCS 9810070196
Download: ML20154D348 (4)


Text

I f

I l

To AP e/(k' #

l Date:

10/17/06 2 07pm

Subject:

AJtegation Assessment

' 0227 '

. Attached as my completed assignment for reviewing the background matertal related to Allegation l.

t --

i l

l l

l I

l-l l

l 4

l 9810070196 980930 PDR FOIA KNUD80N98-183 PDR I

(

% 100101%

3

~w a

EXHIBIT 5 Information in this record was deleted in accordxe with it.; Frss?; l ef inictmation Act,'exenistions _. /'d_

F01A-9f~/f1 EXHIBIT

CASENg, 4-96-056 a

,kiYod f6 g//

(

(

f ALLEGATION ASSIGNMENT FORM h gl p

7 Allegation Number. RfV-96-A-0227) gE Licensee / Facility or Location: SAN ONOFRE Discussed at ARB meeting on: 10/11/96 Assigned to: DRP, DRS, DNMS, SAC Branch:

O! involvement?

01 tracking number:

llegation Summary: Alleged termination for orting safety concerns. The initividual workedin the nddealtprimarily wit The individual alleges that beginning in 5/93 and untiQhi&ennination i hat he attempted to have the licensee address numerous safety issues and no filed a DOL complaint ing'that is&pctwn was taken by performance appraisals and eventually

'as terminated after SCE eliminate is ob. The individual surrently under review. Additionally, t e al eger has submitted approximately 100 pages of background information.

RB instructions / guidance:

ARB Chairman:

Date:

Alkytjon Resolution Flan (return to the SAC within 10 days of ARB meeting):

h 9 0 4 - N\\ci d b t d -

b uu; d' sad 2ide - k M b.

bC b % M - CWM

  1. A 4

1/ #ws Y Avuv

.b/

Mb h-MkCKllt Dr Ab.,

tw o

p Submitted by:

Date:

cc: Allegation File. ARB Meeting File. 01 i

EXHIBIT 2

CASEil0.

4 - 9 'c - 0 5 6

/ _cf pages

c c

g y

ALLEGATION ASSIGNMENT FORM AHegation Number-) ftIV-960A-0227 Licensee / Facility: SAN ONOFRE ARil Date: 10/28/96

> 120 days: 1/30/97 > 180 days: 3/31/97 Assigned to: DRP, DRS, DNMS, SAC Branch:

Referral to Licensee:

Referral Criteria Reviewed:

01 involvement?

01 Case Number:

ARB Recommended Priority:

Allegation Snmmary: This allegation was related to alleged terminationfor reporting safety concerns abo ARB met on 10/11/96 and assigned Of to interview the alleger after the 10/2 96 ARB. DRS was to review the data. DRS responded on 10/17/96, documenting theirreview

\\

and recommendadons for addressing the technical issues.

i ARB Instructions:

ARB Chairman:-

Date:

Allecation Resolution Plan (return to the SAC within 10 days of ARB meeting):

b b

om^

ud-M b

V

%, c.s:. m cs Submitted b.s:

Date:

ARD Attendecs:

,DRP

, D RS

, DN?,iS W. l.. Ilrou n, RC 1.. n'illiamson, Of R. Wise, S AC R..\\lullikin,.\\C_

, Enforcement Other:

EXHIBIT F

cc: Allegation File, ARH)lecting File O!

9 7

i 4

l l

l w.m.

e EXHIBIT 8 Information in this record was deleted in accordance with the Freedon c.f Information Act,'ex nl tions __ I6 I ' I'IO F0IA -

EXHIBIT CASEN0.

4-96-056 fx $ w WL

.) 11