Application for Amend to License DPR-59,increasing Authorized Max Power Level by Approx 4.1% to 2536 Mwt from Current Limit of 2436 Mwt
ML20154D246
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/12/1992
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC
Shared Package
ML20154D245 List:
References
NUDOCS 9810070174
Download: ML20154D246 (2)


Text

-. -...-

~ -

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the matter of

)

NEW YORK POWER AUTHORITY

)

Docket No. 50 333 James A. FitzPatrick Nuclear Power Plant

)

APPUCATION FOR AMENDMENT TO OPERATING UCENSE The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating Ucense DPR-50 for the James A. FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulations.

The proposed amendment to the James A. FitzPatrick Technical Specifications proposes to increase the authorized maximum power level by approximately 4.1 percent to 2536 megawatts thermal from the current limit of 2436.

The analyses and evaluations supporting these changes were completed using the guidelines in General Electric Topical Report NEDC-31897P A ' Generic Guidelines for General Electric Boiling Water Reactor Power Uprate." Generic issues associated with power uprate were addressed for FitzPatrick in another General Electric Topical Report NEDC-31964P ' Generic Evaluations of General Electric Boiling Water Reactor Power Uprate." These reports sre proprietary and have been submitted separately to the NRC by General Electric.

The signed original of the Application for Amendment to Operat r;; Ucense is enclosed for filing. Attachments I and 11 to this application contain the prte-M changes to the Technical Specifications and the aanded Safety Evaluation.

The James A. FitzPatrick safety evaluation for power uprate is in Attachment lil, General Electric Report NEDC-32016P ' Power Uprate Safety Analysis for the James A. FitzPatrick Nuclear Power Plant." This safety evaluation complies with the guidelines of NEDC-31897P A and supplements the generic evaluations of NEDC. 31964P. In accordance with the provisions of 10 CFR 2.790, those pages of NEDC-32016P containing proprietary information (labelled "GE Proprietary Information" at the top of each page) should be withheld from public disclosure. Attachment IV is General Electric's affidavit attesting to the proprietary nature of this infomtation.

~

9910070174 920612' DR ADOCK 05000333 PDR

l Attachment V is NEDC-31317P 1,

  • SAFER /GESTR Loss-of-Coolant Ace! dent Safety l

Analysis Report" for the James A. FitzPatrick Nuclear Power Plant. This report i.

summarizes loss of coolant accident analyses performed at this new uprate power level. These analyses used the SAFER /GESTR methodology and previously i

l licensed fuel designs as outlined in NEDC-31897P A. In accordance with the provisions of 10 CFR 2.790, those pages of NEDC-31317P 1 contain proprietary Information and should be withheld from public disclosure. Attachment VI is General Electric's affidavit attesting to the proprietary nature of the information contained in NEDC-31317P 1.

New York Power Auttiortty si r c

Ralph E. Beedle Executive Vice President Nuclear Generation STATE OF NEW YORK COUNTY OF WESTCHESTER sworn to be/p

' ore me Subscribed day of 1992.

this / 1.

l Notary Public MINA HOLDEN NOTARY PUeUC, ames of New Yosk WesenheeterCausuy No.4820160 My cosuussion Espise Aug.31, tses e

o l