ML20154D121

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Emergency Plan Implementing Procedures,Including Index,Rev 2 to EPIP-17, Onsite/Offsite Surveys & Sampling & Rev 2 to EPIP-28, Personnel Monitoring & Decontamination. W/860227 Release Memo
ML20154D121
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/13/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20154D125 List:
References
ANPP-35047-EEVB, NUDOCS 8603050508
Download: ML20154D121 (6)


Text

r Arizona Nuclear Ptywor Project P o Box 62034 e PHotNix, Am2oNA 80072 2034 February 13. 1986 Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528 (License NPF-41)

STN 50-529 (License NPF-46)

STN-50-530 Emergency Plan Implementing Procedure Update Filet 86-056-026t 86-002-493 Dear Mr. Martint Arizona Nuclear Power Project (ANPP) is submitting herewith, pursuant to 10CFR50, Appendix E, updated information in the form of copy no. 8-8 of implementing procedures for the Emergency Plan. The revisions made to the existing plan involve Emergency Plan Implementing Procedures (EPIP's) 02, 03, 04, 05, 06, 11, 12, 13, 14, 15, 19, 20, 21, 24, 25, and 31. Additionally, we are forwarding Arizona Nuclear Power Project Administrative Procedure 8N718.04.00, Revision 3. We are also including revised cover sheets for those EPIP's listed in the attached cover sheet listings.

In accordance with Generic letter 81-27, certain EPIP's have been marked to indicate information considered private or proprietary (including names, home telephone num-bers, and internal and external telephone numbers that must remain available during an emergency). The specific information considered private or proprietary has been bracketed in the respective pages of the following EPIP's:

EPIP No.

PAGE No.

EPIP #02 PCN 01 Rev. 4 EPIP #3 Rev. 10 pp 7, 10, 11, 12, 25 /

/

EPIP #4 Rev. 9 pp 9, 11, 13, 14, 29, 33, 36 EPIP #5 Rev. 9 pp 9, 10, 11, 12, 13, 29, 33, 37j EPIP #6 Rev 9 pp 8, 10, 11, 12, 13, 29, 33, /.

37 EPIP #11 Rev. 5 pp 16, 17, 18, 19, 20, 39, 42 EPIP #12 Rev. 5 p 8/

EPIP #13 Rev. 5 pp 20, 22, 27, 29, 34, 49 #

l EPIP #14APCN 02 Rev. 6 l

EPIP #15 PCN 01 Rev. 3 EPIP #19 Rev. 4 EPIP #20 Rev. 4 pp 5, 9,11,13,14,16,17,18 19, 23, 24, 27 /

EPIP #21 Rev. 4 EPIP #24 PCN 01 Rev. 3 EPIP #25 Rev. 4 060305050s g60213 EPIP #31 Rev. 4 PDR ADOCK 05000D20 p

VDR

\\\\

lt

Mr. John B. Martin Emergency Plan Implementing Procedure Update ANPP-35047 Page 2 We request the above information' be considered confidential and withheld from public disclosure pursuant to 10CFR2.790(a) and 10CFR9.5(a).

l Two copies (8-9A and 8-9B) of the revisions are herewith forwarded to the Document Control desk, USNRC, as specified in Section V of Appendix E to 10CFR50.

i Additional copies of these revisions are being forwarded to Gail Temple (8-5) and Falk Kantor (8-6) of the NRC.

i Very tr'ly yours, f

u CCLL dotu;~

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/DAL/rw Attachments cc E. A. Licitra (w/o)

A. C. Gehr (w/o)

R. P. Zimmerman (w/o)

G. M. Temple (copy #8-5)

F. Kantor (copy #8-6) t NRC Document Control Desk (copies #8-9A ant. 8-9B) l l

7 i

1 i

l l

l

{

~

CONTROLLED DOCUMENT

.~

EMERGENCY PLAN IMPLEMENTING PROCEDURE TRANSMITTAL CONTROLLED DOCUMENT LIST 1

,3 EPIP s..

V.

Elish 6-A Unit 1 Contro 5-2R G. Fiore111 8-1 Kria Oberdorf 5-6 R. Selman 5-37

.Darrel Miaaen 3-2

,Jg el._Qrlovski 12-22 Unit 1 Radvaste 5-43 Como11ance 5-17 Frank Warriner 3-3 Leon Brown 5-33 T. Warren 5 - 2_1_

J. G. Sarver 5-102 Startup Complex (Upstairs) 2-10A V. Rhoden 1-1 Thomas P. H111mer 5-121 D

T. Exum 5-40 H.

Rogers /TSC 5-94 DDC Library 1-2 M. W. Lantz 5-35 TSC 3-5 Penny Egebrecht 5-91

_cn1nn oinnn 3-8 Harry Bielina 17-9 Steve Grove 3-L cernia mir4ein 5-12g Greg Roetteer 5-112 J. Cederouint 5-20 Maintenance Mananer 3-11 T. Shriver 5-8 TSC E Plan Anal 3-5A T. Barnuk 5-86 D. Best 5-88 Unit 2 Control Room 5-25 R. Johnson 5-42 Bob Adnev 5-93 See Cpt 15-1 E-Michael Deblo 5-41 D.

Fasnacht 19-1 EeF 17_-I A M. Zimmerman 20-1 J

_EO F 17-1B Jim ge, John 14-47, EOF 17-lC F0F Dan Canndv l '1-I. 2 17-lD F

EOF (Room 12) 17-lE WRF/DDC 1-7 EOF 17-lF G

git 2 Rad Drotection 5-95 Unit III_rentrol Rm.

5-39 Unit 111 16C 3-33 Martha Poettner 5-114 Unit III Radiation Protection 5-9 ti Mike Crusa 17-4 FOR NRC

.L._.Vt. n_ Qun:N/t.057.}l/?'RC LETTER ON R/A M.L. Civde 5-79 Jack Martin /Adm.

8-8 ~

Document Cont. Desk 8-9A Dennis Yova 5-36 Bill Knighton 15-2 Gail !!. Temple 85

_Ru9s Pnnvorth 5-7

_Falk Kantor 8-6

_ Bruce Ranh 13-18 9an Phillips 13416 B

_J. M. Allen PROCEDURE CROUP 5-31 W. Fernov Dennis Yows 5-36A thtu 5-361~

5-14 C. Anderson

_ Emergency Kits coordinate w/ J. Sims 6-7

_Sim Obs Rn 5-89 C.,R._Dunavav 5-9

,,___m...

D. Nelson

37;g Si 5-18 M. Whitaker

~

5-38 J. Tench e

A. Parnuthka 5-1g, 6-6 Cf J. R. Mvnum 5-22 B. Simennn 6-10 F. Hicks

~

6-9 CONTROLLED DOCUMENT

1,,,

e e.

DISTRIBUTION LIST FOR l-15-66 EPIP f,02 PCN '1 Rev. 4 0

DIP #03 Rev. 10 DIP #04 Rev. 9 EPIP #05 Rev. 9 EPIP #06 Rev. 9 4

EPIP #11 Rev. 5

, g,.

DIP f12 Rev. 5 EPIP #13 Rev. 5 EPIP #14APCN 02 Rev. 6 EPIP #15 PCN 01 Rev. 3 EPIP #19 Rev. 4 EPIP #20 Rev. 4 EPIP #21 Rev. 4 EPIP #2I. PCN 01 Rev. 3 EPIP #25 Rev. 4 EPIP #31 Rev. 4 RE-ISSUE OF EPIP COVER SHEEIS EPIP #17 Rev. 2 3

EPIP #28 Rev. 2 EPIP #29 Rev. 2 EPIP #30 Rev. 0 O

(_

en neg

+

o UNITED STATES

[

~,h NUCLdAR REGULATORY COMMISSION L

y WASWNGTON, D. C. 20555 5+,..... #o February 27, 1986 50-528/529/530 Palo Verde MEMORANDUM FOR:

Chief, Document Management Branch, TIDC FROM:

Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.

/f w Y

  • A)

Donnie H. Grimsley, Director DivisionofRulesandRecords[f 7

Office of Administration

Attachment:

As stated 9

REGULATORY ENFORMATION DISTRIBUTION SYSTEM (REDS)

ACCESSION NBR'n'**c^^'91 DOC. DATE: 86/02/13 NOTARIZED: NO DOCKET #

FACIL: STN-50-528 Palo Verde Nuclear Station, Uni't 1.

Arizona Publi 05000528 i

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3.

Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VAN BRU,NT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.

Region 5, Office of Director

SUBJECT:

Forwards Central Files version of revised emergency plan implementing procedures, including Rev 4 to EPIP-02 re emergency classification. Enc 1 withheld (ref 10CFR2.790 & 9.5).

COPIES RECEIVED: LTR __/

/

4L,,%2 DISTRIBUTION CODE: XOO5D ENCL J SIZE:

TITLE: Emerg Plan (CF Avail)

NOTES: Stand ard i z e d plent.

05000528 Standardized plant.

05000529 Standardized plant.

05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL,g, PWR-B PD7 PD 1

O LICITRA,E 01 1

1 W ENTERNAL: b 02 1

1 E/DEPER/EPB 03 2

2M IE/DEPER/IRB 1

1 RR/DSRO DIR 1

1 148 J REG FILES 07 1

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8

ENCL 7

_