ML20154D114
| ML20154D114 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 05/11/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20154D117 | List: |
| References | |
| NUDOCS 8805190051 | |
| Download: ML20154D114 (2) | |
See also: IR 05000482/1988013
Text
-
.
.
.
.
l
.
,
l 1
's
.
a
.
!N
In Reply Refer To:
,
Docket: STN 50-482/88-13'
-
Wolf Creek Nuclear Operating Corporation
,
ATTN: Bart D. Withers
'
President and Chief Executive Officer
P.O. Box 411
I
Burlington, Kansas _ 66339
<
Gentlemen:
This refers to the special safety' inspection conducted by an NRC Emergency.
Operating Procedure (EOP)
Inspection Team on March 14 through April 6,1988,
of activities authori.ed by NRC Operating License No. NPF-42 for the Wolf Creek
Generating Station, anst to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
,
The purpose of the inspection was to verify that your E0Ps are technically
accurate; that their specified actions can be meaningfully accomplished using
existing equipment, controls, and instrumentation; and that the available
procedures have the usability necessary to provide the operator with an
~,
effective operating tool.
-
,
The enclosed copy of our inspection report identifies areas examined during the
inspection. Within these areas, the inspection consisted of a selective
!
l
examination of procedures and representative records, observations, and
i
interviews with personnel.
!
During this inspection, certain of your activities appeared to be in violation
i
of NRC requirements, as specified in the enclosed Notice of Violation.
A
r
r
written response is required.
l
[
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter will be placed in the
NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
-
subject to the clearance procedures of the Office of Management and Budget as
i
required by the Paperwork Reduction Act of 1980, PL 96-511.
l
!
l%RIII h
R yII
NRRb
C:0RP/A
'
W
dx
D:0yR c/r"/
RLove
GWright
WRegan
DDChamberlain L) Callan
Sh0 /88
5 / 10 / 8 8 f/lb /88 f//0/88
9 /jo/88
/E o/
!
8805190051 880511
ADOCK 05000482
1 (
Q
3
.
.
i
-
. i
Wolf Creek Nuclear Operating
-2-
Corporation
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Drlgls1Elfc3Ef
47(L
L. J. Callan, Director
Division'of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
,
50-482/88-13
'
3.
Appendix C - Listing of Procedures
cc w/ enclosures:
Otto L. Maynard, Manager of Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
Gary Boyer, Plant Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
Mr. Robert D. Elliott, Chief Engineer
Kansas Corporation Commission
Fourth Floor, Docking State Office Bldg.
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib. by RIV:
"PS/A
Myron Karman, ELD, MNBB (1)
i
- RRI
R. D. Martin, RA
- Section Chief, (PS/A)
- RSPB-DRSS
J. M. Hinds, RIII
- RIV File
Callaway RRI, RIII
'
- ProjectEngineer,DRP/A
ORS
- MIS System
- A. B. Beach
- RSTS Operator
- L.
Shea, RM/ALF
- TSS
{
- R. Love, RIII
- G. Wright, RIII
W. Regan, NRR
,
- w/76 b.'l'I b k
i
j