ML20154C526
| ML20154C526 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/09/1988 |
| From: | Boger B Office of Nuclear Reactor Regulation |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| GL-87-09, GL-87-9, TAC-67867, NUDOCS 8805180211 | |
| Download: ML20154C526 (3) | |
Text
_ _ - - - - _ _ _ _ _ _ _ _ _ _
[
o UNITED STATES
~g NUCLEAR REGULATORY COMMISSION n
i
{
,E WAf.HINGTON, D. C. 20555
\\,...../
MAY 0 9 iggs Cocket No. 50-423 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company i
Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Hroczka:
SUBJECT:
RESCISSION OF TEMPORARY WAIVER OF COMPLIANCE FROM TECHNICAL SPECIFICATION 3.6.3, "CONTAlhMENT ISOLATION VALVES" (TAC NO. 67867)
Re:
Millstone Nuclear Power Station, Unit No. 3 By letter dated April 14, 1988 you requested a temporary waiver of compliance to allow the restart of Millstone Unit No. 3 while an energency Technical Specification (TS) amendnent is being processed by the NRC. The amendment to TS Section 3.6.3, "Containment Isolation Valves", to Facility Operating License No. NPF-49 would remove unnecessary restrictions on rede changes and 1
would be consistent with guidance provided by the staff in Generic Letter
)
87-09, dated June 1987.
The waiver was requested because of the following sequence of events:
4 On March 1,1988, three containrent isolation valves were found to be inoperable during surveillance testing and the action statements required in TS 3.6.3, "Containment Isolation Valves", were satisfied 1
which allow the plant to continue operation for an unlimited period of time. The three valves are the pressurizer relief tank gas sample line isolation valve 3SSR*CV8026, pressurizer vapor space sample line isolation valve 3SSR*CTV20, and pressurizer liquid sample line isolation valve 3SSR*CTV22.
On April 13, 1988, Millstone Unit No. 3 tripped placing the plant in the hot shutdown condition and *he cause of the plant trip, low condenser vacuum due to intake structure travelling screen blocka.7e, was being corrected. TS Section 3.0.4 does not permit entry into sn operational mode unless the conditions for the limiting condition fot operation are ret without reliance on provisions contained in the action statements.
This requirerent will not allow the restart of Millstone Unit No. 3 with the three isolation valves being inoperable, while continued operation is allowed because the action statements in TS Section 3.6.3 were ret.
Our letter dated April 15, 1988 granted a temporary waiver of compliance from the cited TS requirements and was to be in effect until we complete the processing of an emergency license ame.:oment.
8805100211 080509 DR ADOCK 050 3
1 Pr. E. J. Mroczka Hillstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 CC:
Gerald Garfield, Esquire R. M. Kacich, Manager i
Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Corpany City Place Post Office Box 270 Hartford, Connecticut 06103-?499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Vanager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Coepany Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141 ')270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator l
Radiation Control Unit Region I Departrient of Environrental Protection U. S. Nuclear Regulatory Comission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Panagement Hall of Records 80 Washington Street 200 Boston Post Road i
Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident Inspector
{
Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Comission Post Office Box 128 Post Office Box S11 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Unit Superintendent M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Vunicipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 268 Thomas Road i
Waterford, Connecticut 06385 Groton, Connecticut 06340 Ms. Jane Spector Michael L. Jones, Manager Federal Energy Regulatory Comission Pro,iect Management Departrent 825 N. Capitol Street, N.E.
Massachusetts Municipal Wholesale J
Roorn 8608C Electric Company i
Washington, D.C.
204?6 Post Office Box 426 Ludlow, Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher, Esq.
271 South Union Street Burlington, Vermont 05402 l
(b "l0 e
Mr. Edward J. Mroczka
-?-
By "B12733, Application for Amend to License DPR-65,revising Tech Specs to Allow Reduction of Concentration of Boric Acid in Boric Acid Storage Tanks & Piping to Level Where Heat Tracing No Longer Required to Prevent [[Atomic Element" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Precipitation.Fee Paid|letter dated April 29, 1988]], you infortned the staff that the plant had t'een taken to Cold Shutdown to correct unidentified leakage problems and that during the period the reactor was shutdown the three containtrent isolation valves identified above were repaired and declared operable.
The condition of these valves no longer inhibits the plant's ascension to the operation node, therefore, the tecporary waiver is no longer required and the emergency i
circumstances no longer exist.
This letter rescinds the temporary waiver of compliance with the cited TS requirements. We will process your proposed TS anendment to Section 3.6.3 4
using cur normal procedures.
i Sincerely, original signed by i
i i
Bruce A. Boger, Assistant Director l
j for Region I Reactors Divisicn of Reactor Projects I/II 2
Office of Nuclear Reactor Regulation J
cc:
See n'xt page i
DISTRIBUTION "Docket-H le.
RFerguson NRC & Local PDRs MBoyle SVarga OGC-WF i'
BBoger EJordan JStolt JPartlow SNorris ACRS(10)
WKar,e(RI)
Gray File SBarger(M3)
LA:
-4 PM:PDI-4 h
-4 Re i. I
- 0. C
'R:hRR l
SNo (g,Ferguson:,d 05/$/88
- 0. / /88 0/ /8 05/ /88 t
JSt WV e
>o er j
05//{ /88 05/q/88 J
t i
1 j
-l
'