ML20154C312

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-14 on 880725-0805 & Notices of Violation & Deviation
ML20154C312
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/02/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20154C315 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-83-28, NUDOCS 8809140318
Download: ML20154C312 (2)


See also: IR 05000267/1988014

Text

e 9

v

SEP - 21988

In Reply Refer To:

Docket: 50-267/8G-14

Public Service Company of Colorado  ;

ATTN: Robert 0. Williams, Jr.  !

Vice President. Nuclear Operations i

2420 W. 26th Avenue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the special announced inspection conducted by Region IV

personnel during the period July 25 through August 5.1988, of activities

authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear  ;

Generating Station, and to the discussion of our findings with members of l

your staff at the conclusion of the inspection.  ;

Areas examined during the inspection included status of Regulatory Guide 1.97

implementation, status of Generic Letter 83-28 implementation, followup of

previous inspection findings, followup of licensee event reports, and Part 21

, report. followup. Within these areas, the inspection consisted of selective  ;

i

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are ,

documented in the enclosed inspection report.

l

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to I

this violation, in writing, in accordance with the provisions of Section 2.201  :

of the NRC's "Roles of Practice," Part 2, Title 10, Code of Federal l

) Regulations. Your response should be based on the specifics contained in the  !

'

Notice of Violation enclosed with this letter.

4

) Also during tnis inspection, it was found that certain of your activities ,

appeared to deviate from comitments made to the NRC. This item and references  ;

to the comitments are identified in the enclosed Notice of Deviation. You are  ;

i requested to respond to this deviation in writing. Your response should be l

based on the specifics contained in the Notice of Deviation enclosed with this l

'

,

letter. l

t

RIV:TA * RI* RI:0PS* RI:0PS* D S* D: R

RElreland JB8oardman MEMurphy GAPick JLMilhoan LJE an

/ /88 / /88 / /88 / /88 1 / W 88 q /g /88
  • previously concurred

'

a

l

,

G8091403tg 99999}67

hDR ADOCK 0500c gi ,

4

i PDC c

o e

Public Service Company of Colorado 2

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

Original SigncJ Uy'

A. B. Beadi

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

3. Appendix C - NRC Inspection Report

50-267/88-14 w/ attachments

cc w/ enclosures:

Fort St. Vrain Nuclear Station

Manager Nuclear Production Division

16805 WCR 19)

Platteville, Colorado 80651

Fort St. Vrain Nuclear Station

P. Tomlinson, Manager, Quality

Assurance Division

(sameaddress)

colorado Radiation Control Program Director

Colorado Public Utilities Comission

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI R. D. Martin, PA
  • SectionChief(DRP/B) * Project Engineer, DRP/B
  • RPB-DRSS Lisa Shea, RM/ALF
  • MIS System *RSTS Operator
  • K. Heitner, NRR Project Manager *RIV File
  • DRS *DRP

G. F. Sanborn, E0 *R. Ireland

  • M. Murphy *G. Pick
  • J. Boardman *T. Stetka
  • W. Seidle *J. Gagliardo
  • !. Barnes
  • w/766