Text
e
9
v
SEP - 21988
In Reply Refer To:
Docket:
50-267/8G-14
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
!
Vice President. Nuclear Operations
i
2420 W. 26th Avenue, Suite 15c
Denver, Colorado 80211
Gentlemen:
This refers to the special announced inspection conducted by Region IV
personnel during the period July 25 through August 5.1988, of activities
authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear
Generating Station, and to the discussion of our findings with members of
l
your staff at the conclusion of the inspection.
Areas examined during the inspection included status of Regulatory Guide 1.97
implementation, status of Generic Letter 83-28 implementation, followup of
previous inspection findings, followup of licensee event reports, and Part 21
report. followup. Within these areas, the inspection consisted of selective
,
examination of procedures and representative records, interviews with
i
personnel, and observations by the NRC inspectors.
The inspection findings are
,
documented in the enclosed inspection report.
l
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
I
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Roles of Practice," Part 2, Title 10, Code of Federal
l
- )
Regulations.
Your response should be based on the specifics contained in the
!
Notice of Violation enclosed with this letter.
'
4
)
Also during tnis inspection, it was found that certain of your activities
,
appeared to deviate from comitments made to the NRC.
This item and references
to the comitments are identified in the enclosed Notice of Deviation. You are
i
requested to respond to this deviation in writing.
Your response should be
l
based on the specifics contained in the Notice of Deviation enclosed with this
l
'
letter.
l
,
t
RIV:TA *
RI*
RI:0PS*
RI:0PS*
D
S*
D: R
RElreland
JB8oardman
MEMurphy GAPick
JLMilhoan
LJE an
/ /88
/ /88
/ /88
/ /88
1 / W 88
q /g /88
- previously concurred
'
a
l
G8091403tg 99999}67
hDR
ADOCK 0500c
gi
,
i
4
c
,
-
-
.
- -
o
e
Public Service Company of Colorado
2
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
Original SigncJ Uy'
A. B. Beadi
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Inspection Report
50-267/88-14 w/ attachments
cc w/ enclosures:
Fort St. Vrain Nuclear Station
Manager Nuclear Production Division
16805 WCR 19)
Platteville, Colorado 80651
Fort St. Vrain Nuclear Station
P. Tomlinson, Manager, Quality
Assurance Division
(sameaddress)
colorado Radiation Control Program Director
Colorado Public Utilities Comission
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, PA
- SectionChief(DRP/B)
- Project Engineer, DRP/B
- RPB-DRSS
Lisa Shea, RM/ALF
- MIS System
- RSTS Operator
- K. Heitner, NRR Project Manager
- RIV File
- DRS
- DRP
G. F. Sanborn, E0
- R. Ireland
- M. Murphy
- G. Pick
- J.
Boardman
- T. Stetka
- W. Seidle
- J. Gagliardo
- !.
Barnes
- w/766