ML20154C198

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/88-22 & 50-366/88-22 on 880625-0722.Certain Activities Appear to Violate NRC Requirements But Violations Not Being Cited
ML20154C198
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/30/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20154C203 List:
References
NUDOCS 8809140272
Download: ML20154C198 (2)


See also: IR 05000321/1988022

Text

I ~

he . .

t-

g@,

August 30, 1988 /

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Geprgia Power Company

(MTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N05. 50-321/88-22 AND 50-366/88-22

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted

by J. E. Menning on June 25 through July 22, 1988. The inspection included

a review of activities authorized for your Hatch Nuclear Plant. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. However, because all of the criteria for categorization of

licensee-identified violations were met, the violations are not being cited.

The details pertaining to the licensee-identified violations are described in

the enclosed Inspection Report.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Virgil L. Brwnlec

00091joggp Q$o$0P 1 Virgil L. Brownlee, Chief

PDR Reactor Projects Branch 3

0 Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

, , //

$(d / .

. .

h

.reoI

_ _ _ _ ,

'

<

.u .

-

Georgia Power Company 2 August 30, 1988

cc / encl:

(9yP. Mcdonald,ExecutiveVicePresident,

.

, Juclear Operations

W. T. Beckham, Vice President, Plant Hatch

O V C. Nix, General Manager

lor'M. Fraser, Site Quality Assurance

Manager

V Gucwa, Managar, Nuclear Safety

id Licensing

. c,w/ encl:

A Resident Inspector

DRS, Technical Assistant

L Mgh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

Ril Rll

WT

LTrocine:ser

ON

MSinkule

08/Jo/88 08/);/88