Amends 44 & 37 to Licenses NPF-35 & NPF-52,respectively, Modifying Tech Specs to Increase Interval for Surveillance of Ice Condenser Lower Inlet Doors
ML20154C036
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/09/1988
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20154C038 List:
References
NUDOCS 8805180019
Download: ML20154C036 (9)


Text

'

t

[

d' UNITED STATES J\\

NUCLEAR REGULATORY COMMISSION g

i WASHING TON. D. C. 205%

3

- e

%...* /

1 DUKE POWER COMPANY NORTH CAROLINA ELECTRIC HEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE, INC.

i l

DOCKET NO. 50-413 CATAWBA NUCLEAR STATION, UNIT 1 l

l ANENCFENT TO FACILITY OPERATING LICENSE j

Amendment No. 44 License No. NPF-35 4

i 1

1 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Electric Membership CorporationandSaludaRiverElectricCooperative,Inc.,(licensees) dated March 15, 1985, as supplemented August 7 and November 8. 1985, Harch 7, April 14, and September 18, 1986, March 16 and August 11, 1987, and April 7, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; I

l C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the heelth and safety of the public, and (ii) that such activities will be conducted in compliarce with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendrent will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have i

been satisfied.

1 8805100019 080509 ADOCK050g3 j

DR

l 2-i 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachrents to this license amendrnent, and Paragraph 2.C.(2) of Facility Operating License No. NPF-35 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Anendment No. 44

, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license a:rendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COPJIISSION i

Original signed by:

David B. Matthews, Director Project Directorate II-3 i

Division of Reactor Projects-I/II

Attachment:

Technical Specification Changes Date of Is:,uance:

May 9, 1988 i

a I

0FFICIAL RECORD COPY PDII 3 PDII-3/DRP/1/!!

OGC

< N PDI O3/DRP/I/II MRobg/DRP/I/II KJabbour:

f (-ll.wll V

l

<///S/ S i 4 / t/ 7 'gw f />// O' og3tthNs u

t c

(/4f /

l i

,(paKlov UNITED STATES

,og y'

g NUCLEAR REGULATORY COMMISSION 5

j WASHINGTON, D C. 20555

'%....a f DUKE POWER COMPANY NORTH' CAPOLINA MUNICIPAL POWER AGENCY NO.1 PIEDMONT MUNICIPAL POWER AGENCY 00CKET N0. 50-414 CATAWBANUCLE& STATION UNIT 2 2

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 37 License No. NPR-52 1.

The Nuclear Regulatory Comissiun (the Comission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Municipal Power Agency No.1, and Piedmont Municipal Power Agency. (licensees) doted March 15, 1985, as supplemented August 7 and November 8, 1985, March 7, April 14, and September 18, 1986, March 16 and August 11, 1987, and April 7, 1980, complies with the standards and requirements of the Atomic Energy Act of 19G4, as amended (the Act), and the Comission's rules and regulctions as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comissior,'s regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendrent will not be inimical to the common defense and security or to the health and safety cf the public; and E.

The issuance of this amendment is it: accordance with 10 CFR Part 51 of the Comission's regulations and all applicsble requirements have been satisfied.

0-l

.e 4

.6

~2-

,^,l' 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachments to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby amended to read as follows:

G (2) Technical Specifications

]

The Technical Specifications contained in Appendix A, as revised through Amendment No. 37, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COPJIISSION Original signed by:

/

David B. llatthews, Director Project Directorate 11-3 Division of Reactor Projects-I/II

Attachment:

Technical Specification Changes Date of Issuance:

May 9, 1988 i

OFFICIAL RECORD COPY MRo6%/DRP/I/II PDII- /DRP/I/II OGQdM PC ~:/DRP/1/II PQII-3 X abbour:pw

~ f fl LuW DM t)/h2/T9'

/@/0$

Y/2//ffgf$k$$'

ATTACHMENT TO LICENSE AMENOMENT.NO. 44 FACILITY 0PERATING LICENSE NO. NPF-35 DOCKET N0. 50-413 AB9 T0_ LICENSE AMENDfiENT NO. 37 FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment nurber and contain vertical lines indicating the areas of change.

The corresponding over-leaf pages are also provided to maintain document completeness.

Amended Pace Overleaf Page 3/4 6-44 3/4 6-43 3/4 6-45 3/4 6/46

)

CONTAINMENT SYSTEMS ICE BED TEMPERATURE MONITORING SYSTEM LIMITING CONDITION FOR OPERATION I

3.6.5.2 The Ice 8ed Temperature Monitoring System shall be OPERABLE with at least two OPERABLE RTD channels in the ice bed at each of three basic elevations

(< 11', 30'9" and 55' above the floor of the ice condenser) for each one-third of the ice condenser.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With the Ice Bed Temperature Monitoring System inoperable,' POWER a.

OPERATION may continue for up to 30 days provided:

1.

The ice compartment lower inlet doors, intermediate deck doors, and top deck doors are closed; 2.

The last recorded mean ice bed temperature was less than or equal to 20 F and steady or decreasing ; and 3.

The ice condenser cooling system is OPERABLE with at least:

a)

Twenty one OPERABLE air handling units, b)

Two OPERABLE glycol circulating pumps, and c)

Three OPERABLE refrigerant units.

Otherwise, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With the Ice Bed Temperature Monitoring System inoperable and with the Ice Condensar Cooling Syste.m not satisfying the minimum compo-nents OPERABILITY requirements of ACTION a.3 above, POWER OPERATION l

may continue for up to 6 days provided the ice compartment lower inlet doors, intermediate deck doors, and top deck doors are closed and the last recorded mean ice bed temperature was less than or equal to 15 F and steady; otherwise, be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.5.2 15e Ice Bed Temperature Monitoring System shall be determined OPERABLE by performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

CATAWBA - UNITS 1 & 2 3/4 6-43

CONTAINMENT SYSTEMS ICE CONDENSER 000RS LIMITING CONDITION FOR OPERATION 3.6.5.3 The ice condenser inlet doors, intermediate deck doors, and top deck doors shall be closed and OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

With one or more ice condenser doors cpen or otherwise inoperable (but a.

capable of opening automatically), POWER OPERATION may continue for up to 14 days provided the ice bed temperature is monitored at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and the maximum ice bed temperature is maintained less than or equal to 27 F; otherwise, restore the doors to their closed positions or OPERABLE status (as applicable) within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one or more ice condenser door inoperable (not capable of opening automatically), restore all doors to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in H0T SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.5.3.1 Inlet Doors - Ice condenser inlet doors shall be:

a.

Continuously monitored and determined closed by the Inlet Door Position Monitoring System, and b.

Demonstrated OPERABLE during shutdown at least once per 18 months l

by:

1)

Verifying that the torque required to initially open each door is less than or equal to 675 inch pounds; 2)

Verifying that each door is capable of opening automatically in that it is not impaired by ice, frost, debris, or other obstruction; 3)

Testing each one of the doors and verifying that the torque l

required to open each door is less than 135 inch pounds when the door is 40 degrees open.

This torque 's defined as the "door opening torque" and is equal to the naminal door torque plus a frictional torque component; CATAWBA - UNITS 1 & 2 3/4 6-44 Amenduent No. 44 (Unit 1)

Amendment No. 37 (Unit 2)

i CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) l 4)

Testing each one of the doors and verifying that the torque l

required to keep each door from closing is greater than 78 inch pounds when the door is 40 degrees open.

This torque is defined as the "door closing torque" and is equal to the nominal door torque minus a frictional torque component; 5)

Calculation of the frictional torque of each door tested in accordance with Specification 4.6.5.3.lb.3) and 4), above, The calculated frictional torque shall be less than or equal to 40 inch pounds.

i 4.6.5.3.2 Intermediate Deck Ocors - Each ice condenser intermediate deck door i

shall be-a.

Verified closed and free of frost accumulation by a visual inspection at least once per 7 days, and b.

Demonstrated OPERABLE at least once per 3 months during the first year after the ice bed is initially fully-loaded and at least once per 18 months thereafter by visually verifying no structural deterioration, by verifying free movement of the vent assemblies, and by ascertaining free movement when lifted with the applicable force shown below:

Door Lifting Force 1)

Adjacent to Crane Wall 1 37.4 lbs, 2)

Paired w/ Door Adjacent to Crane 5 33.8 lbs, Wall 3)

Adjacent to Containment Wall 5 31.8 lbs, and 4)

Paired w/ Door Adjacent to

-< 31.0 lbs.

Containment Well 4.6.5.3.3 Top Deck Doors - Each ice condenser top deck door shall be deter-mined closed and OPERABLE at least once per 92 days by visually verifying a.

That the doors are in place, and b.

That no condensation, frost, or ice has formed on the doors or blankets which would restrict their lif ting and opening if required.

CATAWBA - UNITS 1 & 2 3/4 6-45 Amendment No. 44 (Unit 1) i Amendment No. 37 (Unit 2)

CONTAINMEN,T SYSTEMS INLET 000R POSITION MONITORING SYSTEM LIMITING CONDITION FOR OPERATION 3.6.5.4 The Inlet Door Position Monitoring System shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION-With the Inlet Door Position Monitoring System inoperable, POWER OPERATION muy continue for up to 14 days, provided the Ice Bed Temperature Monitoring System is OPERA 8LE and the maximum ice bed temperature is less than or equal to 27 F when monitored at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, restore the Inlet Door Position Monitoring System to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUT 00WN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.5.4 The Inlet Door Position Monitoring System shall be determined OPERA 8LE by:

Performing a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a.

b.

Performing a TRIP ACTUATING DEVICE OPERATIONAL TEST at least once per 18 months, and c.

Verifying that the Monitoring System correctly indicates the status of each inlet door as the door is opened and reclosed during its testing per Specification 4.6.5.3.1.

CATAWBA - UNITS 1 & 2 3/4 6-46

.