ML20154B735
| ML20154B735 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/02/1998 |
| From: | Clifford J NRC (Affiliation Not Assigned) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| TAC-M96345, TAC-M96346, NUDOCS 9810050289 | |
| Download: ML20154B735 (2) | |
Text
.
o' October 2, 1998 Mr. Harold B. Ray Executive Vice President Southern Califomia Edison Company San Onofre Nuclear Generating Station P.O. Box 128
. San Clemente, California 92674-0128
SUBJECT:
ACKNOWLEDGMENT OF LETTER ADDRESSING REACTOR WATER LEVEL PROBE INOPERABILITY (TAC NOS. M96345 AND M96346)
Dear Mr. Ray:
1, a letter dated August 13,1996, Southern California Edison (SCE) informed the NRC staff of a 1
,- med course of action and compensatory measures being used to address operating without tno reactor water level probe (RWLP) during its replacement. Your letter noted that this course of action was being implemented under the provisions of 10 CFR 50.59.
The purpose of this letter is to acknowledge receipt of your letter and to acknowledge that you have determined that the proposed course of action and associated compensatory measures do not constitute an unroviewed safety question (USQ). Since no USQ is involved, under the provisions of 10 CFR 50.59 you may make the proposed changes in your facility without prior Commission approval. As such, the NRC staff will not conduct any prior review of your proposed course of action or compensatory measures, and provides no conclusion regarding the acceptability of either your 10 CFR 50.59 safety analysis, or of the safety analysis supporting the safety basis for your actions.
The staff may, however, review your 10 CFR 50.39 safety analysis in the course of the NRC inspection program.
This completes tne staff action on TAC Nos. M96345 and M96346. Please call me at 301-415-1352 if you have any questions.
Sincerely, Original Signed By James W. Clifford, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-361 DiSIBIPUTION.
and 50-362 Docket EPeyton j
PUBLIC OGC i
Db j Q cc: See next page PDIV-2 Reading ACRS EAdensam PGwynn, RIV WBateman DKirsch, RIV WCFO JClifford Document Name: SO96345.LTR OFC PDIV-2, PDIV-2 PDIV-2., n NAME JCbd EN WBathM DATE 10 / l / 98 10/1 /98 10/'l 1 98 OFFICIAL RECORD COPY kk f8f 9810050289 981002
)
PDR ADOCK 0S000361 P
+
ll Mr. Harold B. Ray October 2, 1998 cc:
Mr. R. W. Krieger, Vice President Resident inspector / San Onofre NPS Southem California Edison Company c/o U.S. Nuclear Regulatory Commission San Onofre Nuclear Generating Station Post Ofisce Box 4329 P. O. Box 128 San Clemente, Califomia 92674 San Clemente, Califomia 92674-0128 Mayor Chairman, Board of Supervisors City of San Clemente County of San Diego 100 Avenida Presidio 1600 Pacific Highway, Room 335 San Clemente, Califomia 92672 San Diego, Califomia 92101 Mr. Dwight E. Nunn, Vice President Alan R. Watts, Esq.
Southem Califomia Edison Company Woodruff, Spradlin & Smart San Onofre Nuclear Generating Station 701 S. Parker St. No. 7000 P.O. Box 128 Orange, California 92668-4702 San Clemente, Califomia 92674-0128 Mr. Sherwin Harris Resource Project Manager Public Utilities Department City of Riverside 3900 Main Street Riverside, Califomia 92522 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion S11 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Michael Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, Califomia 92112-4150 Mr. Steve Hsu Radiologic Health Branch State Department of Hea!th Services Post Office Box 942732 Sacramento! Califomia 94234
--