l February 25, 1986 Duke Fower Company ATTN: Mr. G. W. Grier Corporate QA Manager 422 South Church Street Charlotte.NC 28242 l
Gentlemen:
SUBJECT:
DUKE TOPICAL QUALITY ASSURANCE PROGRAM This refers to your letter to this office dated December 6, 1985, which trans-mitted Artendment 10 of the Duke Power Company Topical Quality Assurance (QA) progras description (Duke-1) which proposed a change to your position on Regulatory Guide I.33.
In our correspordence da+ed January 15, 1986, we stated that we were evalu-ating Amendment 10. We have completed this evaluation. Mr. R. Justice and Mr. J. Davis were notified of the evaluation results in a telephone conversation conducted on January 31, 1986, with Mr. G. Belisle of my staff.
Specifically, your request described an alternate approach to the two-year review of operating procedures (Regulatory Guide 1.33 - 1976, Section 5.2.15).
In sumary, our evaluation concluded that:
The definition of a review is clearly stated in ANSI N18.7-1976, Administra-l l
tive Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants, Section 2.2, Glossary of Terms. While the review of j
procedures every three years in lieu of two years is unacceptable, it would be acceptable to incorporate the review procesi described in ANSI /ANS 3.2 1982 i
Section 5.2.15 as an alternate to the process described in the 1976 edition.
In conclusion, we find the three-year review cycle unacceptable and recommend consideration be given to adupting the above alternate approach if you still believe the measures described in the 1976 edition too restrictive.
l Cincerely, original Signed by hoger D. Walker l
Roger D. Walker, Director l
Division of Reactor Projects cc:
R. L. Dick, Vice President Construction l
H. B. Tucker, Vice President Nuclear Production Department R. B. Priory, Vice President tiosign Engineering bcci (Seepage 2) 0603040326G602Q r
DR T OPBis EUW'DR I g i
u.N
i io
?
Duke Power Company 2
February 25, 1986 bec: J. Gilray, IE"HQ J. Milhoan, IE:HQ G. Belisle, RII M. Runyan, RII P. Skinner, Senior Resident inspector, Catawba W. Orders, Senior Resident Inspector, McGuire J. Bryant, Senior Resident Inspector, Oconee Document Control Desk State of South Carolina State of North Carolina RII.f R!g!
C[bson RI Ril W
VL0r(ownlee y
ct GABelisle:aw CA ul an A
02/ tv/86 02/t4/86 02/> t//86 02/p/06 Amend. 10 Denial
.