ML20154B405

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to ISI Rept for McGuire Nuclear Station Unit 1 Twelfth Refueling Outage. Relief Requests Associated with Insp Rept Which Have Been Submitted or Under Development Listed in Section 5.2
ML20154B405
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/25/1998
From: Barron H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154B409 List:
References
NUDOCS 9810050206
Download: ML20154B405 (2)


Text

. ~

1 4

jg Duks En:rgy Ctrpor; tion

{D g McGuire Nuclear Station 12700 Hagers Ferry Road Humersville, NC 28078-9340

11. B. Barron (700 875-4800 oma g,.s y, (704) 875-4809 Mx September 25, 1998

)

U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Subject:

McGuire Nuclear Station, Unit 1 Docket 50-369 Inservice Inspection Report Twelfth Refueling Outage Please f.ind attached the Inservice Inspection Report for McGuire Unit 1,. twelfth refueling outage. This report is submitted per the requirements of 10CFR50.55a and by incorporation Article IWA-6000 of the Section XI ASME Code, 1989 Edition.

Relief requests associated with this Inspection Report which have been submitted or which are under development are listed in Section 5.2.

l Any questions should be directed to Julius Bryant, McGuire Licensing and Compliance at (704) 875-4162.

/h H.

B.

Barron, Vice President McGuire Nuclear Station Attachment A 0'1 ')

i 9810050206 990925

[

PDR ADOCK 05000369 G

PM t

- U.

S. Nuclear Regulatory Commission Document Control Desk Page-2 cc:

Mr.

F.

Rinaldi, Project Manager Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission One White Flint North, Mail Stop 9H3 Washington, D.C.

20555 Mr. Luis.A. Reyes, Regional Administrator Region II U.

S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St.,

SW, Suite 23T85 Atlanta, G1 30303 Mr. Scott Shaeffer NRC Senior Resident Inspector McGuire Nuclear Station w.