Text
, - _ - _ _ _ - _
May 11, 1988 a
Docket No. 50-423 DISTRIBUTION mWeVeCF3W~
OGC-WF NRC 8 Local PORs EJordan Mr. Edward J. Nroczka SVarga JPartlow Senior Vice President BBoger ACRS(10)
Nuclear Engineering and Operations SNorris MChatterton Northeast Nuclear Energy Company RFerguson Gray File Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Hr. Hroczka:
SUBJECT:
MILLSTONE NUCLEAR POWER STATION, UNIT N0. 3 PHYSICS HETH000 LOGY FOR PWR RELOAD DESIGN (TAC NO. 66693)
By letter dated November 13, 1987, Northeast Utilities Service Company (NUSCO) has submitted Addendum 2 to NUSCO-152 entitled "Physics Methodology for PWR Reload Design." The purpose of this addendum is to demonstrate NUSCO's ability to perform PWR reload design using the Westinghouse physics methodology for the Hillstone Nuclear Power Station Unit No. 3.
We have reviewed this report which is the-benchmarking of the model to the zero power physics test data and operational data for Cycle 1 of Millstone Unit No. 3.
We find the methodology as presented in NUSCO-152 to be acceptable for use by NUSCO to perform physics analysis for the Millstone Nuclear Power Station Unit No. 3.
Our Safety Evaluation report is enclosed.
Sincerely, original signed by Robert L. Ferguson, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page 8805170141 880511 PDR ADOCK 05000423 P
PDR I
i LA:P01-4 PM:Pi
/
0.i-4 SNh9 s RFe. s n:bd Stolz 05/Cf/88 05////88 05/g/88
]
To Mr. E. J. Mroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 cc:
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilitics Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region i Departr:ent of Environmental Protec'. ion U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond, Resident inspector Millstone Nuclear Power Station Millstone Nuclear Pcwer Station Northeast Nuclear Energy Company c/o V. S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Unit Superintendent M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 268 Themas Road Waterford, Connecticut 06385 Groton, Connecticut 06340 Ms. Jane Spector Michael L. Jones, Manager Federal Energy Regulatory Coinmission Project Management Department 825 N. Capitol Street, N.E.
Massachusetts Municipai Wholesale Room 8608C Electric Company Washington 0.C.
20426 Post Office Box 426 Ludlow, Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher, Esq.
271 South Union Street Burlington, Vermont 05402