Corrected Monthly Operating Rept for Nov 1985.Related Correspondence
ML20154B177
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/30/1985
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20154B112 List:
References
OL, NUDOCS 8603040242
Download: ML20154B177 (2)


Text

"

1 OPERATINS DATA REPORT i-d DOCKET NO. 50 - 352 DATE DECEMBER 13, 1985 COMPLETED BT PHILACELPHIA ELECTRIC COMPANT i:

N.M.ALDEN ENGINEER-IN-CHARGE e:Ii LICENSING SCCTION MJCLEAR SENERATION DIVISION TELEPHONE (215) 841-5022

  • OPERATIIe STATUS

.~.

  • 1..tAlIT NAME8 LIMERICst LMIT 1 1 NOTESI THE IMIT CONTINUES IN START l

1 1

2. REPORTING PEllIODI NOVEfeER 1965 l

UP TESTING ADW INCURRED TMD I

l l

3. LICENSED THERNAL PONEWittlTit 3293 l

SCHEDULED LOAD TEDUCTIONSe l

ll I

l

4. NAMEPLATE RATINS (GROSS 98dElt 1992 l

ONE FORCED OUTASE, A65 ONE l

ll l

l

5. DESIGN ELECTRICAL RATING (HET PG4Elt 1955 l

MA)AAAL SCRAM FOR TESTING.

I l

i

!,,i l

I

4. MAXIPRRt DEPEleA8LE CAPACITT (8ROSS fedEll l

s I

I

7. MAXIISM DEPEWABLE CAPACITT INET 194 Ell

~

6. IF CHANGES OCCut IN CAPACITT IIATINGS (ITEt13 NUPSER 3 THROUGH 7) SINCE LAST REPORT SIVE REASCHSt

.. ~

s, 9.jrONER LEVEL 70 lelICH RESTRICTED IF. ANT (HET tt4Els

10. EEASONS FOR RESTRICTIONSe IF ANT 8 e-e 4-THIS fWNTH TII-TO-DATE
  • LRtJLATIVE e

l

11. HOURS IN REPORTING PERIOD 720 5131;

. 5!At

12. HUteER OF HOURS REACTOR MAS CRITICAL 553.4 3.783.4 3,621.1 5
13. REACTOR RESERVE SHUTD0608 HOURS 0.0 0.0 0.0
14. HOURS'SENERATOR ON-LINE 454.7 le944.3 1e907.T j_

~.

15. LMIT RESERVE SHUTD0 led HoutS 0.0 0.0 0.0 j
16. OROSS THEllMAL ENERST SENERATED (feel) 994e680 E,959e727 2e959e727

)

17. GROSS ELECTRICAL ENERST SENERATED (1901) 302,622 743,837 743,037

-. ~.

18. NET ELEt;TRICAL EDERST SEMERATED lttell 283,214 649.822 449,822

'19. LMIT SERVICE FACTOIt 63'.E 24.3 22.3 8603040242 860106 PDR ADOCK 05000352 R

PDR w..

A

I

>,e e.
29. WIT AVAILABILITT FACTOR 63.2 24.3 22.3
21. WIT CAPACITY FACTOR (USING 19C NET)
22. WIT CAPACITY FACTOR (USING DER NET) t
13. UNIT FORCED OUTAGE RATE 6.0 0.0 0.0
14. SHUTD0684S SCHEDULED OVER NEXT & MONTHS (TYPE. DATE, AMI DL5tATION OF EACH)I j

UNIT S1 IN STARTUP TESTING.

d t

h

25. IF &ndTD0684 AT Ele OF REPORT PERIGoe ESTIMATED DATE OF STARTUP3 1

1

26. LMITS IN TEST STATUS (PRIOR TO C0ftfERCIAL DPERATIONII FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/64 INITIAL ELECTRICITY MID APRIL 85 4/13/85 l<

Cort 1ERCIAL OPERATION IST GTR 86 v

t D

) teT APPLICA8LE PRIOR TO Cort 1ERCIAL OPERATIDH t

9 U

h b

d i

a I

e

. ~ ~.....

4..

... -,... - - ~ - -,. -.. -... _..