'I OPERATINE D4TA REPORT DOCKET HD. 50 - 352
_ ~
DATE HOVEtSER 15e 1965
\\
'r COMPLETED BT PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN.
ENGINEER-IN-CHARGE LICENSING SECTION 50JCLEAR SENERATION DIVISION TELEPHCHE (2153 841-5022 l
l OPERATING STATUS 1
- 1. UNIT HAME LIMERICK LA4IT 1 I HDTES: THE UNIT INCURRED CHE l
1 I
- 1. REPOR. TING PERICOsOCTOBENs 1965 l
SCHEDULED SHUTD0044 FOR I
l l
~
- 3. LICENSED TH(RMAL POWERtit47):
Y293 l
TESTING, ONE AUTO-SCRAMe I
l l
- 4. NAMEPtATY RATINS 80ROSS MWE):
1992 l
AM3 CHE FORCED LOAD REDUCTION I l
l l
S. DESIGN ELECTRICAL RATING tHET PG4 Ell 1955 l
l l
l
- 6. MAXItekt DEPEICABLE CAPACITT (GROSS 194Elt l
l l
l e
- 7. MAXINUrt DEPEICABLE CAPACITT (HET ISdEls l
l
- 8. IF CHANGES OCCUR IN CAPACITT RATINGS (ITEMS MREER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONSt
- 9. POWER LEVEL 70 leIICH RESTRICTEDs IF ANT INET PSilitt l
- 10. REASONS FOR RESTRICTIONS. IF ANTI I
THIS MONTH TR-TO-DATE CUP 0JLATIVE
- 11. HOURS IN REPORTING PERIOD 745 4833' 4833
- 12. NureER OF HOURS REACTOR MAS CRITICAL 603.6 3:230.0 3,E67.7 4
- 13. CEACTOR RESERVE SHUTDonel HOLRS 0.0 0.0 0.0
- j
- 14. HOURS SENERATOR ON-LINE 567.2 1,494.6 1.4 % 6 I
- 15. tRIIT RESERV2 SHLHD0lO4 HOURS 0.0 0.0 0.0
=
- 16. GROSS. THERMAL ENEK3T SENERATED (Peeti 941.875 1.965,047 1.965,047
- 17. GROSS ELECTRICAL ENERGT SEHERATED (1944) 261.906 441,215 441.215
- 18. AT ELECTWICAL ENERST SEMERATED (Ptet) 142,341 366,606 366,608
~.... _.
- 19. 18dIT SERVICE FACTOR 76.1 20.5 18.6 s
.~
N._m 8603040238 860106 PDR ADOCK 05000352 R
6" I
- 20. ISIIT AVAILAB2LITT FACTOR 76.1 20.5 18.6
- 21. WIT CAPACITY FACTOR (USIMB 19C NET)
O O
e tt. WIT CAPACITT FACTOR (UBINE DER NET)
- 23. WIT FORCED OUTAGE RATE 0.0 0.0 0.0
- 24. SHUTD0lets SCHEDULED OVER DEXT 6 NONTHS (TTPts DATE Ale DLAIATION OF E.1 Chit L*f!T 81 IN STARTUP TESTING.
- 25. IF SNUTDolet AT EIS OF REPORT PERIOD. ESTINATED DATE OF STARTUPt
- 26. WITS IN TEST STATUS (PRIOR TO C0fftERCIAL OPERATION 18 FORECAST ACHIEVED INITIAL CRITICALITT 12/19/84 12/22/84 INITIAL ELECTRICITT MID APRIL 85 4/13/85 CtR9tERCIAL OPERATIM 1ST STR 86 h
a NOT APPLICABLE PRIOR TO COP 9tEECIAL OPERATION o