ML20154B161

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Oct 1985.Related Correspondence
ML20154B161
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/31/1985
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20154B112 List:
References
OL, NUDOCS 8603040238
Download: ML20154B161 (2)


Text

.-

'I OPERATINE D4TA REPORT DOCKET HD. 50 - 352

_ ~

DATE HOVEtSER 15e 1965

\\

'r COMPLETED BT PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN.

ENGINEER-IN-CHARGE LICENSING SECTION 50JCLEAR SENERATION DIVISION TELEPHCHE (2153 841-5022 l

l OPERATING STATUS 1

1. UNIT HAME LIMERICK LA4IT 1 I HDTES: THE UNIT INCURRED CHE l

1 I

1. REPOR. TING PERICOsOCTOBENs 1965 l

SCHEDULED SHUTD0044 FOR I

l l

~

3. LICENSED TH(RMAL POWERtit47):

Y293 l

TESTING, ONE AUTO-SCRAMe I

l l

4. NAMEPtATY RATINS 80ROSS MWE):

1992 l

AM3 CHE FORCED LOAD REDUCTION I l

l l

S. DESIGN ELECTRICAL RATING tHET PG4 Ell 1955 l

l l

l

6. MAXItekt DEPEICABLE CAPACITT (GROSS 194Elt l

l l

l e

7. MAXINUrt DEPEICABLE CAPACITT (HET ISdEls l

l

8. IF CHANGES OCCUR IN CAPACITT RATINGS (ITEMS MREER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONSt
9. POWER LEVEL 70 leIICH RESTRICTEDs IF ANT INET PSilitt l
10. REASONS FOR RESTRICTIONS. IF ANTI I

THIS MONTH TR-TO-DATE CUP 0JLATIVE

11. HOURS IN REPORTING PERIOD 745 4833' 4833
12. NureER OF HOURS REACTOR MAS CRITICAL 603.6 3:230.0 3,E67.7 4
13. CEACTOR RESERVE SHUTDonel HOLRS 0.0 0.0 0.0
j
14. HOURS SENERATOR ON-LINE 567.2 1,494.6 1.4 % 6 I
15. tRIIT RESERV2 SHLHD0lO4 HOURS 0.0 0.0 0.0

=

16. GROSS. THERMAL ENEK3T SENERATED (Peeti 941.875 1.965,047 1.965,047
17. GROSS ELECTRICAL ENERGT SEHERATED (1944) 261.906 441,215 441.215
18. AT ELECTWICAL ENERST SEMERATED (Ptet) 142,341 366,606 366,608

~.... _.

19. 18dIT SERVICE FACTOR 76.1 20.5 18.6 s

.~

N._m 8603040238 860106 PDR ADOCK 05000352 R

PDR

6" I

20. ISIIT AVAILAB2LITT FACTOR 76.1 20.5 18.6
21. WIT CAPACITY FACTOR (USIMB 19C NET)

O O

e tt. WIT CAPACITT FACTOR (UBINE DER NET)

23. WIT FORCED OUTAGE RATE 0.0 0.0 0.0
24. SHUTD0lets SCHEDULED OVER DEXT 6 NONTHS (TTPts DATE Ale DLAIATION OF E.1 Chit L*f!T 81 IN STARTUP TESTING.
25. IF SNUTDolet AT EIS OF REPORT PERIOD. ESTINATED DATE OF STARTUPt
26. WITS IN TEST STATUS (PRIOR TO C0fftERCIAL OPERATION 18 FORECAST ACHIEVED INITIAL CRITICALITT 12/19/84 12/22/84 INITIAL ELECTRICITT MID APRIL 85 4/13/85 CtR9tERCIAL OPERATIM 1ST STR 86 h

a NOT APPLICABLE PRIOR TO COP 9tEECIAL OPERATION o

8 4*

4 t

g_.~~..

. -,.,. ~., - - -

>