Monthly Operating Rept for Dec 1985.Related Correspondence
ML20154B077
Person / Time
Site: Limerick Constellation icon.png
Issue date: 12/31/1985
From: Alden W, Logue R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CON-#186-933 OL, NUDOCS 8603040220
Download: ML20154B077 (9)


Text

.

3 OPERATINE DATA REPORT e

i DOCKET Ho. 54 35E DATE JANUARY 15, 1986 COMPLETED ST PHILADELf*fIA ELECTRIC CortPANY W

N.M.ALDEN ENGINEER-IN-CHARGE LICENSINii SEC110N HUCLEAR SENERATIOff DIVISIWf TELEPHONE t215) 441.SOEE

- -.. ~..

OPERATING STATUS

1. Lt4IT NAME8 LIMERICK uMIT 1 1 HOTEst THE UNIT CONTINJES IN START I

i E. REPORTIMB PERIODI DECEMBER 1995 l

UP TESTING AfG INCURRED THD l

l l

3. LICENSED THERMAL POWERtrefT)8 1E93 1

SCHEDULED LOAD REOUCTIONSe l

t i

4. HAMEPLATE NATINE ESROSS pl8Els Ie9E i

ONE AUTO SCRAM. AIS ONE l

i i

t l

p

5. DESIGH ELECTRICAL RATINS ENET PG4Els /

1e55 l

map 4JAL SCRAM FOR TESTING.

l

[

I I

l,

6. MAXIMUM aEPEnnastE CapacITT isWoSS staEls i

I l

l l

' 7. MAXIstat DEPEleaaLE CAPACITT INET ISdEls 4

1

4. IF CHANSES OCCLNi IN CAPACITY RATIMBS (ITEMS DA#eER 3 THROUOM 78 SINCE LAST REPORTe SIVE REASON 98 4
9. PONER LEVEL 70 lot!CH RESTRICTEDs IF ANY INET todE!*

4

14. REASONS FOR RESTRICTIcegf,IF ANY8 t

t 5

THIS MONTH TR-To-DATE CLRRALATIVE

11. N0uRS IN REPORTIns PERIOD 744 6,29t 6.297x l

1E. tameER OF HOWIS REACTOR WAS CRITICAL 678.e 4.462.E 4.499.9

13. REACTOR RP. SERVE SHUTDolet MtMtS 9.8 e.e 8.e
14. Il0uRS SEMERATOR ON-LINE 405.3 2.554.6 E,554.4 4

1s. uifIT RESERVE SNurones nouRS e.e e.e e.e j

t

16. SWOSS THENIAL ENEREY GENERATED Osell 1.6e9,79 4,569.617 4 569.517 1

j 17, OROSS ELECTRICAL ENEPSY SENERATEO treet) 5e9.718 tee 53,547 1.253,547

18. NET ELECTRICAL ENEREY SENERATES titell 444.4e4 1.136,634 1,136.630

= _

19. latIT SERVICE FACTOR 81.4 E9 E 26.9 0603040220 851231

_h-@ -

PDR ADUCM 05000352 R

PDR

te, UNIT RVAILABILITT FACTOR 81.4 29.2 26.9

21. UNIT CAPACITY FACTOR (USING M3C NET) e m
22. UNIT CAPACITY FACTOR (USING DER HET) e a

m

23. UNIT FORCEO OUTAGE RATE 0.0 0.0 0.0 th SHUTDobe45 SCHEDULED OVER HEXT 6 NONTHS (TYPE. DATE, AND DURATION OF EACHit UNIT 51 IN STARTUP TESTING.
25. IF SHUTD0bei AT EM OF REPORT PERIOD, ESTIMATED DATE OF STARTUP
26. UNITS IN TEST STATUS (PRIOR TO CotttERCIAL OPERATIOHlt FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITT MID APRIL 65 4/13/45 C0tmERCIAL OPERATICH 1ST QTR 46 O HDT APPLICABLE PRIOR TO C0fftERCIAL OPERATIQN i

I P

4 i

e I

[

m

-A N

w

AVERASE DAILY IA4IT POWER LEVEL DOCKET Hr. 14 - 352 UNIT LIMERICK UNIT 1 DATE JAhUARY 15e 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY H.M.ALDEN EHGINEER-IH-CHARGE LICENSING SECTION HUCLEAR SENERATIDH DIVIS30H TELEPHONE I215) 841-5022 5

MONTH DECEt9ER 1985 DA AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWE. NET 3 IMWE. NET 1 1

643 17 695

~

t 827 18 598 3

852 19 8

4 947 20 0

i 5

864 21 0

6 649 22 232

.t*.*

7 660 23 765 8

319 24 986 l

9 0

25 983 10 62 26 1938 11 635 27 1955 It 692 28 1935 l

13 705 29 943 14 707 30 1925 15 705 31 1034 f

16 701 I

l A s n D

.I p,

LHIT SHUTD06443 Ate POWE2 CEDUCTIDHS DOCKET Ho. 50 - 352 UNIT NAME LIMERICK UNIT 1 DATE JANUARY 15, 1986

}

REPORT MONTH DECENDER, 1905 COMPLETED BT PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IH-CH ARGE LICENS!HG SECTION 8

HUCLEAR GENERATION DIVIS!0H TELEPHONE (215) 841-5022 l

l l

l l

l NETH00 0F l LICENSEE lSTSTEMICOMP0HENTI CAUSE APO CORRECTIVE l

lTTPElDURATIONIREASOHISHUTTING D0lN)

EVENT l CODE l CODE l ACTIDH TO

.1 DATE I (131 (HOURSil (El l REACTOR (3) l REPORT e 1 (4) l (5) l PREVENT RECURRENCE I

I I

I I

I I

I I

l 851205 l S 1 000.0 1 B l 4

l HA l EB l 200000( l REDUCED POWER FROM 95X TO 68X TO IMINTAIN A l

l l

l 1

l l

l l SMALLER AMPERAGE FIELD ON THE MAIN ELECTRICAL l

l l

l l

l l

l l GENERATOR UNTIL ISOPHASE DUCT TEMPERATURE CAH I

l l

l l

l l

l l BE RESOLVED. REDUCEC POWER FROM 12/5 TO 12/24.

1 I

I I

I l

l l

1 l 851208 i F l 049.6 i A l 3

.1 85-95 l HA l NECTUN l WHILE RESETTING A SC00P Tt";E LDCK OH THE 'B' MG l

l l

l l

l l

l l SET. THE SC00P TUBE POSITICHER DID HOT RESPOND l

l l

l l

l 1

l l TO DEMAND SIGNAL. IMMEDIATELT INCREASING RECIRC l

l l

l l

l l

l l PUHF SPECD AT A RAPID RATEe RESULTIHG IH A HIGH,I l

l l

l l

l l

l l FLUX COHOITIDH WITHIH A SHORT TIME. A DEVIATIDH l

l l

l l

l l

l l METER WAS INSTALLED WHICH PROVIDES A TIE i

l l

l l

l l

l l

l BETWEEH A SC0OP TUBE POSITIDHER SIGHAL AND THE I l

l l

l l

l 1

l l MG SET SPEED DEMAND SIGHAL.

l i

1 I

I I

I I

I I

l l 851218 l S l 089.1 l B l 4

l HA l ZZ l 777777 i SCRAM IHITIATFD FROM MAIN STEAM ISOLATIDH l

l l

l l

l l

l l VALVE CLOSURE PER STP 25-3 TO DEMONSTRATE g

l l

l l

(,,.

l l

l l REACTOR'S TRANSIENT BEHAVIOR THAT RESULTS FROM :

I l

l l

l l

1 l

l 1 THE SINULTAHEDUS FULL CLOSURE OF ALL MSIV'S l

l l

l l

l l

l l NEAR 100% POWER.

I I

I I

I I

i 1

l 1

l I

I l

1 I

I l

1 I

I I

I I

I I

I i

i 4

(1)

(2)

(3)

(4)

- FORCED REASON

. igm 00 EXHIBIT G. IHSTRUCTIDHS

- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIH)

I - MANUAL FOR PREPARATI0H OF DATA B. MAIlfTENANCE OR TEST 2

MAIAJAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELIHG 3 - AUTOMATIC SCR AM, EVENT REPORT (LER) i 0 - REGULATORY RESTRICTIDH 4 - OTHER (EXPlJIH)

FILE (HUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATIDH I

F - ADMINISTRATIVE (5) l 6 - OPERATIDHAL ERROR (EXPLAIH)

H - OTHER(EXPl.AIH)

EXHIBIT I - SAME SOURCE mmm a

m

.t UNIT SHUTDOWHS AHO POWE2 REDUCTIONS DOCKET HO. 50 - 352 f

..c UNIT HANE LINERICK LNIT 1 1.

DATE JANUARY 15, 1986 ji REPORT NONTH DECEMBER, 1965 CONPLETED BY PHILADELPHIA ELECTRIC CONPANY W.H.ALDEH ENGINEER-IH-CHARGE LICENSING SECTIDH HUCLEAR GENERATI0H DIVI 5IDH 1,

TELEPHONE (215) 841-5022

{

i lk l

i l

l l NETH00 0F l LICENSEE 15YSTENICONPDHENTl CAUSE AHO CORRECTIVE l

lTTPEl0URATIOHlREA50Hl511UTTDG 00WHj EVENT l CODE l CODE I ACTIDH To i-1.1 DATE I (131 (HOURSil (2) l REACTOR (3) l REPORT 5 l (4) l (5) l PREVENT RECURRENCE

}

...v..................

l l

l l

l l

l l

l 5

> l 851228 l S l 000.0 l 8 l 4

I HA l ZZ l ZZZZZZ l CHANGED POWER FROM 95X TO 70% TO 80X TO 90X fi l

l l

l l

l l

l l PER ST.* 23.6 WHICH DETERNIHES THE SENSITIVITY 5 l

l l

l l

l l

l l OF REACTDR FEED PUMP FLOW TO RFP TURBINE SPEEDe l

l l

l l

l l

l l AHO RFP TURBIHE SPEED TO REACTOR PRESSURE.

I I

I ----- 1 I

I I

I I

l l

l 138.7 I I

.1 l

l l

(1)

(2) t (3)

(4)

- FORCEO REA50H HETH00 EXHIBIT G. INSTRUCTIDHS

- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIH) 1. MANUAL FOR PREPARATI0H OF DATA

}

B. MAINTENANCE 0,0., TEST 2 - NANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDNATIC SCR AM.

EVENT REPORT (LER) 0. REGULATORY RESTRICTIDH 4 - OTHER (EXPLAIH)

FILE (HUREG-0161)

E - CPERATOR TRAINING + LICENSE EXANIHATION F. ADNIHISTRATIVE (5)

G OPERATIONAL ERROR (EXPLAIH)

H - OTHER(EXPLAINI EXHIBIT I. SAME SOURCE i

i f

I a

e

4 Deckat No. 5 0-3 52 Attachment to Monthly Operating Report for December, 19 85

(

1 Limerick Generating Station Unit 1 December 1 through December 31, 1985 I

I I.

Narrative Summary of Operating Experiences The unit began the month at approximately 70% power.

t On December 5, at 95% power, excessive isophase bus duct temperatures were discovered and power was reduced to 68%.

On December 8, the "B" Recirculation Pump speed demand meter was observed.to be of f-scale (reading low).

After locking up the scoop tube for inves tigation, the scoop tube lock was reset, resulting in a rapid speed increase, d

causing an Average Power Range Monitor ( APRM) Hi Flux i

i Scram.

With the generator of f-line, isophase bus duct j

minor modifications were completed including installation f

.. s -

I of temporary cooling f ans.

l, Unit startup began on December 9 and the turbine-generator was synchronized the same day.

On December 12, power was i

increased incrementally to monitor bus duct temperatur es.

At 82% power, the maximum bus duct temperatures were l

observed and power was immediately reduced to and maintained at 70% pending new bus duct installation.

I L

q j

Docket No. 50-352 i

Attachment to Monthly J

Operating Report for i

December, 1985

}

Page 2 Ilj On December 18, power was increased to 914 briefly to

(

j support the full Main Steam Isolation valve (MSIV) closure (Startup Procedure 25-3).

This resulted in an anticipated

{

scram.

Startup recommenced on December 19.

Power was maintained at 10-15% on bypass valves while the new portions of isophase bus duct were installed.

On December 22, the l

turbine-generator was synchronized and power ascension to

~

954 began.

After setting the recirculation pump motor / generator set scoop tube electrical and mechanical

[

stops, reactor power was increased to 1004 (3291 MWt, 1114 MWe) on Deqember 26, 1985.

The unit ended the report period at approximately 98%

power.

I i

II.

Challenges to Relief Valves During this month, there were no challenges to the main steam system safety-relief valves.

E i

~

mTED CORRESPO'*Eh -

s'e s%

q j'n 4

PHILADELPHIA ELECTRIC COMPANY 2 egg -39gyh w

H 2301 MARKET STREET I

5 wc M r,3 :.1 Q P.O. BOX 8C99 6

ti i;

PHILADELPHI A. PA.19101

f. -

12151841-4000 January 15, 1986 Docket No. 50-352 0L Direct 6r Office of Resource Management US Nuclear Regulatory Commission Wachington, DC 20555

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen:

Enclosed is the monthly operating report for Limerick Unit 1 for the month of December, 1985 forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, ShU f-R. H. Logue Superintendent Nuclear Services Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

Dr. T. E. Murley, NRC Mr. David E. Ney, PA Dept. of Envir. Resources M r. P. A. Ros s, NRC (2 copies)

INPO Records Center See Attached Service List x

i l

l cc:

Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

Mr. Frank R. Romano Mr. Robert L. Anthony Ms. Phyllis Zitzer Charles W. Elliott, Esq.

Zori G. Ferkin, Esq.

Mr. Thomas Gerusky Director, Penna. Eme rgency Management Agency Angus Love, Esq.

David Wersan, Esq.

Robert J. Sugarman, Esq.

Kathryn S. Lewis, Esq.

(

Spence W. Perry, Esq.

Jay M. Gutierrez, Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket & Service Section (3 Copies)

E. M. Kelly Ti mo thy R. S. Campbell i

\\

b September, 1985 4