ML20154A638
ML20154A638 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Limerick, 05000000 |
Issue date: | 05/09/1988 |
From: | Russell W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
References | |
NUDOCS 8805160074 | |
Download: ML20154A638 (3) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20062G4531990-11-20020 November 1990
[Table view]Forwards SE Supporting Util Actions to Address Indication in Reactor Vessel Recirculation Riser nozzle-to-safe End Weld ML20062G4021990-11-19019 November 1990 Forwards Safety Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted ML20062F1771990-11-13013 November 1990 Confirms Dates of 901126-30 for NRC Equipment Qualification Insp of Facility ML20062F2241990-11-0909 November 1990 Forwards SSFI Repts 50-277/90-80 & 50-278/90-80 on 900917- 1003 Conducted by Corrective Action Review Team.Corrective Actions Generally Acceptable W/Some Weaknesses Noted IR 05000277/19900191990-11-0707 November 1990 Forwards Exam Repts 50-277/90-19OL & 50-278/90-19OL Administered During Wk of 900924 ML20062D5381990-11-0606 November 1990 Forwards List of Unimplemented Generic Safety Issues at Facilities,Per Generic Ltr 90-04 ML20058F1981990-11-0505 November 1990 Advises That 901002 Response to Generic Ltr (GL) 90-03, Relaxation of Staff Position in GL 83-28,Item 2.2 Part 2, 'Vendor Interface for Safety-Related Components,' Acceptable ML20058G1541990-10-31031 October 1990 Requests That Util Furnish Ref Matl Listed in Encl 1, Ref Matl Requirements, for Administration of Licensing Exams & Evaluation of Requalification Program Scheduled for Wk of 910304 ML20058E6121990-10-29029 October 1990 Forwards Radiological Safety Insp Repts 50-352/90-24 & 50-353/90-23 on 901001-05.No Violations Noted ML20062C7451990-10-26026 October 1990 Forwards Safety Evaluation Accepting Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow ML20058D2371990-10-26026 October 1990 Informs of Impending fitness-for-duty Program Insp & Requests 10CFR26.20 Required Policies & Procedures ML20058C1331990-10-23023 October 1990 Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 910121 & Requalification Program Evaluation Scheduled for Wks of 910114 & 21.Ref Matl Listed on Encl Should Be Provided by 901029 ML20058A6241990-10-18018 October 1990 Forwards Insp Repts 50-352/90-22 &50-353/90-21 on 900912-19. No Violations Noted ML20062B7891990-10-12012 October 1990 Forwards Safety Insp Repts 50-352/90-20 & 50-353/90-19 on 900813-0916.No Violations Noted ML20062B8211990-10-11011 October 1990 Forwards Final SALP Repts 50-277/89-99 & 50-278/89-99 for Jul 1989 to May 1990.Improvements Noted ML20062A0651990-10-0505 October 1990 Forwards Safety Insp Repts 50-277/90-17 & 50-278/90-17 on 900814-0924.One Violation Noted ML20059N5841990-10-0303 October 1990 Informs That Issuance of Senior Reactor Operator Licenses, for Fuel Handling Only,For More than One Facility Conditionally Acceptable IR 05000352/19900801990-09-28028 September 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Requests Status of Planned Revs to Procedures & Expected Completion Dates in 910130 Response ML20059M6561990-09-22022 September 1990 Ack Receipt of Util Re Corrective Actions Taken in Response to Insp Repts 50-277/90-13 & 50-278/90-13 ML20059J1971990-09-13013 September 1990 Ack Receipt of & Payment for Civil Penalty Proposed by NRC in in Amount of $75,000 ML20059H0701990-09-11011 September 1990 Requests Addl Info Re Audit Rept Distribution,Per 890711 & 900420 Application Request for Removal of Organization Charts from Tech Spec Per Guidance Provided in Generic Ltr 88-06 & Miscellaneous Administrative Changes ML20059K7211990-09-0606 September 1990 Forwards Safety Insp Repts 50-277/90-15 & 50-278/90-15 on 900723-27 & Notice of Violation ML20059F6561990-08-29029 August 1990 Forwards Notice of Withdrawal of 900516 Application for Amend to License NPF-39,revising Tech Specs to Allow one- Time Extension of Visual Insp Period for Three Small Inaccessible Snubbers in Drywell ML20056B2691990-08-23023 August 1990 Forwards Request for Addl Info Re 880126 Application for Amends to Licenses,Revising Tech Specs to Provide More Restrictive Limits on Emergency Svc Water Sys.Response Should Be Provided within 60 Days of Ltr Receipt ML20059A6581990-08-16016 August 1990 Requests Discussion of Measures Considered &/Or Taken to Reduce Amount of Time Needed to Obtain Effluent Sample Analyses Results,Per 870121 Application for License Amends to Licenses DPR-44 & DPR-56 ML20058N0531990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Licensees Establishment of Engineering Managers Forum ML20058M5981990-08-0303 August 1990 Forwards Safety Insp Repts 50-352/90-17 & 50-353/90-16 on 900522-0701 & Notice of Violation.Inspectors Continued to Note Problems W/Procedure Compliance & in Technical Adequacy & Implementation of Procedures ML20058M3311990-08-0303 August 1990 Forwards Radiological Safety Insp Repts 50-352/90-19 & 50-353/90-18 on 900709-13.No Violations Noted.Weakness Observed in Maint of Station Health Physics Procedures ML20056A5011990-07-30030 July 1990 Forwards Safety Insp Repts 50-277/90-13 & 50-278/90-13 on 900516-0702 & Notice of Violation ML20055E8641990-07-10010 July 1990 Comments on Util 891228 Response to Generic Ltr (GL) 89-10, Safety-Related Motor-Operated Valve (MOV) Testing & Surveillance. Requests Proposed Schedule for Completion of GL Program Along W/Justification for Alternative Schedule ML20055E1711990-07-0606 July 1990 Requests That Licensee Provide Data on Channel Box Bow Vs Exposure Associated W/Methods Used to Account for Effects of Channel Box Bow During Second Bundle Lifetime Channel Boxes, Per 900425 Response to Bulletin 90-002,within 30 Days ML20055E9611990-07-0505 July 1990 Requests Addl Info Re Util 891228 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance ML20055F5591990-07-0303 July 1990 Forwards Safety Insp Repts 50-352/90-80 & 50-353/90-80 on 900521-25.Plant Transient Response Implementing Plan (Trip) Technically Acceptable.Unresolved Items Noted.Impact of Insp Findings on Peach Bottom Trip Procedures Should Be Reviewed ML20055D0721990-06-27027 June 1990 Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wks of 900924 & 1001.Ref Matls,Listed on Encl,Should Be Provided by 900724 ML20055C8761990-06-15015 June 1990 Forwards Safety Insp Repts 50-277/90-10 & 50-278/90-10 on 900403-0515.No Violations Noted.Increased Mgt Attention Warranted to Ensure That Instances of Failure to Complete Surveillance Testing Identified & Corrected ML20059M8671990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20058K1961990-05-31031 May 1990 Forwards Results & Conclusions of Regulatory Effectiveness Review on 900507-11.Encl Withheld (Ref 10CFR73.21) ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20055C3091990-02-14014 February 1990 Forwards Safety Insp Repts 50-352/90-03 & 50-353/90-03 on 900116-19.No Violations Noted ML20248H8041989-10-0505 October 1989 Grants Termination of Requirements Set Forth in Section VA of Order to Permit Operation of Both Units at Full Power ML20248H1361989-10-0303 October 1989 Forwards Unexecuted Amend 22 to Indemnity Agreement B-28, Reflecting Changes to 10CFR140 Re Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248G2291989-09-29029 September 1989 Forwards Safety Insp Repts 50-277/89-21 & 50-278/89-21 on 890901.No Violations Noted.Insp Concluded That Improvements in Radiological Controls Program Have Been Slow.Addl Mgt Attention to Program Warranted ML20248E7421989-09-27027 September 1989 Forwards Exam Repts 50-352/89-13OL & 50-353/89-22OL Administered on 890612-16 & 19.NRC Concerned About Effectiveness of Util Candidate Screening & Evaluation Process That Permitted Marginal Individual for NRC Exam ML20248E2351989-09-27027 September 1989 Forwards Summary of Issues Re Verification of Quality of Certain Types of Activities Performed for Mods at Facility. Mods Cover Automatic Depressurization Sys/Msiv Instrument Nitrogen Accumulator & Svc Water Pipe Replacement ML20248G6601989-09-27027 September 1989 Forwards Operational Readiness Insp Rept 50-353/89-81 on 890730-0804 & Notice of Violation ML20248A4111989-09-25025 September 1989 Forwards Restart Team Safety Insp Repts 50-277/89-20 & 50-278/89-20 on 890730-0902.No Violations Noted ML20248E5181989-09-22022 September 1989 Forwards Safety Insp Repts 50-352/89-15 & 50-353/89-24 on 890626-0730.No Violations Noted.Repts Delineate NRC Concerns Identified During mid-cycle SALP Review & Licensee self-assessment of Conduct of Operations ML20248E5581989-09-21021 September 1989 Forwards SER Supporting Use of Frosstey Fuel Performance Code Described in Topical Rept PECo-FMS-003, Steady-State Fuel Performance Methods Rept. Addl Applications of Subj Code Require NRC Review & Approval ML20248G9611989-09-21021 September 1989 Forwards Amend 7 to Indemnity Agreement B-101,reflecting Increase in Primary Layer of Liability Insurance.Amends Conform to Changes Made to Price-Anderson Act Enacted on 880820 ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu 1990-09-06 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209F2461999-07-15015 July 1999 Request Addl Info Re Relief Request CRR-01 Through CRR-11 for Plant,Units 2 & 3.RAI Undtd ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K2251999-06-11011 June 1999 Forwards Insp Repts 50-277/99-04 & 50-278/99-04 on 990405- 0517.One Severity Level IV Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G2051999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20207B8381999-05-24024 May 1999 Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified ML20207A0541999-05-17017 May 1999 Acks 990512 & 14 Telcons with Licensee Re Util Request That Rev 8 of NUREG-1021, OL Exam Stds for Power Reactors Be Followed Rather than Interim Rev 8 for Exams in Sept 1999. Request Acceptable ML20206Q5871999-05-14014 May 1999 Advises That Info Contained in ,Which Submitted Revised Procedures for Plant EP Response Procedures Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R3031999-05-11011 May 1999 Informs That on 990407,NRC Administered GFE Section of Written Operator Licensing Exam to Employees of Facility. Forwards Copies of Both Forms of Exam,Including Answer Keys & Grading Results of Facility ML20206N1111999-05-0707 May 1999 Forwards Insp Repts 50-352/99-02 & 50-353/99-02 on 990302-0412.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206H2651999-05-0606 May 1999 Informs That on 990112 Licensee Submitted to NRC Core Shroud Insp Plan for Plant,Unit 2,in Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Boiling Water Reactors ML20206K2231999-05-0606 May 1999 Informs That Author Authorized to Exercise Discretion & Not Issue NOV or Civil Penalty Re Violation Util Identified Involving Unit 2 Rod Block Monitoring Sys Being Inoperable for 29 of 185 Control Rods 1999-09-09 |
Contents
Text
~, .
69 MAY E88 Docket Nos. 50-277 50-278 50-352 50-353 Philadelphia Electric Company ATTN: Mr. Corbin A. McNeill Executive Vice President-Nuclear 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
Subject:
Meeting Summary On April 21, 1988 you introduced Mr. Paquette, the new Chief Executive Officer of Philadelphia Electric Company (PECo) to me and becare familiar with the Region I office facilities including our Incident Response Center.
During our meeting Mr. Paquette confirmed the need for the March 1987 Peach Bottom Shutdown Order and confirmed PECo's commitment to cooperate openly with the NRC in resolving the issues which led to the Order. Your approach to assessing plant and management's readiness for the Peach Bottom restart and schedule reflect an understanding by top management of the magnitude of the job. I was encouraged by your commitment to an indepth self assessment fol-lowing completion of the restart tasks and a subsequent assessment of readiness by INPO. I understand that the results of both assessments will be used by PECo management prior to requesting NRC approval for restart.
I described the process for NRC review of the PECo restart plan, submitted in e response to the Order. A management panel including NRC regional and head-quarters representatives will direct the review of the PECo plan. After NRC questions have been addressed, a Safety Evaluation Report (SER) will be issued to indicate the staff's conclusions as to the acceptability of the PECo restart plan. Inputs to the NRC review will include appropriate questions and comments from the state and local officials and the public.
Following PECo's report to NRC on readiness of the facility to restart, the staff will conduct an Integrated Performance Assessment Team inspection to assess the effectiveness of the implementation of the restart plan. The resulting inspection report and the SER will form the basis for my recommen-dation to the commission regarding restart. The ultimate decision to allow restart will be made by the commission.
OFFICIAL RECORD COPY MEETING
SUMMARY
PEC0/4/27/88 -
0001.0.0 05/09/88 8805160074 860509 PDR ADOCK 05000277 DCD
. Ol i g P
O Philadelphia Electric Company 2 09 W 1988 Thank you for coming in with Mr. Paquette to express your personal commitments to safe nuclear operations and to open candid communications with the NRC.
Sincerely, Origir.a1 Sigr.ed By WILLI AM T. I;USSI'LL William T. Russell Regional Administrator Enclosure A List of Attendees cc w/ attachment John S. Kemper, Sr., Senior Vice President-Nuclear J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager, Fuels Department, Delmarva Pcwer & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Af f airs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania bec w/attachmant Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Sec t i ot. Chief, DRP Robert J. Bores, DRSS B. Clayton, EDO E. Wenzi,nger, DRP Qt/ V' RI:dRP R :DR. f I r[P R $,RA l)I:RA)h R
Linville/rhl a-Wenzing r e Af lan Russell 4/))88 4/)%/38 4/M /88 [ S /88 /h /88 0FFICIAL RECORD COPY MEETING
SUMMARY
PECD/4/27/88 -
0002.0.0 D4/27/88
49 MAY 1988 ATTACHMENT Attendees NLC William T. Russell, Regional Administrator James C. Linville, Chief, Reactor Projects Section 2A, ORP Philadelphia Electric Company Joseph Paquette, Chief Executive Officer Corbin McNeill, Executive Vice President-Nuclear I