ML20154A360

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/86-02 on 860113-17 & 21-31. No Violations Noted
ML20154A360
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/25/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20154A363 List:
References
NUDOCS 8603040002
Download: ML20154A360 (2)


See also: IR 05000271/1986002

Text

_- . .. . - .. -- - - ---- .. . ..

,

.

%

.

,

,

FEB 2 51986

Docket No. 50-271

'

Vermont Yankee Nuclear Power Corporation

j ATTN: Mr. Warren P. Murphy

l Vice President and Manager

j of Operations

e RD 5, Box 169

Ferry Road

Bratt.leboro, Vermont 05301
i

] Gentlemen:

j- Subject: Inspection No. 50-271/86-02

i

i This refers to the special safety inspection conducted by Mr. H. W. Kerch of

this office on January 13, through January 17, 1986 in the Region I office and

on January 21-31, 1986, at Vermont Yankee Nuclear Station at Vernon, Vermont,

i of activities authorized by NRC License No. DPR-28 and to the discussions of

our findings held by Mr. Kerch with Mr. P. Pelletier, and other members of

,

your staff at the conclusion of the inspection.

The areas examined during the inspection included welding and nondestructive ,

i examinations of the recirculation piping system. Within these areas the '

, inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by the

{

inspector. In addition, the NRC Nondestructive Examination Van was also used '

, to make certain independent physical measurements.

.

! Within the scope of this inspection, no violations were identified.

i

l No reply to this letter is required. Your cooperation with us in this matter '

! is appreciated.

I Sincerely,

, Origir,a1 Signed B78

( JacqueP.Darr

!

t

Stewart D. Ebneter, Director

Division of Reactor Safety  ;

Enclosure
NRC Region I Insp tion Report Number 50-271/86-02

!

J  !

pg A DR

e

i

j OFFICIAL RECORD COPY IR VY 86-02 - 0001.0.0 '

02/13/86

,- [8 1

.

5

-

Vermont Yankee Nuclear Power 2

Corporation

cc w/ encl:

R. W. Capstick, Licensing Engineer

W. F. Conway, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

Donald Hunter, Vice President

Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

bec w/ encl:

Region I Docket Room (with concurrences)

ManagementAssistant,DRMA(w/oencl)

Section Chief, DRP

M. McBride, RI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

RI:0RSS RI:0RSS RI:0RSS '

Kerch/geb Wiggins Ebneter

2/n986 1% g/4f

0FFICIAL RECORD COPY 1R VY 86-02 - 0001.0.1

02/13/86