Forwards Safety Insp Rept 50-029/88-05 on 880223-0331.No Violations Noted.Receipt of Util Informing NRC of Corrective & Preventive Actions Re Failure to Notify NRC within 1 H of Plant Shutdown Ack
ML20154A292
Person / Time
Site: Yankee Rowe
Issue date: 05/06/1988
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Drawbridge B
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20154A294 List:
References
NUDOCS 8805130199
Download: ML20154A292 (2)


See also: IR 05000029/1988005

Text

n ,

^,

s. s.

-

.

e-

WAY 06 588

-Docket No. 50-29

Yankee Atomic Electric Company

ATTN: Mr. Bruce L. Drawbridge

Vice President and

Manager of Operations

1671 Worcester Road

Framingham, Massachusetts 01701

Gentlemen:

Subject: NRC Region I Inspection Report No. 50-29/88-05

This refers to the routine resident safety inspection conducted- by

Mr. H. Eichenholz and Mrs. C. Carpenter of this office on February 23 -

March 31, 1988 at the Yankee Nuclear Power Station, Rowe, Massachusetts. The

inspection consisted of observations of activities, interviews with personnel,

independent measurements and document reviews. The results of the inspection

are described in the NRC Region I inspection report enclosed with this letter

and were discussed with Mr. N. St. Laurent of your staff at the conclusion of

the inspection.

Also, this refers to your letter dated March 14, 1988, in response to our

letter dated February 12, 1988, concerning the f ailure to notify the NRC, as

required by 10 CFR 50.72(b)(1)(A), within one hour of the initiation of a plant

shutdown required by Technical Specifications. Thank you for informing us of

the corrective and preventive actions documented in your letter. These actions

will be examined during a future inspection of your licensed program.

Within the scope of this inspection, no violations were observed.

Your cooperation with us is appreciated.

Sincerely.

Ori.it nni Si m*t IW t

.1Msc 2. McatLs1

James T. Wiggins, Chief

Reactor Projects Branch No. 3

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-29/88-05

0FFICIAL RECORD COPY IR YR 88-05 - 0001.0.0

8805130199 eso506 04/28/88 gi_

PDR ADOCK 05000029 \

Q DCD '

. .

,

'

-

MAY 061988

c, Yankee Atomic Electric Company 2

cc w/ enc 1:

J. E. Tribble, President

N. N. St. Laurent, Plant Superintendent

G. J. Papanic, Jr., Senior Project Engineer - Licensing

Peter W. Agnes, Assistant Secretary of Public dafety, Commonwealth of

Massachusetts

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o enc 1)

D. Haverkamp, Section Chief, DRP

J. Kaucher, Project Engineer, DRP

H. Eichenholz, SRI - Yankee (w/ concurrences)

G. Grant, SRI - Vermont Yankee

R. Bores, Technical Assistant, DRSS

P. Eapen, Section Chief, DRS (See Section 3.b)

M. Fairtile, PM, NRR

Wh

RI:Dy

Yfs

RI:(EP

J

RI:DR

-

HEichenholz/njd ) A I:DRP

DHaverkup JDurr* ' JWiggins l

I/ [ 88 // 4 88 .5/f/88 h 88

  • See Section 3.b

0FFICIAL RECORD COPY IR YR 88-05 - 0002.0.0 l

04/28/88

l

l

.