ML20154A233

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-277/85-44 & 50-278/85-44 on 860101-31,respectively.No Violation Noted.Weakness Noted in QA Program & Surveillance Testing Program.Response Required within 30 Days
ML20154A233
Person / Time
Site: Peach Bottom  
Issue date: 02/25/1986
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20154A237 List:
References
NUDOCS 8603030346
Download: ML20154A233 (2)


See also: IR 05000277/1985044

Text

P

h

D

FEB 2 5 26

Oxket Nos. 50-277/DPR-44

50-278/DPR-56

Philacelphia Electric Company

AT!N: Mr. 5. L. Caltroff

Vice President

Electric Production

2301 Harket Street

Pn11adelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection 50-277/85-44; EG-278/85-44

The findings of a routine safety inspection conducted by Messrs. J.11. Williams

and T. P. Johnson are being transmitted.

The NRC inspection for Unit 3,

Inspection Report 53-278/85-44, was performcd on December 7, l'J85 - January 31,

1986, and, fcr Unft 2, Inspection Report 53-277/85-44, was performed on

January 1, 19c6 - January 31, 1986, at the Peach Bottom Atomic Power Station,

Delta, Pennsy?vania. These findirgs were based on observation cf Activities,

interviews, measure;nents ind document reviews, and have been discussed with

Mr. R. S. Fleischaann of your staf f.

W1 thin tM scope of this inspection, no violations were noted. However, as

discussed in Detail 11 of the attachad inspection report, an apparent weakness

in the philadelphia Electric Cctrpany Quality Assurance Prograrh was observed.

The Philadelphia Electric Compary specification for obtaining quality control

inspector services does not re;uire the contractor to verify the validity of

education and experience claitred by inspector cardidates. We are concerned

t' at no verification of education and experience is required or conducted

r

relative to contracted quality control services.

In addition, as discussed in Detall 7 2 of the attached inspection report, an

apparent weakness in the Peach Bottom surveillance testing program was identi-

fled.

It appe,ars that neither the Peach Botten Technical Specifications nor

the Site Acalnistrative Procedures audress requirements or guidance regarding

actions to be taken relative to surveillancs tests which are overdue.

Further-

more, as di: cussed in Detail 4.4.1 of the attached inspection report a sur-

veillance test, ST 12.8, may not have been conducted during Unit 2 startup in

July 1985.

It appear:, that this occurrence is similar to the missed surveil-

lance tests identified in Inspection Report 50-277/35-29; 50-278/85-33. We are

concerned that management controls for the Peach Bottom surveillance testing

progra, may not be adequat.e with respect to control of overdue surveillance

tests and, in sone instances, tc the tracking of surveillance test cc.9pletion

status.

Yoa are requested to respond ta these apparent weakres:es, including actions

tden or planned, within 30 days of receipt of this letter.

30303As osopp9

o

ADOCK 05000277

N

rFICIAL RECOAD COPY

CIR PB 85-44 - 0001.0.0

02/24/36

l

!

(

,

EB 2 51986

Philadelphia Electric Company

2

The respunse requested by this letter is not subject to the clearance proce-

dures of the Office of Ma tagement and Budget as required by the Paperwork

Reduction Act of c1980, PL 96-511.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

Your cooperation with us is appreciated.

r

Sincerely,

g Signed By:

Samuel J. Collins, Chief,

Projects Branch 2, Division

of Reactor Projects

Enclosure: NRC Region I Combined Inspection Report No. 50-277/85-44 and

50-278/85-44

cc w/ encl:

R. S. Fleischmann, Manager, Peach Ecttom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

,

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Cfficer (w/o encls)

R. Gallo, Section Chief, DRP

'5.Co\\has,982,029

L

-

R

P

s/geb

do

on

G

o

ns

2/

'86

2/2y/86

2M'//86

2

/86

0FFICIAL RECORD COPY

CIR PB 85-44 - 0001.0.1

02/24/86

..

.

I.

% 2 5 1986

-

,

Philadelphia Electric Company

2

The response requested by this letter is not subject to the clearance proce-

dures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

A copy of this letter and the enclosures are being placed in the NRC Public-

Document Room.

Your cooperation with us is appreciated.

Sincerely,

Signed By:

Samuel J. Collins, Chief,

Projects Branch 2, Division

of Reactor Projects

Enclosure: NRC Region I Combined Inspection Report No. 50-277/85-44 and

50-278/85-44

cc w/ enc 1:

R. S. Fleischmann, Manager, Peach Gottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. R Hirst, Director, Joint Generation Projects Department, Atlantic

L ectric

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant Genere) Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

R. Gallo, Section Chief, DRP

S. Conins, Pt 2 , DSP

s/geb

ns

2/

86

2/2y/86

288//86

2 $ /86

0FFICIAL RECORD COPY

CIR PB 85-44 - 0001.0.1

02/24/86

-

- -

-

-

-

-

-

.

.

. -