Text
P
h
D
FEB 2 5 26
Oxket Nos. 50-277/DPR-44
50-278/DPR-56
Philacelphia Electric Company
AT!N: Mr. 5. L. Caltroff
Vice President
Electric Production
2301 Harket Street
Pn11adelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection 50-277/85-44; EG-278/85-44
The findings of a routine safety inspection conducted by Messrs. J.11. Williams
and T. P. Johnson are being transmitted.
The NRC inspection for Unit 3,
Inspection Report 53-278/85-44, was performcd on December 7, l'J85 - January 31,
1986, and, fcr Unft 2, Inspection Report 53-277/85-44, was performed on
January 1, 19c6 - January 31, 1986, at the Peach Bottom Atomic Power Station,
Delta, Pennsy?vania. These findirgs were based on observation cf Activities,
interviews, measure;nents ind document reviews, and have been discussed with
Mr. R. S. Fleischaann of your staf f.
W1 thin tM scope of this inspection, no violations were noted. However, as
discussed in Detail 11 of the attachad inspection report, an apparent weakness
in the philadelphia Electric Cctrpany Quality Assurance Prograrh was observed.
The Philadelphia Electric Compary specification for obtaining quality control
inspector services does not re;uire the contractor to verify the validity of
education and experience claitred by inspector cardidates. We are concerned
t' at no verification of education and experience is required or conducted
r
relative to contracted quality control services.
In addition, as discussed in Detall 7 2 of the attached inspection report, an
apparent weakness in the Peach Bottom surveillance testing program was identi-
fled.
It appe,ars that neither the Peach Botten Technical Specifications nor
the Site Acalnistrative Procedures audress requirements or guidance regarding
actions to be taken relative to surveillancs tests which are overdue.
Further-
more, as di: cussed in Detail 4.4.1 of the attached inspection report a sur-
veillance test, ST 12.8, may not have been conducted during Unit 2 startup in
July 1985.
It appear:, that this occurrence is similar to the missed surveil-
lance tests identified in Inspection Report 50-277/35-29; 50-278/85-33. We are
concerned that management controls for the Peach Bottom surveillance testing
progra, may not be adequat.e with respect to control of overdue surveillance
tests and, in sone instances, tc the tracking of surveillance test cc.9pletion
status.
Yoa are requested to respond ta these apparent weakres:es, including actions
tden or planned, within 30 days of receipt of this letter.
30303As osopp9
o
ADOCK 05000277
N
rFICIAL RECOAD COPY
CIR PB 85-44 - 0001.0.0
02/24/36
l
!
(
,
EB 2 51986
Philadelphia Electric Company
2
The respunse requested by this letter is not subject to the clearance proce-
dures of the Office of Ma tagement and Budget as required by the Paperwork
Reduction Act of c1980, PL 96-511.
A copy of this letter and the enclosures are being placed in the NRC Public
Document Room.
Your cooperation with us is appreciated.
- r
Sincerely,
g Signed By:
Samuel J. Collins, Chief,
Projects Branch 2, Division
of Reactor Projects
Enclosure: NRC Region I Combined Inspection Report No. 50-277/85-44 and
50-278/85-44
cc w/ encl:
R. S. Fleischmann, Manager, Peach Ecttom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
,
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Cfficer (w/o encls)
R. Gallo, Section Chief, DRP
'5.Co\\has,982,029
L
-
R
P
s/geb
do
on
G
o
ns
2/
'86
2/2y/86
2M'//86
2
/86
0FFICIAL RECORD COPY
CIR PB 85-44 - 0001.0.1
02/24/86
..
.
I.
% 2 5 1986
-
,
Philadelphia Electric Company
2
The response requested by this letter is not subject to the clearance proce-
dures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
A copy of this letter and the enclosures are being placed in the NRC Public-
Document Room.
Your cooperation with us is appreciated.
Sincerely,
Signed By:
Samuel J. Collins, Chief,
Projects Branch 2, Division
of Reactor Projects
Enclosure: NRC Region I Combined Inspection Report No. 50-277/85-44 and
50-278/85-44
cc w/ enc 1:
R. S. Fleischmann, Manager, Peach Gottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
W. R Hirst, Director, Joint Generation Projects Department, Atlantic
L ectric
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant Genere) Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
R. Gallo, Section Chief, DRP
S. Conins, Pt 2 , DSP
s/geb
ns
2/
- 86
2/2y/86
288//86
2 $ /86
0FFICIAL RECORD COPY
CIR PB 85-44 - 0001.0.1
02/24/86
-
- -
-
-
-
-
-
.
.
. -