Text
r
.
.
.
~
FEB 2 5 286
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN: Mr. Warren P. Murphy
Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont
05301
Gentlemen:
Subject:
Inspection Report No. 50-271/86-01
This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond
of this office on January 2 - February 3,1986, at the Vermont Yankee Nuclear Power
Station, Vernon, Vermont.
The inspection consisted of observation of activities,
interviews with personnel and document reviews.
The results of the inspection are
described in the NRC Region I Inspection Report enclosed with this letter and were
discussed with Mr. P. J. Donnelly of your staff at the conclusion of the inspec-
tion.
No violations were identified within the scope of this inspection.
The enclosed inspection report discusses your actions to revise station alarm re-
spor.se procedures that will prescribe the appropriate operator actions in response
to a degraded grid voltage condition.
Based on discussions with the Operations
Superintendent, it is our understanding that you will complete actions to approve
and issue the alarm response procedures prior to startup from the present modifi-
cation outage.
If our understanding of this matter is incorrect, please advise
this office of your intentions within 10 days of your receipt of this letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
letter and the enclc.,ures will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
Sincerely, Orlaical sassed ays
ffL9f/)AL
-
W
.
Edward C. Werainger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report No. 50-271/86-01
i
8603030303 860225
i
ADOCK 05000271
g/
G
s
-l
l
'
.
.
. _ - ,
_ _ _ _ _ _ .-_
. . .
-
_.
-_ _
_ _
. _ .
. . .. _
-
a
.
,
.
4
!
-
Vermont Yankee Nuclear Power
2
FEB 2 51986
j
Corporation
cc w/ enc 1:
,
!
Mr. R. W. Capstick, Licensing Engineer
!
Mr. W. F. Conway, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. Donald Hunter, Vice President
1
}
Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
'
i
Nuclear Safety Information Center (NSIC)
State of New Hampshire
State of Vermont
4
NRC Resident Inspector
i
bec w/ encl:
j
Region I Docket Room (with concurrences)
'
DRP Section Chief
i
4
2
DRP Branch Chief
1
M. McBride, SRI, Pilgrim
i
H. Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
i
>
1
!
!
!
!
1
4
i
.
i
.
!
R{fRP
R:
P
RI:D
g
ymond/meo
ripp
/[Wenziner
l
l
ppfgb
2(&%
2/20/86
{
OFFICIAL RECORD COPY
i
i
!
I
--