ML20153H158

From kanterella
Jump to navigation Jump to search
Advises of Independent Welding Team Insp to Be Performed on 880516-27 & 0606-10 at Facility.Results of Team Insp Will Be Transmitted to Util Through Std NRC Insp Rept.Objective of Insp,Tasks & Inspectors Participating on Team Encl
ML20153H158
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/28/1988
From: Hermann R
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8805120150
Download: ML20153H158 (4)


Text

-<

DISTRIBUTION:

6 Docket 2F11er NRC PDR Local PDR APR 2 81983 TVA TP R/F Projects R/F Docket Nos. 50-259/260/296 SEbneter JAxelrad.

SRichardson BDLiaw RHermann Tennessee Valley Authority KBarr

~A7TN: Mr. S. A. White Algnatonis Manager of Nuclear Power BHayes 6N 38A Lookout Place Lic. Asst.

1001 Market Street GGears Chattanooga, Tennessee 37402-2801 OGC JRutberg

Dear Mr. White:

ACRS (10)

TVA-Rockville

SUBJECT:

THE NRC WELDING TEAM INSPECTION

Reference:

Browns Ferry Nuclear Plant, Units 1, 2 and 3 The NRC will perform an independent welding team inspection during the period of May 16-27 and June 6-10, 1988, at the Browns Ferry Nuclear Power Plant. The objective of this inspection, inspection tasks and inspectors participating on the team are identified in the enclosure.

Members of your staff will be kept informed of our inspection progress and significant findings. An exit meeting with you or members of your staff will be conducted on June 10, 1988, in accordance with our normal procedures. The inspection results of the team inspection will be transmitted to you through the standard NRC inspection report.

If you have any questions regarding this activity, please contact the NRC Project Manager, G. Gears at (301) 492-0767.

Sincerely, 8805120150 s80420 gDR ADOCK 0500 9 R. A. Hermann, Acting Assistant Director for Projects TVA Projects Division Office of Special Projects

Enclosure:

Welding Inspection Plan Outline

cc w/ enclosure
see next page n )

TVAt :TVA: Projects:TVA:AD/P.  :  :

0FC :TVA:TP: :TP:EB/AtBC i .....:....__ . ___.__... . ____ .:......__....:..__g.__..:....___.__.:____.__....

:RHermann  :  :

(

l NAME

GGeorf..__.am::RShewmaky.

..:........ . .:.DL4 DATE:4//[/88 :4/f3/88 :4/d/88 :4/ /88 :4/3//88  :  :

/ OFFICIAL RECORD COPY

{ )

4 4

l Mr. S. A. White Browns Ferry Nuclear Plant Tennessee Valley Authority Units 1, 2, and 3 cc:

General Counsel Regional Administrator, Region II Tennessee Valley Authority U.S. Nuclear Regulatory Commission 400 West Summit Hill. Drive 101 Marietta Street, N.W.

E11 B33 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 .

Resident Inspector / Browns Ferry NP Mr. R. L. Gridley U.S. Nuclear Regulatory Commission Tennessee Valley Authority Route 12, Box 637 SN 1578 Lookout Place Athens, Alabama 35611 Chattanooga, Tennessee 37402-2801 Mr. Richard King Mr. H. P. Pomrehn c/o U.S. GA0 Tennessee Valley Authority 1111 North Shore Drive Browns Ferry Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Decatur, Alabama 35602 Dr. Henry Myers, Science Advisor Mr. M. J. May Connittee on Interior Tennessee Valley Authority and Insular Affairs Browns Ferry Nuclear Plant U.S. House of Representatives P.O. Box 2000 Washington, D.C. 20515 Decatur, Alabe.ma 35602 Mr. D. L. Williams Tennessee Valley Authority 400 West Sunnit Hill Drive W10 885 Knoxville, Tennessee 37902 Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 9

J 1

INSPECTION PLAN ,

BROWNS FERRY NUCLEAR PLANT Inspection Topic: Welding Team Inspection .

'Date: May 16-27 and June 6-10, 1988 .

Inspection Report Nos.: 50-259/88-13, 50-260/88-13 and 50-296/88-13 Inspectors:

G. Georgiev, Team Leader, Structural Welding o M. Schuster, Pipe Welding, Consultant i E. Martindale, Nondestructive Examination, Consultant I W. Marini, Electrical Supports Welding, Consultant J. York, HVAC Supports Welding G. Walton, Pipe Supports Welding D. Smith, Instrument Support Welding l T. McLellan, Engineering Calculations l

Objective The objectives of this inspection are: (1) to perform a welding inspection to review, address and close-out issues identified during the first NRC welding team inspection, (2) verify that TVA has an effective program in place to address and dispose employee concerns and that the concerns are handled and processed in accordance with this prugram, and (3) verify that the ciata, analysis and conclusions in the TVA Welding Project Phase 11 report accurately reflects the present status of the inspected plant hardware.

Inspection Tasks:

1. Structural Welding
a. Review the information contained in the Phase II report for the structural welding areas,
b. Review the TVA evaluation for the identified deficiencies and findings to determine status and adequacy of TVA evaluations,

(

c. Interview coanizant TVA personnel to obtain pertinent information concerning tfie Phase II welding effort.

l

"l T,i,.\'

b.j$

'":/

e t!el

a. din .

wReelview 2

b. ding the are in fRe vie ind w as . form
c. ation ingsthe T 3 Inter to VA ev co No concer view deter alu ntained nde c in
a. stru ning ogniz mine ation f the P ctiv the P nta statu or e ha s a the ha rRevie Exa se TVA se nd i 11 r
b. einspewa min II per s

de sa at io wl onnl e adequntif acy ied epo

c. Deter ctio nmple ns ding e t rt f mine effoof r effooob of defi or the rRevie e w pr ese rt adiogr in rt. tain pe TVAev cie n

s pipe vie the nt this aphs alucie wing r r pe ar t rtin e atio san son e statu s ea .oasce nt n.d adiogr nl a nd infor aphs qu rtain m alific adequ

~

on acy ation adequ thesiatio of a cy r of te.n eco the N rds f DE the ef or fo the rt, per son e nl

) ..

, ~

. 'J

f,

. 2. Pipe Welding

a. Review the information contained in the Phase II report for the pipe welding areas,
b. Review the TVA evaluation for the identified deficiencies and findings to determine status and adequacy of TVA evaluations.
c. Interview cognizant TVA personnel to obtain pertinent information concerning the Phase II welding effort.
3. Nondestructive Examinations
a. Review a sample of radiographs to ascertain adequacy of the reinspection effort in this area.
b. Determine present status and adequacy of the NDE effort.
c. Review the personnel qualification records for the personnel reviewing radiographs on the site.

.