ML20153G992
| ML20153G992 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/14/1986 |
| From: | Scarano R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20153G995 | List: |
| References | |
| NUDOCS 8602280565 | |
| Download: ML20153G992 (2) | |
See also: IR 05000397/1986002
Text
.
_ .
_ .
_. .
_
. . .
- - _ -
h.-
- '
-
r
,
-
.
wT
j
l
L
FEB 141986
.
l-
l
'
(
l
Docket No.'50-397
!
-
.
,
l-
' Washington Public Power Supply System
'
P. O. Box 968
Richland, Washington 99352
Attention:
Mr.~G.'C. Sorensen, Manager
.
Regulatory Programs
,
,
. Gentlemen:
I
,
Subject: NRC Inspection
This refers to the routine inspection conducted by Mr. C. Sherman of this
I
office between January 13-17, 1986 and in office inspection between
January 21'and February 3, 1986, of. activities authorized by NRC License
No. NPF-21, and to the discussion of our findings held by Mr. Sh.erman with
Mr. Martin and other. members of your staff at the conclusion of the
inspection.
l
Areas examined during this inspection are_ described in the enclosed inspection
j
report. Within these areas, the. inspection consisted of selective
examinations of procedures and representative records,-interviews with
personnel, and observation,s by the' inspector.
No violations of NRC requirements were identified within the scope of this
l
inspection.
'
Yoar attention is directed to paragraph'nine of this report. This paragraph
s
describes the result of our^ inquiry into'an allegation we received in July,
1985. We believe that'there is sufficient evidence'to substantiate this
particular allegation.. We request that you re'spond to us within 30 days
-
describing the,results of.any evaluation you have performed or will perform
and the corrective actions'you have taken o6 will~take.
!
,i
~-U
.
Inaccordancewith'10CFR2.790(a),Ia, copy.hfthisletterandtheenclosure
'
j
will be placed in the NRC Publie Document, Ro'om.
,
.
.
4
,
g,
d
4
,
8602280565 g6
397
'
ADOCK
m --
G
t
,
l l
.
.
r;
- - -
.
.
.
'
r
.
[{@; 1 4.l986
Washington Public Power Supply System
-2-
,
.,
.
1Should you have any questions concerning this inspection we will be glad to:
L
discuss them with you.
l
Sincerely,.
S/
'
'Ross
. Scarano, Director
Division of Radiation Safety
'
",_
^land Safeguards
l
,
f
,.
!
~
Enclosure:
.
50-397/86-02- -
Inspectio,n Report No.'
.
,
CC:
C. M. Powers, WNP-2
,
P. L. Powell, WNP-2.,
R. B. Glasscock, WPPSS-
J. D. Martin, WPPSS
G. E. Doupe, Esq., WPPSS
-
W. G. Conn,' Burns & Roe, Inc.
State of WA
N. S. Reynolds, Esq.
bec: RSB/ Document Control Desk (RIDS)
J. Martin
B. Faulkenberry
.
G.' Cook
Resident and Project Inspector
Allegation file; 0. Shackleton
i
RV
(f
$
g
&
CSherma :dh
GYuhas
FWenslawski
AJ
son
R
rano
2/ti /86
2/11 /86
2/ /(4-/86
2/
/86
2/nj/86
-
-