ML20153G992

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/86-02 on 860113-17 & 21 & 0203.No Violation Noted.Allegation Received in Jul 1985 Substantiated.Response Describing Corrective Actions Requested within 30 Days
ML20153G992
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/14/1986
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20153G995 List:
References
NUDOCS 8602280565
Download: ML20153G992 (2)


See also: IR 05000397/1986002

Text

.

_ .

_ .

_. .

_

. . .

- - _ -

h.-

  • '

-

r

,

-

.

wT

j

l

L

FEB 141986

.

l-

l

'

(

l

Docket No.'50-397

!

-

.

,

l-

' Washington Public Power Supply System

'

P. O. Box 968

Richland, Washington 99352

Attention:

Mr.~G.'C. Sorensen, Manager

.

Regulatory Programs

,

,

. Gentlemen:

I

,

Subject: NRC Inspection

This refers to the routine inspection conducted by Mr. C. Sherman of this

I

office between January 13-17, 1986 and in office inspection between

January 21'and February 3, 1986, of. activities authorized by NRC License

No. NPF-21, and to the discussion of our findings held by Mr. Sh.erman with

Mr. Martin and other. members of your staff at the conclusion of the

inspection.

l

Areas examined during this inspection are_ described in the enclosed inspection

j

report. Within these areas, the. inspection consisted of selective

examinations of procedures and representative records,-interviews with

personnel, and observation,s by the' inspector.

No violations of NRC requirements were identified within the scope of this

l

inspection.

'

Yoar attention is directed to paragraph'nine of this report. This paragraph

s

describes the result of our^ inquiry into'an allegation we received in July,

1985. We believe that'there is sufficient evidence'to substantiate this

particular allegation.. We request that you re'spond to us within 30 days

-

describing the,results of.any evaluation you have performed or will perform

and the corrective actions'you have taken o6 will~take.

!

,i

~-U

.

Inaccordancewith'10CFR2.790(a),Ia, copy.hfthisletterandtheenclosure

'

j

will be placed in the NRC Publie Document, Ro'om.

,

.

.

4

,

g,

d

4

,

8602280565 g6

397

'

PDR

ADOCK

PDR

m --

G

t

,

l l

.

.

r;

- - -

.

.

.

'

r

.

[{@; 1 4.l986

Washington Public Power Supply System

-2-

,

.,

.

1Should you have any questions concerning this inspection we will be glad to:

L

discuss them with you.

l

Sincerely,.

S/

'

'Ross

. Scarano, Director

Division of Radiation Safety

'

",_

^land Safeguards

l

,

f

,.

!

~

Enclosure:

.

50-397/86-02- -

Inspectio,n Report No.'

.

,

CC:

C. M. Powers, WNP-2

,

P. L. Powell, WNP-2.,

R. B. Glasscock, WPPSS-

J. D. Martin, WPPSS

G. E. Doupe, Esq., WPPSS

-

W. G. Conn,' Burns & Roe, Inc.

State of WA

N. S. Reynolds, Esq.

bec: RSB/ Document Control Desk (RIDS)

J. Martin

B. Faulkenberry

.

G.' Cook

Resident and Project Inspector

Allegation file; 0. Shackleton

i

RV

(f

$

g

&

CSherma :dh

GYuhas

FWenslawski

AJ

son

R

rano

2/ti /86

2/11 /86

2/ /(4-/86

2/

/86

2/nj/86

-

-