Forwards Insp Repts 50-424/88-32 & 50-425/88-40 on 880718-22.No Violations or Deviations Noted
ML20153G704
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/25/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20153G709 List:
References
NUDOCS 8809080341
Download: ML20153G704 (2)


See also: IR 05000424/1988032

Text

o

..

.

AUB 251988

-

.

i

Docket Nos. 50-424, 50-425

License Nos. NPF-68, CPPR-109

Geurgia Power Company

ATTN:~ Mr. W. G. Hairston, III

Senior Vice President -

l

Nuclear Operations

!

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT.NOS. 50-424/88-32 AND 50-425/88-4.

This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by

M. Miller on July 18-22, 1988.

The inspection included a review of activities

authorized for your Vogtle Units 1 and 2 facility.

At the conclusion of the

!

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined duri.ig the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

,

I

activities in progress.

Within the scope of the inspection, no violations or deviations were

l

identified.

>

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

l

Should you have any questions concerning this letter, please contact us

sincerely,

Si

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc:

(Seepage 2)

8809000341 880825

1

gDR

ADOCK0500g4

y o/

.

.

-

.

.

_.

"

AUS 251988

/

'

-

.

.

Georgia Power Company

2

cc w/ enc 1:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality-

.

Assurance Manager

.

- G. Bockhold, Jr. , General Manager,

Nuclear Operations

"

L. Gucwa, Manager, Nuclear Safety.

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill..Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/ enc 1:

E. Reis OGC

J. Hopkins, NRR

'

M. Sinkule. RI!

DRE, Technical Assistant

NRC Resident Inspector

Document Control Desk

State of Georgia

f

!!

RII

RII s

g#

04)ly\\

v'

miller:ser

TConlon

/~MSinkule

08/15/88

08/g/88

08/a: /88

_