ML20153G704
| ML20153G704 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/25/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20153G709 | List: |
| References | |
| NUDOCS 8809080341 | |
| Download: ML20153G704 (2) | |
See also: IR 05000424/1988032
Text
o
..
.
AUB 251988
-
.
i
Docket Nos. 50-424, 50-425
License Nos. NPF-68, CPPR-109
Geurgia Power Company
ATTN:~ Mr. W. G. Hairston, III
Senior Vice President -
l
Nuclear Operations
!
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT.NOS. 50-424/88-32 AND 50-425/88-4.
This refers to the Nuclear Regulatory Comission (NRC) inspection conducted by
M. Miller on July 18-22, 1988.
The inspection included a review of activities
authorized for your Vogtle Units 1 and 2 facility.
At the conclusion of the
!
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined duri.ig the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
,
I
activities in progress.
Within the scope of the inspection, no violations or deviations were
l
identified.
>
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
l
Should you have any questions concerning this letter, please contact us
sincerely,
Si
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc:
(Seepage 2)
8809000341 880825
1
gDR
ADOCK0500g4
y o/
.
.
-
.
.
_.
"
AUS 251988
/
'
-
.
.
Georgia Power Company
2
cc w/ enc 1:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P. D. Rice, Vice President, Project
Director
C. W. Hayes, Vogtle Quality-
.
Assurance Manager
.
- G. Bockhold, Jr. , General Manager,
Nuclear Operations
"
L. Gucwa, Manager, Nuclear Safety.
and Licensing
J. A. Bailey, Project Licensing
Manager
B. W. Churchill..Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
bec w/ enc 1:
E. Reis OGC
J. Hopkins, NRR
'
M. Sinkule. RI!
DRE, Technical Assistant
NRC Resident Inspector
Document Control Desk
State of Georgia
f
!!
RII
RII s
g#
04)ly\\
v'
miller:ser
TConlon
/~MSinkule
08/15/88
08/g/88
08/a: /88
_