ML20153G569
| ML20153G569 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/31/1988 |
| From: | Morris K OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML19297G887 | List: |
| References | |
| LIC-88-756, NUDOCS 8809080218 | |
| Download: ML20153G569 (1) | |
Text
_
_.w_.___
.. =..
_c_.----
==
- n. -
n n
m Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402:536 4000 August 31, 1988 LIC-88-756 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop PI-137 Washington, D.C.
20555
SUBJECT:
Transmittal of Changes to the Emergency Plan Implementing Procedures
Reference:
Docket No. 50-285 Gentlemen:
Pursuant to 10 CfR 50, Part 50.54(q), four (4) controlled copies of changes to the Fort Calhoun Station Emergency Plan Implencnting Procedures are being pro-vided to the Commission. ^ne (1) copy (for control copy number 165) is provided for your office. A second copy with the privacy information excluded is forward-ed for the Public Document Room. Three (3) copies (for control copy numbers 154, 155 and 156) have been provided ta the Regional Office in Arlington, Texas.
A transmittal sheet is provided for each copy to confirm receipt of the serial-ized document.
It is requested that these sheets be completed and returned with-in five (5) days of receipt.
NOTE:
Procedure EOF-6 contains Privacy Information.
Sincar ly, Division Manager Nuclear Operations KJM/rh g
Enclosures I
Q cc:
Mr. R. D. Martin g/
g Region:1 Administrator i
I[
q;,o U.S. Nuclear Regulatory Commission LI Region IV d '.
4.
w I
ex 611 Ryan P'laza Drive, Suite 1000
[
Ngg i
l M8 Arlington, Texas 76011 80 o
LeBoeuf, Lamb, leiby & MacRae (w/o Enclosures) 4 Scc 1333 New Hampshire Avenue, N.W.
p I) i gh Washington, D.C.
20036
( lg
,ro(
Mr. P. H. Harrell, NRC Senior Resident Inspector (I
u s,:,
m
.~ ~ n..mae m w.
wrr
]