Text
I)
---
-
_
_ _ _
_
O(hCWl
V
MRY 0 51989
.
t
Docket No. 50-395
License No. NPF 12
South Carolina Electric and Gas Company
ATTN;
Mr. D. A. Nauman, Vice President
Nuclear Operations (Mail Code 6ul)
P. O. Box 88
Jenkinsville, SC 29065
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-395/88-06
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. M.
Sartor on March 15-18, 1988.
The inspection included a review of
activities authorized for your V. C. Summer facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
However, there were areas identified as requiring further review
and evaluation.
These items are identified as Inspector Followup Items in
Appendix A to this letter, and are also discussed in the enclosed appraisal
report.
You are requested to submit a written statement within 45 days of the date of
this letter, which details the action you plan to take, and the estimated date
of completion with regard to the findings identified in Appendix A.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
kog5
253 880505
0
OCK 05000395
_ _ _
U 'l .]
/'
.'g
y
--
\\
+
!
c
'
South Carolina Electric and Gas Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Douglas M. Collins, Chief
Radiological Protection Branch
Division of Radiation Safety
and Safeguards
Enclosure:
Inspection Report
cc w/ encl:
0. S. Bradham, Director, Nuclear Plant
Operations
J. L. Skoldt, General Manager,
Station Operations
J. B. Knotts , Jr.
Bishop, Cook, Purcell & Reynolds
W. A. Williams, Jr. , Special
Ae sistant, Nuclear Operations -
Santee Cooper
A. R. Koon , Jr. , Manager
Nuclear Licensing
R. E. Rainear, Executive Vice President,
South Carolina Public Service Authority
bcc w/ encl:
NRC Resident Inspector
DRS Technical Assistant
J. Hopkins, Project Managar, NRR
Document Control Desk
State of South Carolina
B. Travers, EPB/NRR
J. Heard, FEMA RIV
RII
RII
RI
WI' N
Q
jp
p
s y E d 1 0 // * .:
y ups
,
WSartor
Tuecker
H ance
tY Tr**5
4/2!)/88
673 /S3
4/
/gg
y/29/gt?
g 1
-
,
(
~
c
t
APPENDIX A
Appraisal Open Items
.
1.
Review the specifications and documentation on the steam line
monitors to determine if the monitors can be made effective in providing
dose assessment data at lower than PAG limits (IFI 50-395/SS-06-01).
2.
Locate
all
available
documentation
pertaining
to
validation,
verification, and methodology for all dose assessment models (computer
and manual) and centralize the maintenance of it into the Plant Record
System (PRS) (IFI 50-395/33-06-02).
3.
Establish a periodic calculational comparison between dose assessment
models (e.g., EARS, EPP-005, State, NRC) and document the reasons for
significant dif ferences (IFI 50-395/88-06-03).