ML20153G224

From kanterella
Jump to navigation Jump to search

Forwards SE Re Resolution of USI A-46 at Plant.Nrc Concludes That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request
ML20153G224
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/24/1998
From: Olshan L
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20153G227 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, TAC-M69451, TAC-M69452, NUDOCS 9809300006
Download: ML20153G224 (3)


Text

.- . -- - _ . . . - - - . . - . . ..- - - .-..---- . - . - - .

September. 24,-1998 Mr. H. L. Sumntr, Jr.

Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.

~

Post Office Box 1295 Birmingham, Alabama 35?Gi-1295

SUBJECT:

SAFETY EVALUATION ON THE RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 AT EDiMN 1. HATCH NdCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M69451 AND M69452)

Dear Mr. Sumner-Enclosed is the staffs safety evaluation (SE) of your Unresolved Safety issue (USl) A-46 ,

implementation program at Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2.

1

, . Your USI A-46 program at Hatch was established in response to Generic Letter 87-02 through a  ;

F 10 CFR 50.54(f) letter. The staff concludes that your USl A-4S implementation program has, in general, met the purpose and intent of the criteria in the Generic Implementation Procedure, Revision 2 and the staffs Supplemental Safety Evaluation Report No. 2 for the resolution of USI l'

A-46. The staff has determined that your corrective actions and completed physical modifications for resolution of outliers will result in safety enhancements, in certain aspects, that

, are beyond the original licensing basis, and as a result, provide sufficient basis to close the USl i' A-46 review at Hatch. The staff concludes that your implementation program to resolve I

^ USl A-46 at Hatch has adequately addressed the purpose of the 10 CFR 50.54(f) request.  !

Your activities related to the USl A-46 implementation are subject to NRC inspection. l t

j The staff considers its efforts under TAC Nos. M69451 and M69452 to be complete.

1 Sincerely, ORIGINAL SIGNED BYt

i. Leonard N. Olshan, Ps . - Manager

~

Project Directorate ll-2 q

? 9809300006 980924' Division of Reactor Projects -l/Il ADOCK 0500 Office of Nuclear Reactnr Regulation

%DR j- Docket Nos. 50-321 and 504S6

{} )

7 1

Enclosure:

As stated cc w/ encl: See next page ]g h h O\

Distnbution. LOlshan OGC GGalletti Docket File HBerkow ' ACRS >

PUBLIC LBerry _. LPlisco, Ril PD 11-2 Rdg. PPatnaik PSkinner, Ril i JZwolinski THarris (e-mail SE only) _ YSKim To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copf with attachment / enclosure' "N" = No copy OFFICEJM:PDil-2 l LA:PDll-h D:PDJ/A(M :l l l  !

_NAMEVC LOlshan:en LBerry y/D HB6rkbW DATE S /2M98 ()/6/98 I 3/)M/98" / /98 / /98 / /97 DOCUMENT NAME:,G)HATCHWl69451.USI OFFICIAL RECORD COPY .

2 O l '.' [] D l

pa p i UNITED STATES g } NUCLEAR REGULATORY COMMISSION o, WAdHINGToN, D.C. soasHooi e

%,*****,o[ September 24, 1998 Mr. H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project Southem Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

SAFETY EVALUATION ON THE RESOLUTION OF UNRESOLVED SAFETY

^ ISSUE A-46 AT EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M69451 AND M69452)

Dear Mr. Sumner:

Enclosed is the staff's safety evaluation (SE) of your Unresolved Safety issue (USI) A-46 Implementatior' orogram at Edwin 1. Hatch Nuclear Plant (Hatch), Units 1 and 2.

Your USI A-46 program at Hatch was established in response to Generic Letter 87-02 through a 10 CFR 50.54(f) letter. The staff concludes that your USl A-46 implementation program has, in general, met the purpose and intent of the criteria in the Generic implementation Procedure, Revision 2 and the staff's Supplemental Safety Evaluation Report No. 2 for the resolution of USl A-46. The staff has determined that your corrective actions and completed physical modifications for resolution of outliers will result in safety enhancements, in certain aspects, that are beyond the original licensing basis, and as a result, provide sufficient basis to close the USI A-46 review at Hatch. The staff concludes that your implementation program to resolve USI A 46 at Hatch has adequately addressed the purpose of the 10 CFR 50.54(f) request.

Your activities related to the USl A-46 implementation are subject to NRC inspection.

The staff considers its efforts under TAC Nos. M69451 and M69452 to be complete.

Sincerely, Leonard N. Olshan, Project Manager Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

As stated cc w/ancl: See next page

.c

Edwin I. Hatch Nuclear Plant cc:

Mr Emest L Blake, Jr. Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker and Trowbridge 10th Floor 2300 N Street, NW. '

1299 Pennsylvania Avenue Washington, DC 20037 ~ Washington, DC 20004-9500 i

Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southem Nuclear Operating County Courthouse Company, Inc. Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President Resident inspector Southem Nuclear Operating Plant Hatch Company, Inc.

11030 Hatch Parkway N. P. O. Box 1295 Baxley, Georgia 31531 Birmingham, Alabama 35201-1295 Regional Administrator, Region 11 Mr. P. W. Wells U.S. Nuclear Regulatory Commission General Manager, Edwin 1. Hatch Atlanta Federal Center Nuclear Plant

' 61 Forsyth Street, SW, Suite 23TC5 Southem Nuclear Operating Atlania, Georgia 30303 Company, Inc. '

U.S. Highway 1 North Mr. Charles H. Badger P. O. Box 2010 i

Office of Planning and Budget Baxley, Georgia 31515 Room 610 270 Washington Street, SW. Mr. R. D. Barker Atlanta, Georgia 30334 Program Manager Fossil & Nuclear Operations

Harold Reheis, Director Oglethorpe Power Corporation Department of Natural Resources 2100 East Exchange Place 205 Butler Street, SE., Suite 1252 P. O. Box 1349 Atlanta, Georgia 30334 Tucker, Georgia 30085-1349 Steven M. Jackson Mr. Jim Fisicaro Senior Engineer- Power Supply Duke Energy Corporation '

Municipal Electric Authority P. O. Box 1006 (EC070) of Georgia Charlotte, North Carolina 28201-1006 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684 Mr. Noil Smith, Cha!rman -

Seismic Qualification Utility Group c/o MPR Associates, Inc.

320 King Street Alexandria, Virginia 22314

, . - .- . .- -- . -- -.