Amends 201 & 142 to Licenses DPR-57 & NPF-5,respectively, Revising Dwl Air Temp LCO from Less than or Equal to 135 F to Less than or Equal to 150 F
ML20113D259
Person / Time
Site: Hatch  
Issue date: 06/27/1996
From: Berkow H
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20113D260 List:
References
NUDOCS 9607030074
Download: ML20113D259 (8)


Text

i

  1. "%g g*

4 UNITED STATES i

S NUCLEAR REGULATORY COMMISSION Ej E

WASHINGTON, D.C. 20565-0001

%,...../

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-321 EDWIN 1. HATCH NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.201 License No. DPR-57 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility) Facility Operating License No. DPR-57 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated February 21, 1996, as supplemented by letters dated May 1 and June 4, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C,

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9607030074 960627 PDR ADOCK 05000321 P

PDR

- 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-57 is hereby amended to read as follows:

Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 201

, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Enviromental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR TH NUCLEAR RE(ULATORY COMMISSION He bert N. Berkow,' Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance: June 27, 1996

ATTACHMENT TO LICENSE AMENDMENT NO. 201 FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 a

4 i

- Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

1 Remove Paae Insert Pace 3.6-17 3.6-17 i

i 1

i

l I

~

Drywell Air Temperature 3.6.1.5 3.6 CONTAINMENT SYSTEMS i

i 3.6.1.5 Drywell Air Temperature LCO 3.6.1.5 Drywell average air temperature shall be s 150*F.

l APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Drywell average air A.1 Restore drywell 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> temperature not within average air limit.

temperature to within limit.

B.

Required Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.5.1 Verify drywell average air temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limit.

i 4

i HATCH UNIT 1 3.6-17 Amendment No. 201

f* %t 0-

-4 UNITED STATES j

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20566 000'

'49.....,o GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON. GEORGIA DOCKET NO. 50-366 EDWIN I HATCH NUCLEAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.142 License No. NPF-5 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 (the facility) Facility Operating License No. NPF-5 filed by the Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the licensees), dated February 21, 1996, as supplemented by letters dated May 1 and June 4, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

- 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.142 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.

FOR NUCLEAR REGULATORY COMMISSION

(

A&

He e t N. Berkow,' Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specific *ation Changes Date of Issuance: June 27, 1996

ATTACHMENT TO LICENSE AMENDMENT NO.142 FACILITY OPERATING LICENSE NO. NPF-5 DOCKET NO. 50-366 Replace the following page of the Appendix "A" Technical Specifications with

)

the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.

Remove Paae Insert Paae 3.6-17 3.6-17

Drywell Air Temperature 3.6.1.5 3.6 CONTAINMENT SYSTEMS 3.6.1.5 Drywell Air Temperature LCO 3.6.1.5 Drywell average air temperature shall be s 150*F.

l i

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Drywell average air A.1 Restore drywell 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> temperature not within average air limit.

temperature to within limit.

4 B.

Required Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

aHQ B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.5.1 Verify drywell average air temperature is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limit.

HATCH UNIT 2 3.6-17 Amendment No. 142