-Docket No. 50-320
GPU Nuclear Corporation
ATTN: Mr. F. R. Standerfer
Vice President / Director, TMI-2
.P. O.-Box 480
Middletown, Pennsylvania 17057
Gentlemen:
Subject:
Inspection No. 50-320/88-05
This refers to the routine safety inspection conducted by site inspectors from
February 27 - April 1,1988, of activities authorized by NRC License No. DPR-73
and to discussions of our findings held by Mr. T. Moslak of our office with you
and members of your staff on April 8,1988.
Areas examined during this inspection are described in the inspection report which
is enclosed with this letter. Within these areas, the inspection consisted of
selected examinations of procedures and representatives records,-interviews with
personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation enclosed herewith as Appendix A.
This violation has been
categorized by Severity Level in accordance with the NRC Enforcement Policy, 10 CFR 2, Appendix C.
With respect to this item and the events associated with it,
we are concerned that there has been a degradation in overall control of your fire
protection program.
In addition to the specific corrective actions for the viola-
tien,_we request that you review your fire protection program implementation and
provide the results of that review and any corrective actions that you plan.
Also, this letter acknowledges receipt of your letter, dated February 26, 1988,
in. response to Inspection Report No. 50-320/87-15.
The actions described in your
letter will be reviewed in a future NRC inspection.
Your cooperation is appreciated.
Sincerely,
N 813e4 Bye
seeW.settenhensen
Lee H. Bettenhausen, Chief
Project Branch No. 1
Division of Reactor Projects
0FFICIAL RECORD COPY
DL50-320/88-C5 - 0001.0.0
04/28/88
i\\
8805110157 880504
'
ADOCK 0500032,0 -
(A
r.rer.
..
o, '
.'
.
0I E
'
GPU Nuclear Corporation
2
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-320/88-05
cc w/encls:
T. F. Demmitt, Deputy Director, TMI-2
R. E. Rogan, Licet. sing and Nuclear Safety Director
J. J. Byrne, Manager TMI-2 Licensing
J. E. Frew, Defueling Director
A. Miller, Manager, Plant Operations
S. Levin, Defueling Director
J. B. Lieberman, Esquire
Ernest L. Blake, Jr. , Esquire
W. Potts, TMI-2 Site Operations Director
TMI Alert (TMIA)
Susquehanna Valley Alliance (SVA)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Michael Masr.ik, PM, ' M -2
Robert J. Bores, DRSS
RI:DRPf
RI:DRP[b
RI:DRP h h RI RP
shon] s
stu
dhe
R
CCow*
hausen
TMoslak/cph
an8i88
OFFICIAL RECORD COPY
DL50-320/88-05 - 0002.0.0
04/28/88