ML20153G124

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-409/85-22 on 851217-860214.No Violations Noted
ML20153G124
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/25/1986
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20153G128 List:
References
NUDOCS 8602280028
Download: ML20153G124 (2)


See also: IR 05000409/1985022

Text

id 7A/$

.

.

FEB 251986

Docket No. 50-409

Dairyland Power Cooperative

ATTN: Mr. J. W. Taylor

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by I. Villalva and

J. Wiebe of this office from December 17, 1985 through February 14, 1986, of

activities at the La Crosse Boiling Water Reactor authorized by NRC Operating

License No. DPR-45 and to the discussion of our findings with J. Parkyn and

G. Boyd and other members of your staff during the course of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspections. Within these areas, the inspections consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel. -

No violations of NRC requirements were identified during the course of the

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Goom.

We will gladly discuss any question you have concerning this inspection.

Sincerely,

" Original signed by ILJ.'drieetka"

N. J. Chrissotimos, Chief

Reactor Projects Branch 2

Enclosure: Inspection Report

No. 50-409/85022(DRP)

See Attached Distribution

RIII g RI -

RII RIII

Villalva/rr L c an Bo/d Ch ssotimos

o-2,-sG yd

G602280028 860225

PDR ADOCK 05000409

G PDR gl

.

I t 0

. - . . -- -

.

'

.

Dairyland Power Cooperative 2

,

FE8 251986

Distribution

cc w/ enclosure:

J. Parkyn, Plant Superintendent

i

DCS/RSB (RIDS)

i

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

i Commission

Spark Burmaster, Coulee

Region Energy Coalition

l

4

>

1

i

l

!-

.

I

1

1

_ . . _ _ .

-

,,. ._

- .-- , . - - , - - , ,.