ML20153G121

From kanterella
Jump to navigation Jump to search
Forwards Projected Schedule of Operator Licensing Exam Requirements for FY89-92,per Generic Ltr 88-13
ML20153G121
Person / Time
Site: Oyster Creek
Issue date: 09/01/1988
From: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
To: Hannon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
GL-88-13, NUDOCS 8809080044
Download: ML20153G121 (3)


Text

(

l OPU Nuclear Corporation Nuclear es== 388 Forked River.New Jersey 087310388 609 971 4000 Writer's Direct Dir.I Nurrber:

September 1,1988 i

Mr. John Hannon, Chief l

Operator Licensing Branch l

OWFN-10D-18 U.S. Nuclear Regulatory Corenission t

i Washington, DC 20555

Dear Mr. Hannon:

Subject:

Oyster Creek Nuclear Generating Station l

Docket No. 50-219 l

Generic Letter 88-13 Operator Licensing Examinations Generic letter 88-13 requested that GPU Nuclear provide a projected schedule of Licensed Operator examination requirements for FY 1989, FY 1990, FY 1991, and FY 1992.

Enclosures 1 and 2 are being submitted in response to I

your request.

Should our operational requirements necessitate a revision to l

our projected schedule, we hill inform you as expeditiously as possible.

1 If you should have any questions, please contact Gil Cropper of the Oyster Creek Training Department at (609)971-4242, i

V y truly ours 1

- y SW 1

E. ritzpatrick Vice President and Director Oyster Creek EEF/MH/dmd Enclosures i

(0268A)

{

l cc: Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Comission 475 Allendale Road l

King of Prussia, PA 19406 l

l HRC Resident Inspector l

Oyster Creek Nuclear Generating Station Forked River, RJ 03731 8809000044 000901 l

hDR ADOCK 05000219

[0gD y,

GPU Nuc' ear Corporaten is a subscary cf the GeretalPubhc UtMt'es Ccrporaticn L

l

F PROPOSED OPERATOR LICLMSING EXAMINATION SCHEDULE FORMAT Facility OYSTER CREEK NRC Region !

FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92) 1.

Date 12/88 10/89 11/90

  1. RO 13 8
  1. SRO Instant 8

2

  1. 5R0 Upgrade 4

1

  1. SR0 Limited 2.

Date 7/91

  1. RO
  1. SR0 Instant
  1. 5R0 Upgrade 3
  1. 5R0 Limited

~

e PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Fa cility OYSTER CREEK NRC Region I

FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)

(10/1/89-9/30/90)

(10/1/90-9/30/91)

(10/1/91-9/30/92) 1.

Date 2/89 Date Date 2/91 Date 2.

Date 3/89 Date Date 3/91 Date 3.

Date Date Date Da.e 4.

Date Date Date Date l

l n

-