Ghoga Ther Corrpany 133 P'edmont Aerbe g
A::snta. Georg.a 30308
, Te+ pore 404 526 6526 P.taing #dd'eSS' Ftst Of tce Box 4545
/yama. Geova 30302 R P. Mcdonald the SOLfhyn etCtrc $f5/em Execut ve V.ce Presder.t rucar operatens HVS-40 I
1217U X7GJ17-C210 August 31, 1988 Mr. John Hannon, Chief Operator Licensing Branch OHFN-100-18 U. S. Nuclear Regulatory Commission Hashington, D.C.
20555 PLANT HATCH - UNITS 1-2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68 CONSTRUCTION PERMIT CPPR-109 RESPONSE TO GENERIC LETTER 88-13 "0PERATOR LICENSING EXAMINATIONS" Gentlemen:
In response to the subject letter, Georgia Power Company requests NRC staff site visits to conduct operator licensing examination through September 1992 as indicated on '.he enclosed schedules.
If the NRC is not able to support our requested schedules, please contact J. J. Badgett at (404) 526-7021.
1 Sincerely.
R. P. Mcdonald Enciosure:
Completed NRC GL 88-13 Enclosures 1 and 2 for Plants Hatch and Vogtle HJB:ju c:
(see next page) geO 8809080015 880831 hDR ADOCK 050VO321 PDC
r Georgia Power sk Operator Licensing Branch U. S. Nuclear Regulatory Commission August 31, 1988 Page Two c: Georaia Power Comoany Mr. P. D. Rice, Vice' President and Vogtle Project Director Hr. G. Bockhold, Jr., General Manager - Plant Vogtle Mr. L. T. Gucwa, Manager Hatch Engineeering and Licensing Mr. J. P. Kane, Manager Vogtle Engineeering and Licensing G0-NORMS U. S. Nuclear Reaulatory Commission. Heshinaton D.C.
Mr. J. B. Hopkins, Licensing Project Manager - Vogtle Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Ccamission. Region II Dr. J. N. Grace, Regional Administrator Mr. J. F. Rogge, Senior Resident Inspector Operations - Vogtle Mr. J. E. Henning, Senior Resident Inspector - Hatch I
1217U
PROPOSED OPERATOR LICENSI'iG EXAMINATION SCHEDULE FORMAT Facility A. W. Vogtle NRC Region 11 FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92) 1.
Date 10-31-88 12-4-89 12-3-90 12-2-91
- RO 25**
0 12 8
- SRO Instant 36**
0 4
8
- SRO Upgrade 0
8 6
4
- SR0 Limited 0
0 0
0 12-5-88 Written 2.
Date 1-9-89 Operating 6-25-90 6-3-91 6-1-92
- RO O
O 8
8
- SR0 Instant 11 12 8
8
- SRO Upgrade 0
6 4
4
- SR0 Limited 0
0 0
0, Please indicate initial cold license examinations by placing an asterisk (*)
Please indicate examinations intended to extend an Operator's by the date.
license to a second or subsequent unit with two asterisks (**) (e.g., if Unit j
One is in operation and ynit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be examined to extend their licenses Unit Two, then indicate "R0 3,5**.")
3.
Date
,6-5-89
- RO 8
- SR0 Instant 5
- SR0 Upgrade 0
i
- SR0 Limited
_9 4
~
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Facility A. W. Vogtle NRC Region II FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)
(10/1/89-9/30/90)
(1D/1/90-9/30/91)
(10/1/91-9/30/92) 1.
Date 6n6/89 Da te 6/25/90 Date 6/24/91 Date 6/22/92 2.
Date_7/10/89 Da te 7/9/90 Date 7/8/91 Date /6/92 7
3.
Date 7/24/89 Date 7/23/90 Date 7/22/91 Date 7/20/92 4
Da te_ 8/7/89 Da te 8/6/90 Da te_ 8/5/91 Date /3/92 5.
Date 8/21/89 DateLB/20/90 Date 8/19/91 Date 8/17/92 6.
Date E5/89 Date 9/4/90 Date 9/3/91 Date 8/31/92 4
6 1
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Facility E. 1. Hatch NRC Region FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/
1.
Date 5/30/89 7/9/90-4/8/91 9/28/92
- RO 2
0 12 10 (SRO Instant 13 11 2
10
- SRO Upgrade 3
4 0
.4 WSR0 Limited 0
0 0
0 2.
Date 9/25/89 8/26/91
- RO 12 0
2 0
(SR0 Instant 2
0 11 0
- SRO Upgrade 0
0 0
4
- SRO Limited 0
0 0
0 Please indicate initial cold license examinations by placing an asterisk (*)
by the date.
Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in operation and Unit Two is approaching fuel load and three R0 candidates with no previous license are to be examined on both Units One and Two and five R0 candidates licensed on Unit One are to be examined to extend their licen Unit Two, then indicate "R0 3,5".")
1 j
u 0
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT Facility E. 1. Hatch NRC Region it i
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)
(10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92) 1.
Date sn/89 Date 8/6/90 Date 8/5/91 Date 8/3/92 2.
Date 8/21/89 Da te 8/20/90 Date 8/19/91 Date 8/17/92 2
3.
Date_9/5/89 Date 9/4/90 Date 9/3/91 Date 8/31/92 4
Date_9/18/89 Da te_9/17/90 Date 9/16/91 Date 9/14/92 I
e I
i e
4 e
l i
l l
i
- - - - - - - - - - - - - - - - - - - - -