Forwards Safety Insp Rept 50-461/88-18 on 880707-28 & 0810- 17.No Violations Noted
ML20153F933
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/30/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20153F936 List:
References
NUDOCS 8809070548
Download: ML20153F933 (2)


See also: IR 05000461/1988018

Text

a ,

' '

,  ;

1 '>

.. ..

,

AUG 3 01988

,

i ,

.

/

Docket No. 50-461

Illinois Power Company

'

ATTN: Mr. W. C. Gerstner

Executive Vice President

>

500, South 27th Street

, Decatur, IL 62525

Gentlemen: g

This refers to the special safety inspection conducted by Mr. J. F. Schapker

of this office on July 7, 8, 12, 13, 27, 28 and August 10, 11 and 16, 17, 1988,

of activities at Clinton Power Station, Unit 1, authorized by NRC Operating

License No NPF-62 and to the discussion of our findings with Mr. D. P. Hall .

ud others of your staff at the conclusion of the inspection.

The NRC Region III Office of Investigation (01) receive'd allegations

concerning activities that occurred during construction at the Clinton Power

Station. The Division of Reactor Safety (ORS) was assigned to assess the

safety significance of these concerns.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified c!uring the course of this

inspectlun.

! In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

i this letter and the enclosed inspection report will be placed in the NRC

i 'Public Document Room.

I

We will gladly discuss any questions you have concerning this inspection.

l

Sincerely,

,

  1. Og, ORIGINAL SIGNED BY D. H. DANIELSON (FOR)

(

' th J. J. Harrison, Chief

Engineering Branch

,

l (00

co u

,

E8 Enclosure: Inspection Report

l C@ No. 50-461/88018(DRS) -

r o y/W

See Attached Distribution ,

0. 0

RIII RI!! RIII RIII RIIIh

,b

'

h!.h 4//

! 0 on ooper rison e

ya Schapk r/jlr i

l 0

, t/3r/V! tj3oj 'rf fWH gff t 1

l 60\

! _ - .

V

-_ - _ - . _ .

- _

,

of'

.

<

/

,.- ,

Illinois ~ Power Company 2 -

AUG 3 01988

Distribution

cc w/ enclosure:

D. P. Hall, Vice President ,

, R. D. Freeman, Manager,

Nuclear Station

Engineering Departnert

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief. Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illinois Department of

Nuclear Safety

D. Schopfer, Project Manager,

Sargent & Lundy Engineers

-.