Forwards Insp Rept 50-425/88-26 on 880504-26.No Violations or Deviations Noted
ML20153F647
Person / Time
Site: Vogtle 
Issue date: 08/24/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20153F650 List:
References
NUDOCS 8809070385
Download: ML20153F647 (3)


See also: IR 05000425/1988026

Text

__ __________

_ _ _ _

_ _ _ _ _ _ _ _ _ _

.

s.

-

V Ar-

.

AU6 24m

/

'

-

-

.

'

,

f

?

!

Docket No. 50-425

License No. CPPR-109

l

<

Georgia Power Company

i

ATTN:

Mr

W. G. Hairston, III

Senior Vice President -

!

Nuclear Operations

l

P.O. Box 4545

>

Atlanta, GA

30302

l

Gentlemen:

l

f

SUBJECT: NRC INSPECTION REPORT NO. 50-425/88-26

This refers to the Nuclear Regulatory Commission (NRC) review conducted by

$

M. Hunt during May 4 - 26, 1988.

The review included an inspection of

activities at your Vogtle facility. At the conclusion of the inspection, the

)

findings were discussed with those members of your staff identified in the

!

enclosed inspection report,

i

?

Areas examined during the inspection are identified in the report. Within

j

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

l

activities in progress.

-

Within the scope of the inspection, no violations or deviations were

!

identified.

(

,

l

Your attention is invited ot the unresolved item identified in the inspection

!

report.

This matter will be pursued during future inspections.

l

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

I

I

Title 10. Code of Federal Regulations, a copy of this letter and its enclosure

I

will be placed in the NRC Public Document Room.

l

Should you have any questions concerning this letter, please contact us.

Sincerely,

f

I

Alan R. Herdt, Chief

Engineering Branch

,

Division of Reactor Safety

I,

Enclosure:

(See page 2)

8809070385 880824

PDR

ADOCK 05000425

1

G

PNV

i

'

'kk

i

!

L

- - -

i

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

AUG 241988

-

.

.

.

.

Georgia Power Compary

2

Enclosure:

NRC Inspection Report

cc w/encis:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Projar.t

Director

C. W. Hayes, Vogtle Quality

Assurance Manager

G. B. Bockhold, Jr. , General Manager

Nuclear Operations

L. T. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

D. Kirkland, III, Counsel .

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/encis:

E. Reis, OGC

J. Hopkins, NRR

M. Sinkule, RII

ORS, Technical Assistant

NRC Resident Inspector

Document Control Desk

State of Georgia

1

pII

RI

'

RII

Mut

T 6'nl $

Sinkule

i

08/g/83

p0S/ /83

03//9/ 83

2

.

_ _ _ _ _ _ _ _ _ - _ _ _ __ ._-

o

..

'

.

.

s

i

l

I

ENCLOSURE 1

i

List of Open Items

i

i

1.

Unresolved Ites 88-26-01

a.

The licensee does not have a ready means of demonstrating process

conservatism in the current application of electrical-raceway

safety-train separation criteria. The existing criteria vary in the

prescriptive documents that reflect implementation of the Wyle

i

Laboratories test data used as the bases for not installing fire

'

separation barriers otherwise required by NRC Regulatory Guide 1.75.

b.

The licensee did not have or show the use of appropriate thermal

separation criteria for minimum space between electrical raceways and

>

thermally-hot equipment other than piping,

c.

The licensee readiness review did not carry out the planned review

element of cable tray cover installation activities due to cable

pulling operations then in progress.