. r-Arizona Nuclear Power Project P.o. Box 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-34950 -EEVB/TDS/DRL-92.11 l
February 7, 1986 l
U. S. Nuclear Regulatory Commission h
Region V e
l 1450 Maria Lane - Suite 210 O
O Walnut Creek, CA 94596-5368 g
Attention:
Mr. D. F. Kirsch, Acting Director 3
Division of Reactor Safety and Projects y
q' Palo Verde Nuclear Generating Station (PVNGS)
Units 2, 3
<a Docket Nos. 50/529, 530 l
l
Subject:
Time Extension for Report - DER 85-42 A 50.55(e) Potentially Reportable Deficiency Relating to Diesel Generator Fuel Rack Linkage File: 86-006-216; D.4.33.2
Reference:
(A) Telephone conversation between R. C. Sorenson and T. P. Siegfried on December 9,1985 (B) ANPP-34488, Dated January 8, 1986 (Interim Report) l
Dear Sir:
l The NRC was notified of a potentially reportable deficiency in Reference (A),
and an Interim Report was transmitted by reference (B). At that time it was estimated that a Final Report would be available by February 14, 1986.
Bechtel is now finalizing the design for a new governor fuel linkage lever l
which will be manufactured at the jobsite to replace the existing levers.
l It is now expected that this information will be finalized by harch 14, 1986, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, h
8602260314 e60207
(
gDR ADOCK 0 g9 Executive Vice President E. E. Van Brunt, Jr.
N Project Director l
EEVB/DRL/ldf 1
cc: See Page 2 0
t Y~)
. Hr. D. F. Kirach
-Acting Director ANPP-34950-EEVB/TDS/DRL-92.11 February 7, 1986 l
Page 2 i
cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission
~
Washington, D. C. 20555 J. G. Haynes.
(4060)
W. E. Ide (4074)
D. B.'Fasnacht.
(6330)
. A. C. Rogers (4056)
L. A. Souza (6195)
T. D. Shriver (6085) j D. E. Fowler.
(6260)
C. N. Russo (6330) l J. R. Bynum
. (6125)
J. M. Allen (6130)
D. R. Canady (6177).
A. C. Gehr (4141)
G. A. Hierzer (6330)
W. G. Bingham (6330)
R. W. Welcher (Bechtel/Norwalk)
H. D. Foster (6330)
D. R. Hawkinson (6330)
R.-P.
Zimmerman (6241)
M. L. Clyde (6079)
~
B. T. Parker (6345)
J. Provasoli (4057)
D. N. Stover (4082) l J. D. Houchen (6330) l J. E. Kirby' (6551)
Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 r