Deficiency Rept DER 85-42 Re Diesel Generator Fuel Rack Linkage.Initially Reported on 851209.Bechtel Now Finalizing Design for New Governor Fuel Linkage Lever Which Will Be Mfg at Jobsite.Next Rept Will Be Submitted by 860314
ML20153F625
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/07/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34950-EEVB, DER-85-42, NUDOCS 8602260314
Download: ML20153F625 (2)


Text

'

. r-Arizona Nuclear Power Project P.o. Box 52034 e PHOENIX, ARIZONA 85072-2034 ANPP-34950 -EEVB/TDS/DRL-92.11 l

February 7, 1986 l

U. S. Nuclear Regulatory Commission h

Region V e

l 1450 Maria Lane - Suite 210 O

O Walnut Creek, CA 94596-5368 g

Attention:

Mr. D. F. Kirsch, Acting Director 3

Division of Reactor Safety and Projects y

q' Palo Verde Nuclear Generating Station (PVNGS)

Units 2, 3

<a Docket Nos. 50/529, 530 l

l

Subject:

Time Extension for Report - DER 85-42 A 50.55(e) Potentially Reportable Deficiency Relating to Diesel Generator Fuel Rack Linkage File: 86-006-216; D.4.33.2

Reference:

(A) Telephone conversation between R. C. Sorenson and T. P. Siegfried on December 9,1985 (B) ANPP-34488, Dated January 8, 1986 (Interim Report) l

Dear Sir:

l The NRC was notified of a potentially reportable deficiency in Reference (A),

and an Interim Report was transmitted by reference (B). At that time it was estimated that a Final Report would be available by February 14, 1986.

Bechtel is now finalizing the design for a new governor fuel linkage lever l

which will be manufactured at the jobsite to replace the existing levers.

l It is now expected that this information will be finalized by harch 14, 1986, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, h

8602260314 e60207

(

gDR ADOCK 0 g9 Executive Vice President E. E. Van Brunt, Jr.

N Project Director l

EEVB/DRL/ldf 1

cc: See Page 2 0

t Y~)

. Hr. D. F. Kirach

-Acting Director ANPP-34950-EEVB/TDS/DRL-92.11 February 7, 1986 l

Page 2 i

cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

~

Washington, D. C. 20555 J. G. Haynes.

(4060)

W. E. Ide (4074)

D. B.'Fasnacht.

(6330)

. A. C. Rogers (4056)

L. A. Souza (6195)

T. D. Shriver (6085) j D. E. Fowler.

(6260)

C. N. Russo (6330) l J. R. Bynum

. (6125)

J. M. Allen (6130)

D. R. Canady (6177).

A. C. Gehr (4141)

G. A. Hierzer (6330)

W. G. Bingham (6330)

R. W. Welcher (Bechtel/Norwalk)

H. D. Foster (6330)

D. R. Hawkinson (6330)

R.-P.

Zimmerman (6241)

M. L. Clyde (6079)

~

B. T. Parker (6345)

J. Provasoli (4057)

D. N. Stover (4082) l J. D. Houchen (6330) l J. E. Kirby' (6551)

Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 r