Interim Deficiency Rept DER 85-38 Re QA Audit at Ge. Initially Reported on 851108.Submittal of Final Rept Delayed Until 860314 Due to Time Needed for Auditing GE Facility & GE Response
ML20153F610
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/14/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-35134-EEVB, DER-85-38, NUDOCS 8602260306
Download: ML20153F610 (2)


Text

_

e

" Y~ ^

RECEIVt0 tmc Arizona Nuclear Power Project 1936 FP 20 AH 10 20 P.O. BOX 52034 e PHOENIX. arf 2ONA 85072-2034 ANPP-35134/EEVBJr/LAS/DRL-92.11 FILE: 86-006-216; 86-65s4fl#llD.4.33.2 February 14, 1986 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 2, 3 Docket Nos. 50/529, 530

Subject:

Time Extension for Report - DER 85-38 A 50.55(e) Potentially Reportable Deficiency Relating to QA Audit at General Electric

Reference:

(A) Telephone conversation between A. Hon and T. P. Siegfried on November 8, 1985 (B) ANPP-34165, Dated December 4, 1985 (Interim Report)

(C) ANPP-34397, Dated January 3, 1986 (Time Extension)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B) and a Time Extension was issued by Reference (C). At that time, it was estimated that a Final Report would be available by February 14, 1986.

Due to the time needed for auditing of the G. E. facility, and the required time for G. E. to respond, it is now expected that this information will be finalized by March 14, 1986, at which time a complete report will be submitted. There is no new information or change to the Interim Report at this time.

{

Very truly our r--

1 CLR 41 E. E. Van Brunt, Jr.

Executive Vice President Project Director' EEVB/DRL/ldf Distribution:

See Page Two 8602260306 860214 DR ADOCK O y9 IE-]7

[~

a_

.@.).

FebruaryL14, 1986...

L ANPP -35134-EEVB/LAS/DRL-92.11 Time Extension for Report, DER 85-38

- Mr..D. F. Kirsch Page Two

-cc:

Richard DeYoung.. Director

- Office of Inspection and Enforcement' U; S.. Nuclear Regulatory-Commission Washington, D. C.

- 20555 J. G. Haynes (4060)

W. E.--Ide

'(4074).

D. B. Fasnacht (6330)'

A. C. Rogers.

-(4056)

L. A. Souza (6085)

T. D. Shriver

,(6195)

D. E. Fowler

'(6260)

C.'N. Russo (6330)

J. R. Bynum (6125)

J. M. Allen (6130)

D. Canady (6345)

A. C. Gehr (4141)

G. A. Hierzer

-(6330)

W. G. Bingham (6330)

R. W. Welcher (Bechtel/Norwalk)

H. D. Foster (6330)_

D. R. Hawkinson (6330)

R. P. Zimmerman (6241)

M. L. Clyde (6079)

B. T. Parker (6345)

J. Provasoli (4057)

D. N. Stover (4082)

J. D. Houchen

-(6330)

J. E. Kirby (6501)

Records Center Institute of Nuclear Power Operations 1100 circle-75 Parkway, Suite 1500 Atlanta, Georgia 30339 i

s E

m.

m.

.m

-m

-.a. -...m- -

mm a.m m.m m

m.. ---.m

.