l1ECEll!ED f#10 4
4 Arizona Nuclear Power Projectsd Fm 20. /JI D 28 3
P.o. BOX 52034 e PHOENIX, ARIZONA 85072-2034 i
ANPP-35127-EEVRRJi/MS/,DRL-92.11 February 14, 1986 U. S. Nuclear Regulatory Commission-Region V
)
1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Docket Nos. 50/529, 530
Subject:
Time Ertension for Report - DER 85-39 A 50.35(e) Potentially Reportable Deficiency Relating to NSSS Pipe stop Bolting Material File: 86-006-216
Reference:
(A) ANPP-34232, Dated December 12, 1985 (Interim Report)
(B) ANPP-34396, Dated January 3, 1986 (Time Extension)
(C) ANPP-34664, Dated January 16, 1986 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency and received an Interim Report, reference (A). Time extensions were requested by references (B) and (C). Our last forecast indicated that the Final Report would be completed by February 14, 1986. A Final Report has been generated and is currently being evaluated for technical adequacy and reportability.
It is now expected that this information will be finalized by March 7,1986, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, j
CLt>--
)
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/DRL/ldf 1
8602260297 860214 PDR ADOCK 05000529 S
PDR,
I p I
t(
J E,rl
s s
f._3
^
f" y f,
^ "
^
?'j a
,j-j x *'
c
^ h.
- y, s
ANPP-35127-EEVBJr/LAS /DRL-92.11 -
February. 14,.1986 Mr. D..F. Kirsch DER 85-39 Page Two
..cc:
Richard 'DeYoung,,_ Director,
l Office of Inspection and Enforcement.
+
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. G. Haynes (4060')
t "W.
E. Ide (4074) j D. B. Fasnacht (6330)
A. C.LRogers1 (4056).
L.~A.
Souza (6195).
T. D.-Shriver (6195)
D. E. Fowler (6260)
C. N. Russo (6330)
J. R. Bynum (6125)
J. M. Allen (6130)
D. Canady (6345)
A. C. Gehr (4141):
G. A. Hierzer (6330) j W. G. Bingham (6330) j R. W.. Welcher.
(Bechtel/Norwalk)
L H. D. Foster-(6330)
D. R. Hawkinson (6330) i R. P. Zimmerman (6241)
M. L. Clyde (6079) 4 B. T. Parker
'(6345) 2 J. Provasoli
'(4057)
D. N. Stover (4082)
J. D. Houchen (6330)'
J. E. Kirby (6501)-
2 Records Center Institute of Nuclear Power Operations i -
1100 Circle 75 Parkway,-Suite 1500 Atlanta, Georgia: 30339 i
1 i
e
+
~
g N
i 4
- I
...m...
.m m m
u
...m
..m
-