ML20153F175

From kanterella
Jump to navigation Jump to search

Forwards BAW-1884, Vessel Fluence Reduction Fuel Cycle Study
ML20153F175
Person / Time
Site: Rancho Seco
Issue date: 02/13/1986
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20153F180 List:
References
RJR-86-47, TAC-59976, NUDOCS 8602250329
Download: ML20153F175 (1)


Text

- - _ _ - - -

/

I f

$SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street, P.O. Box 15830. Sacramento CA 95852-1830,(916) 452-3211 RJR 86-47 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA February 13, 1986 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTN FRANK J MIRAGLIA JR DIRECTOR DIVISION OF PWR LICENSING-B U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 i

RANCHO SECO NUCLEAR GENERATING STATION - UNIT NO. 1 DOCKET 50-312 YESSEL FLUENCE REDUCTION - FUEL CYCLE STUDY

References:

1) Letter " Flux Reduction to Delay Reaching PTS Screening Criteria", John J. Mattimoe to John F. Stolz, February 8,1983
2) Letter, " Assessment of fracture Toughness of the Rancho Seco Vessel", R. J. Rodriguez to Frank J. Miraglia, January 23, 1986 The vessel fluence reduction study, that was stated to be under consideration in Reference 1, has been completed.

The results are presented in Babcock & Wilcox report BAW-1884, " Vessel Fluence Reduction Fuel Cycle Study", which is attached to this letter.

This report is referenced by Reference 2, which contains the District's response to 10 CFR 50.61.b.l.

\\

M\\

R. J. R0 IGUEZ ASSISTANT GENERAL M NAGER, NUCLEAR Attachment hj 2-e t

d

\\

,