ML20153F157

From kanterella
Jump to navigation Jump to search
Forwards Revs to Emergency Plan Implementing Procedures (Epips),Rev 3 to Administrative Procedure 8N718.04.00 & Revised Cover Sheets for EPIPs Listed in Attached Cover Sheet Listings.Encls Withheld (Ref 10CFR2.790(a) & 9.5(a))
ML20153F157
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/13/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-35047-EEVB, GL-81-27, NUDOCS 8602250324
Download: ML20153F157 (2)


Text

j Arizona Nuclear Power Project P.O. box $2034 e PHOENIX, ARIZONA 85072-2034 February 13, 1986 ANPP-35047-EEVB/DAL/98.05 Mr. John B. Martin, Regional Administrator

-m Office.of Inspection and Enforcement G

U.S. Nuclear Regulatory Commission y

Region V g

3 o

1450 Maria Lane, Suite 210

=5

=o Walnut Creek, CA 94596-5368

$h E

SE C

Subject:

Palo Verde Nuclear Generating Station (PVNGS) g m

Units 1, 2, and 3 Docket Nos. STN 50-528 (License NPF-41) d STN 50-529 (License NPF-46)

STN-50-530 Emergency Plan Implementing Procedure Update File: 86-056-026; 86-002-493

Dear Mr. Martin:

Arizona Nuclear Power Project (ANPP) is submitting herewith, pursuant to 10CFR50, Appendix E, updated information in the form of copy no. 8-8 of implementing procedures for the Emergency Plan. The revisions made to the existing plan involve Emergency Plan Implementing Procedures (EPIP's) 02, 03, 04, 03, 06, 11, 12, 13, 14, 15, 19, 20, 21, 24, 25, and 31. Additionally, we are forwatding Arizona Nuclear Power Project Administrative Procedure 8N718.04.00, Revision 3. We are also including revised cover wheets for those EPIP's listed in the attached cover sheet listings.

In accordance with Generic Letter 81-27, certain EPIP's have been marked to indicate information considered private or proprietary (including names, home telephone num-bers, and internal and external telephone numbers that must remain available during an emergency). The specific information considered private or proprietary has been bracketed in the respective pages of the following EPIP's:

EPIP No.

PAGE No.

EPIP #02 PCN 01 Rev. 4 EPIP #3 Rev. 10 pp 7, 10, 11, 12, 25 EPIP #4 Rev. 9 pp 9, 11, 13, 14, 29, 33, 36 EPIP #5 Rev. 9 pp 9, 10, 11, 12, 13, 29, 33, 37 EPIP #6 Rev. 9 pp 8, 10, 11, 12, 13, 29, 33, 37 EPIP #11 Rev. 5 pp 16, 17, 18, 19, 20, 39, 42 EPIP #12 Rev. 5 p 8 EPIP #13 Rev. 5 pp 20, 22, 27, 29, 34, 49 EPIP #14APCN 02 Rev. 6 EPIP #15 PCN 01 Rev. 3 EPIP #19 Rev. 4

.EPIP #20 Rev. 4 pp 5, 9, 11, 13, 14, 16, 17, 18, 19, 23, 24, 27 EPIP #21 Rev. 4 EPIP #24 PCN 01 Rev. 3 j

EPIP #25 Rev. 4 l [-

m EPIP #31 Rev 4 8602250324 860213 PDR ADOCK O h28 l

f g 35

(

{-

As Mr. John B. Martin Emergency Plan Implementing Procedure Update ANPP-35047 Page 2 Ue request the above information be considered confidential and withheld from public disclosure pursuant to 10CFR2.790(a) and 10CFR9.5(a).

Two copies (8-9A and 8-9B) of the revisions are herewith forwarded to the Document Control desk, USNRC, as specified in Section V of Appendix E to 10CFR50.

Additional copies of these revisions are being forwarded to Gail Temple (8-5) and Falk Kantor (8-6) of the NRC.

I Very truly yours,,

C C(

C.

COLL

'nLLt(

~

E. E. Van Brunt, Jr.

Executive Vice President Project Director Attachments cc:

E. A. Licitra (w/o)

A. C. Gehr (w/o)

R. P. Zimmerman (w/o)

G. M. Temple (copy #8-5)

F. Kantor (copy #8-6)

NRC Document Control Desk (copies #8-9A and 8-9B)

<-