i APR 2 91988 Docket No. 50-354 Public Service Electric & Gas Company ATTN: Mr. Steven E. Hiltenberger Vice President and Chief Nuclear Of ficer Post Office Box 236 Hancocks Bridge, New Jersey 08038 Gentlemen:
Subject:
10 CFR 50.49 EQUIPMENT QUALIFICATION INSPECTION, HOPE CREEK GENERATING STATION (50-354/88-03)
This refers to your letters of April 15, 1988, and February 5, 1988, regarding a plan and implementation schedule for restructuring your EQ files at the Hope Creek Generating Station by April 15, 1988.
Thank you for informing us of the delay in submitting the plan and implementing schedule for restructuring the EQ files.
We agreed that the EQ files, in the present form, contain the necessary information for maintaining the EQ qualification of electrical equipment within the scope of 10 CFR 50.49 and can be easily referenced by experienced personnel using the files on a daily basis.
Your request for extending the due date of the plan and implementing schedule to June 30, 1988 is granted.
Should you have any questions on this matter do not hesitate to contact us.
Your cooperation in this matter is appreciated.
Sincerely, ORIGINAL SK WILLIAM V. JOHuwd William V. Johnston Acting Director, DRS cc w/ encl:
S. LaBruna, General Manager, Hope Creek Operations W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic Electric Company L. A. Reiter, General Manager - Licensing and Reliability Rebecca A. Green Bureau of Radiation Protection Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Jersey fd 0FFICIAL RECORD COPY PSEGLTR. - 0001.0.0 8805100237 880429 04/27/88 PDR ADOCK 05000354 i
g O
Public Service Electric and Gas Co.
2 bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
ORP Section Chief Robert J. Bores, DRSS i
'I i
.I a
c)G RI:0RS,j)
RI:DRS RI:0RS Paolino And r n Durr f>1\\i6 t/-2f 5Y t
0FFICIAL RECORD COPY PSEGLTR. - 0001.1,0 04/25/88 1
\\
t
/
Pubhc Servico eectr c and Gas Comcany Steven E. Mittenberger Put c Serv,ce Eiec:r c and Gas Carpany P O Bom 236. Hancocks Br age. NJ 08038 609 339#99 v<e onoem-oc w cwrn AFR 151968 NLR-N88054 United States Nuclear Regulatory Commission Document Control Desk l
Washington, DC 20555 Gentlemen HOPE CREEK EQUIPMENT QUALIFICATION PROGRAM RESTRUCTURING OF EO FILES HOPE CREEK GENERATING STATION i
i DOCKET NO. 50-354 l
During the January 25-29, 1988 NRC team inspection of the Hope Creek Equipment Qualification (EO) Program, a concern was raised with regard to the auditability of the purchase order-based EQ files.
Public Service Electric and Gas Company (PSE&G) responded l
in a letter of February 5, 1988 that restructuring of the EO files had been considered prior to the arrival of the NRC inspection team and that a plan and implementation schedule for such an effort would be available by April 15, 1988.
Although response to the immediate concerns of the NRC inspection team (questions on terminal blocks and EQ instrument loop accuracy) and followup of other inspection findings during the current Hope Creek refueling outage have been of primary cencern, initial discussions related to the restructuring of the E0 files have been held.
Initial estimates for the effort have turned out to be quite capital and manpower intensive.
The Engineering and Plant Betterment Department (E&PB) has been tasked to reevaluate the scope and schedule for the EQ file restructuring effort so that its implementation may be more cost effective.
So as not to present an incomplete or unrealistic scope and implementation schedule for this project, PSE&G asks that the due date for presentation of this information to NRC be changed to June 30, 1988.
This will allow time for alternative approaches to be evaluated and for estimated expenditures to be approved.
l l
C7 A /[ Q 7 /"\\ n fU
^
vvvgm~v1u
% fl.
l
i
. c ~;
- e
\\_i Document Control Desk 2
APA 1 5 333 i
In the meantime, the existing purchase order-based E0 files will be maintained.
As was determined by the NRC inspection team, these files contain the information necessary for qualification of the equipment within the Hope Creek E0 program and are easily referenced by those who use them on a daily basis.
The requirements of 10CFR50.49 are therefore being adequately addressed at this time.
Should you have any problems with regard to this request, please do not hesitate to contact us.
Your cooperation in this matter is appreciated.
Sincerely, d d. 191<2 6 b y / 4st C
M r. G.
W. Rivenbark USNRC Licensing Project Manager Mr.
G.
W.
Meyer USNRC Senior Resident Inspector Mr. W. T.
Russell, Administrator USNRC Region I Mr.
D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 i