Notifies That Latest FEMA Telephone Survey of Alert & Notification Sys Indicates Corrective Actions Outlined in Improved Sys But Failed to Achieve Adequate Level of Effectiveness.Third Survey Will Be Conducted
ML20153F012
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/19/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8602250240
Download: ML20153F012 (2)


Text

_

FEB I 91986 In Reply Refer To:

Docket: 50-267 Public Service Company of Colorado ATTN:

0. R. Lee, Vice President Electric Production P. O. Box 840 Denver, Colorado 80201-0840 Gentlemen:

We have received the latest Federal Emergency Management Agency (FEMA) evaluation report on the status of the Fort St. Vrain Nuclear Generating Station alert and notification system. The report contains earlier evaluation information and the results of the latest telephone survey conducted after the June 18, 1985, test of the system.

The FEMA report indicates that the corrective actions for the alert and notification system deficiency committed to in your letter dated April 4,1965, did improve the effectiveness of the system, but failed to achieve an adequate level of effectiveness.

Because of this, FEMA could not make a finding of adequacy and the deficiency still exists.

FEMA states that in consideration of this, you have committed to the installation of a siren in the Plattville, Colorado area by February 14, 1986, which is anticipated to improve the system effectiveness to an acceptable level. This will be verified by a third telephone survey and an updated evaluation finding will be submitted to the NRC.

We will continue to review your corrective actions for this deficiency and will determine an appropriate course of action under our regulations based on the subsequent modification and evaluation of the system. You should continue to provide the supplemental means for alerting and notifying the public identified in your letter of April 4,1985, until the system is determined to be acceptable.

Please keep this office informed of any changes in the alert and notification system and the results of any tests or assessments conducted to evaluate the system.

If your have any questions regarding this letter, please contact Mr. J. B. Baird of this office 817/860-8185.

Sincerely,

_%dnni Signed bv:"

J. E. Gagliar o, Chief Reactor Prc j cts Branch cc:

(continued next page)

(

[

L/

RIV:EP C:EP&S D:CQS C:RPSA C:RPB JBBaird/

LAYand RLE a art JPJitudon JEGagl do 02/i/ /8 02/si/86 02/[( /86 02/@86 02/j3 /

B602250240 e60219 PDR ADOCK 05000267, F

PM

e-Public Service Company of Colorado cc:

J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 19 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address)

Colorado Radiation Control Pregram Director bec to DMB (IE35) bec distrib. by RIV:

RPB DRSP Resident Inspector R. D. Martin, RA Section Chief (RPB/A)

RSB Section Chief (RSB/ES)

J. B. Baird R&SPB L. A. Yandell MIS System R. L. Bangart RSTS Operator RIV File