Text
~
,
'
'
AUS 231988
Docket No. 50-425
License No. CPPR-109
Georgia Power Company
.
ATTN: Mr. W. G. Hairston, III
'
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
>
,-
SUBJECT:
NRC INSPECTION REPORT NO. 50-425/88-27
l
This refers to the Nuclear Regulatory Commission (NRC) review conducted by
.
M. D. Hunt during May 4 - 26, 1988.
The review included an inspection of
i
l
activities at your Vogtle facility. At the conclusion of the inspection, the
'
l
findings were discussed with those members of your staff identified in the
enclosed inspection report.
i
l
Areas examined during the inspection ' are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
!
identified.
{
l
Your attention is invited to unresolved items identified in the inspection
t
,
report.
These matters will be pursued during future inspections.
l
l
t
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, ,
l
i
l
Title 10, Code of Fedeial Regulations, a copy of this letter and its enclosure
.
I
will be placed in the NRC Public Document Room.
l
,
Should you have any questions concerning this letter, please contact us.
Sincerely,
i
-
,
'hI
a
Alan R. Herdt, Chief
.
Engineering Branch
Division of Reactor Safety
.
Enclosure:
(See page 2)
i
h$k
$0C0
t i
skal
,
'.
AUS 231988
-
.
.
Georgia Power Company
2
Enclosure:
NRC Inspectio,1' Report
cc w/encis:
R. P. Mcdonald, Executive Vice
President, Nuclear Operatfons
P. D. Rice, Vice President, Project
Director
C. W. Hayes, Vogtle Quality
Assurance Manager
G. B. Bockhold, Jr., General Manager
Nuclear Operations
L. T. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Censumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
bec w/encls:
E. Reis, OGC
J. Hopkins, NRR
M. SinKule, RII
DRS, Technical Assistant
NRC Resident Inspector
Document Control Desk
State of Georgia
II
RII
RII
t
'
u
n1
bS kule
08/ // 88
08/ /88
08/h /88
/
.-
_
....
.
.
.
ENCLOSURE 1
List of Unresolved Items Identified in Module 6
1.
Unresolved Item 88-27-01, Resolve Items' Identified in Geadiness Review
Module 6.
a.
The licensee has used non-specified colors for some external cabinet
labels on electrical equipment. Black labels are found on equipment
which is otherwise color coded for a particular safety train,
b.
No drip-loop was provided in some of the cables entering cabinet
2-1805-53-BBB in a room containing automatic sprinklers.
c.
The licensee has not provided assurance that there will not be
excessive heat buildup in the junction boxes above the regulating
transformers.
The condition could be aggravated where the conduit
is in physical contact with the hot transformer 2-1807-Y3-RX7.
d.
The vertical cicarance between the 2-1806-Q3-DA1 cabinet and the
cable tray support arm is less than the specified 1-1/2 inches.
2.
Unresolved Item 88-27-02, Incorporate Protective Relaying Design into
the FSAR.
The GPC Protection Engineering Section designs the relay protection system
for all the GPC generating plants, including the development of Relaying
Data Sheets.
This GPC design function is not provided for in the FSAR,
which assigns the design function to the Architect / Engineer Bechtel Power
Corporation (BPC).