ML20153E822
| ML20153E822 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/19/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20153E827 | List: |
| References | |
| CAL-85-07, CAL-85-7, NUDOCS 8602250167 | |
| Download: ML20153E822 (2) | |
See also: IR 05000285/1985026
Text
__ _
,- _
_
_ _ _
--
.
,
..
.
l
'
0;
s-
,
In Reply' Refer To:
FEB 19 M
Docket:
50-285/85-26
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. A. R. Johnson and D. E. Norman
of this office during the period November 18-22, 1985, of activities authorized
by NRC Operating License DPR-40 for Fort Calhoun Station, Unit 1 and to the
discussions of our findings with you and other members of your staff at the
conclusion of the inspection.
Discussions with you at a meeting in Region IV,
Arlington, Texas, on December 13, 1985, are also included.
Areas examined during the inspection included actions you have taken with regard
to six previously identified apparent violations or unresolved items, and two
open items, of NRC Inspection Report 50-285/85-09.
Within these areas, the
inspection consisted of selective examination of-procedures and representative
records, interviews with personnel, and observations by the inspectors.
Four of
these apparent violations remained open pending further licensee action and NRC
review.
One new unresolved item was identified regarding your apparent failure
to take the appropriate corrective actions, associated with the premature need
for repair of a safety-related motor, as a result of high inlet piping vibration.
Within the scope of the inspection, no violations or deviations were identified.
Our Confirmatory Action Letter (50-285/ CAL 85-07), dated December 20, 1985,
identified the corrective actions which, at that time, were yet to be completed
in connection with the deficiencies identified in NRC Inspection
.
Report 50-285/85-09.
These corrective actions are discussed in detail in the
enclosed inspection report.
Based on our inspection activities and your letter
dated January 11, 1986, we now consider the corrective actions in CAL 85-07 to
be complete. ,As stated in our letter dated January 17, 1986, we plan additional
followup on your corrective actions during further inspections.
Any potential enforcement actions associated with the apparent violations
identified in NRC Inspection Report 50-285/85-09 will be transmitted to you
.under separate cover.
f
f.
RPSBh,
PS
RPB
E0
RIV:RSB/ES
RSB:ES
RSB:E
g/ AJohj) son /twgDNorman
RElreland
DHunnicutt
DHun er
JEGagi} . do DPowers
'
,
'
G
2 /3 /86
F 1/6/86
%/4/86
P/g/86
A /5 /86
2.//S/p
2//1/86
i
l
1
8602250167 860219
ADOCK 05
OS
j; 7 7 ,
o
I
L
-
. _ - .
>f
'
. .
1
Omaha Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
. _.
Cr;cinal Sigiied By.,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-285/85-26
cc w/ enclosure:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- MIS System
- RIV File
DRSP
- RSTS Operator
- RSB
A. Johnson
G. Zech, IE
D. Norman
U. Potopovs, IE
R. Wilson, IE
D. Powers, E0
- w/766
.
6
. .