ML20153E767
| ML20153E767 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/23/1988 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cruden D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| References | |
| NUDOCS 8809070005 | |
| Download: ML20153E767 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ - - _ _. _ _.
op
.~
August 23, 1988 Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN: Mr. D. S. Cruden, Vice President, Nuclear Operations
-P. O. Box 26666 Richmond, VA 23261 Gentlemen:
SUBJECT:
INSPECi10N AT THE SURRY FACILITY This letter is to inform you that a Safety System Functional Inspection (SSFI) will be conducted by a Region II inspection team at the Surry facility fron; September 12-16 and 26 30, 1988. The inspection effort will be focused on the service water system and associated systems served by service water.
The objective of this in?pection is to assess the operational readiness of the Surry service water system to meet its intended design function under all postulated conditions. The team leader will be Mr. G. A. Belisle.
This information was discussed between Mr. Belisle and Mrs. N. Hardwick, Manager Nuciear Programs and Licensing, on August 4,1988.
S*:ould you have any quest 10ns concarning this matter, we will be pleased to discuss them.
Sincerely, (original signed by L. Reyes)
Luis A. Reyes, Director Division of Reactor Projects cc:
D. L. Benson, Station Manager N. E. Hardwick, Manager - Nuclear Programs and Licensing bec: HRC Resident Inspector DRS Technical Assistant Document Control Desk
, Commonwealth of Virginia 4
R11 RI Ril Rif II RI ey[
GABplisle:sh CAJIII an FCafftrell AFGibson W hl 08/f1/88 8
/88 0843/88 08/I,. /38 08/y/88 08/y/88 I
i
\\0 8809070005 GSv823 PDR ADOCK 05000280 Q
-.-.