Forwards Safety Insp Repts 50-266/85-22 & 50-301/85-21 on 851201-860131.No Violation Noted
ML20153E688
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/12/1986
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20153E691 List:
References
NUDOCS 8602250099
Download: ML20153E688 (2)


See also: IR 05000266/1985022

Text

-

.

FEB 121985

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. L. Hague

sad R. J. Leemon of this office on December 1,1985 through January 31, 1986,

and a special inspection by Mr. R. A. Paul on December 17, 1985, through

December 18, 1985, of activities at Point Beach Nuclear Plant, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the

discussion of our findings with J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel. -

No violations of NRC requirements were identified during the course of this

inspection. ,

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this_ inspection.

Sincerely,

8602250099 860212

D* * n i t' n f 'w ?l,J , ~

r' +' a'" p'" ,u

>

'

PDR ADOCK 05000266

G PDR

N. J. Chrissotimos, Chief

Projects Branch 2

Enclosure: Inspection Reports

No. 50-266/85022(DRP);

No. 50-301/85021(DRP)

See Attached Distribution

RII RIII RIII

, / %g 4

Gr /mj JackTw Ch issotimos

\'

- _ _ - _ .-__. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ - _ _ _ - - - _ _ _ - _ - _ - . . _ _ - _ _ _ _ - - _ _ _ _ - - _ - _ - _ - - _

TEo / _ -

,; -

.

,-

~

.

Wisconsin Electric Power C'ompany : 2'

H

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager i

DCS/RSB:(RIDS)

Licensing Fee Management Branch

. Resident Inspector, RIII

. John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public' Service

Comission

,

l

-9

9

6

l

+