ML20153E440
| ML20153E440 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 09/02/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20153E444 | List: |
| References | |
| NUDOCS 8809060323 | |
| Download: ML20153E440 (2) | |
See also: IR 05000482/1988021
Text
..
,
s '.
, , ,
.
In Reply Refer To:
Docket: STN 50-482/88-21
"SEP ~~p g
l
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
i
Gentlemen:
This refers to the inspection conducted by Me.srs. D. R. Hunter and G. A. Pick
of this office during the period July 11-15, 1988, of activities authorized by
l
NRC Operating License NPF-42 for Wolf Creek Generating Station, and to the
'
discussion of our findings with members of your staff at the conclusion of the
,
inspection.
,
Areas examined during the inspection included nonlicensed staff training
'
licensed operator training and related followup items. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
'
The inspection finoings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2. Title 10. Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
!
We have also examined actions you have taken with regard to previously
identified inspection findtrgs. The status of these items is identified in
paragraph 2 of the enclosed report.
.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by + % Paperwork Reduction Act of 1980, PL 96-511.
.
i
RIV:01*
SRI:0PS*
C:0PS*
D:DRS*
D:
GAPick/cz
DHunter
JGagliardo
JLMilhoan
LJC'a Ila n
t
/ /88
/ /88
/ /88
/ /88
6/l/88
i
- Concurred previously
[
l
l
N
,
N
+
'
.
'
'*
'
'
, ,- .,
L
s
Wolf Creek Nuclear Operating Corporation
-2-
,
w
\\-
,
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
3
l
f
Sincerely,
l
'
Oridnal Signed I'y
!
i n 5%ey
i
L. J. Callan, Director
l
Division of Reactor Projects
!
,
Enclosures:
1.
Appendix A - Notice of Violation
0.
Appendix B - NRC Inspection Report
50-482/88-21 with/ Attachments
I
cc w/ enclosures.
Wcif Creek Nuclear Operating Corporation
i
ATTN: Otto Maynard, Manager -
of Licensing
,
P.O. Box 411
<
Burlington, Kansas 6683')
L
Wolf Creek Nuclear Operating Corporation
,
ATTN: Gary Boyer, Plart Manager
[
P.O. Box 411
Burlington, Kansas 66839
i
Kansas Corporation Comission
ATTN: Robert D. Elliott, Chief Engineer
Fourth Floor. Docking State Office Building
(
, Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director-
'
bcc to CMB (IE01)
[
bcc distrib. by RIV:
Myron Kannan ELD, MNBB (1)
,
- RRI
R. D. Martin, RA
!
- SectionChief(DRP/A)
- DRP
!
- RPB-DRSS
B. DeFayette, R111
- RlY File
Callaway, R!!!
[
- MIS System
- RSTS Operator
}
- Project Engineer DRP/A
G. F. Sanborn, EO
[
Lisa Shea, RM/ALF
- P. O'Connor, NRR Project Manager
i
- DRS
J. E. Gagliardo
f
- D
R. Hunter
- G. A. Pick
i
i
- w/766
i
I
!